X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495131416000

Well Details

Well ID: 0495131416000
Loading map...
Location: 00/16-14-049-13W5/0
Location Alias: 00/16-14-49-13 W5M
Location Alias 2: 00/16-14-049-13 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 13
Section: 14
County/Municipality: Yellowhead County
Well Name: VEI HZ PEMBINA 16-14-49-13
Operator Name: Vermilion Energy Inc.
License Number: 0492825
License Date: 2018-12-18
License Status: Issued
Spud Date: 2019-01-14
Final Drill Date: 2019-01-24
Well Total Depth: 4293.00 m
Surface Hole Latitude: 53.233764
Surface Hole Longitude: -115.812021

For data sources see[1][2]

Well History

Date Event
2018-12-18 Obtained License
2019-01-15 Lost Circulation Occurred
2019-01-16 Surface Casing Operation Performed
2019-01-19 Direction Drilling Operation Performed - Deviate
2019-01-20 Direction Drilling Operation Performed - Horizontal
2019-01-24 Finished Drilling
2019-01-24 Well Mode changed to Drilled and Cased
2019-01-25 Well Log Performed
2019-01-26 Production Casing Operation Performed
2019-01-27 Rig Released
2019-02-01 Well Log Performed
2019-02-03 Perforation Treatment Performed - Open-Hole Completion
2019-02-04 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-05 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-06 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-04 Well Began Production
2019-03-04 Well Fluid changed to Gas
2019-03-04 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-01-14 Ironhand Drilling Inc. 8 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-01-19 2293.30 Deviate (5 - 79 degrees)
2019-01-20 2618.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-02-03 Open Hole/Barefoot Completion 4285.50 4293.00 0
2019-02-05 Multi-Stage Fracture 3635.60 3635.70 0
2019-02-05 Multi-Stage Fracture 3555.40 3555.50 0
2019-02-05 Multi-Stage Fracture 3487.90 3488.00 0
2019-02-05 Multi-Stage Fracture 3406.00 3406.10 0
2019-02-06 Multi-Stage Fracture 3326.50 3326.60 0
2019-02-06 Multi-Stage Fracture 3247.20 3247.30 0
2019-02-06 Multi-Stage Fracture 3178.00 3178.10 0
2019-02-06 Multi-Stage Fracture 3097.10 3097.20 0
2019-02-06 Multi-Stage Fracture 3018.30 3018.40 0
2019-02-06 Multi-Stage Fracture 2938.90 2939.00 0
2019-02-04 Multi-Stage Fracture 4248.60 4248.70 0
2019-02-06 Multi-Stage Fracture 2874.40 2874.50 0
2019-02-06 Multi-Stage Fracture 2792.70 2792.80 0
2019-02-06 Multi-Stage Fracture 2712.40 2712.50 0
2019-02-06 Multi-Stage Fracture 2631.20 2631.30 0
2019-02-06 Multi-Stage Fracture 2577.70 2577.80 0
2019-02-04 Multi-Stage Fracture 4177.90 4178.00 0
2019-02-04 Multi-Stage Fracture 4097.80 4097.90 0
2019-02-05 Multi-Stage Fracture 4020.40 4020.50 0
2019-02-05 Multi-Stage Fracture 3940.80 3940.90 0
2019-02-05 Multi-Stage Fracture 3873.10 3873.20 0
2019-02-05 Multi-Stage Fracture 3795.30 3795.40 0
2019-02-05 Multi-Stage Fracture 3715.10 3715.20 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-02-04 2019-02-06 2,510 3,258 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 72.6325 N/A
FRAC SAND. 30/50 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 19.0174 N/A
AQUCAR DB 20 BJ Services Bactericide/Biocide 2.2-Dibromo-3-nitrilopropionamide 10222-01-2 100 0.0075 N/A
Dibromoacetonitrile 3252-43-5 100 0.0075 N/A
Polyethylene Glycol 25322-68-3 100 0.0075 N/A
Sodium Bromide 7647-15-6 100 0.0075 N/A
Water 7732-18-5 100 0.0075 N/A
FraCare BREC EP BJ Services Breaker Ammonium persulphate 7727-54-0 100 0.0111 N/A
BF-9L BJ Services Buffer potassium carbonate 584-08-7 100 0.1263 N/A
Potassium hydroxide 1310-58-3 100 0.1263 N/A
Water 7732-18-5 100 0.1263 N/A
ResCare CS BJ Services Clay Control Choline chloride 67-48-1 100 0.0539 N/A
Non-hazardous Not Available 100 0.0539 N/A
Water 7732-18-5 100 0.0539 N/A
XLW-8 BJ Services Crosslinker Glycerin 56-81-5 100 0.1101 N/A
Non-hazardous Not Available 100 0.1101 N/A
Sodium tetraborate 1303-96-4 100 0.1101 N/A
Nitrogen BJ Services Energizing Fluid Nitrogen 7727-37-9 100 7.3729 N/A
GW-3SLR BJ Services Gelling Agent Guar gum 9000-30-0 100 0.4307 N/A
Low toxicity base oils - Non-WHMIS Controlled Not Available 100 0.4307 N/A
FAW-30 BJ Services Surfactant Amine derivative 9842 100 0.0762 N/A
Glycerine 56-81-5 100 0.0762 N/A
Sodium chloride 7647-14-5 100 0.0762 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-02-03 2019-02-03 Central Water Distribution Facility 3449

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 7124 0.0 0.0 0.0
2020 2126 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-01-15 Lost Circulation 115.00 115.00
2019-02-10 No Incident Encountered 0.00 0.00

For data sources see[10]

References