X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495132213030

Well Details

Well ID: 0495132213030
Loading map...
Location: 03/13-22-049-13W5/0
Location Alias: 03/13-22-49-13 W5M
Location Alias 2: 03/13-22-049-13 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 13
Section: 22
County/Municipality: Yellowhead County
Well Name: VEI HZ PEMBINA 13-22-49-13
Operator Name: Vermilion Energy Inc.
License Number: 0477442
License Date: 2015-11-03
License Status: Issued
Spud Date: 2015-12-28
Final Drill Date: 2016-01-04
Well Total Depth: 3800.00 m
Surface Hole Latitude: 53.239552
Surface Hole Longitude: -115.810469

For data sources see[1][2]

Well History

Date Event
2015-11-03 Obtained License
2015-12-29 Surface Casing Operation Performed
2015-12-31 Direction Drilling Operation Performed - Deviate
2016-01-01 Direction Drilling Operation Performed - Horizontal
2016-01-04 Finished Drilling
2016-01-04 Well Log Performed
2016-01-04 Well Mode changed to Drilled and Cased
2016-01-05 Production Casing Operation Performed
2016-01-05 Well Fluid changed to Gas
2016-01-05 Well Mode changed to Testing
2016-01-06 Rig Released
2016-01-20 Well Log Performed
2016-01-25 Perforation Treatment Performed - Open-Hole Completion
2016-01-26 Perforation Treatment Performed - Multi-Stage Fracture
2016-01-27 Perforation Treatment Performed - Multi-Stage Fracture
2016-02-01 Well Began Production
2016-02-01 Well Fluid changed to Crude Oil
2016-02-01 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-12-28 Ironhand Drilling Inc. 5 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-12-31 2264.00 Deviate (5 - 79 degrees)
2016-01-01 2618.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-01-25 Open Hole/Barefoot Completion 3778.00 3800.00 0
2016-01-26 Multi-Stage Fracture 3217.70 3217.80 0
2016-01-26 Multi-Stage Fracture 3146.30 3146.40 0
2016-01-26 Multi-Stage Fracture 3075.40 3075.50 0
2016-01-26 Multi-Stage Fracture 3005.30 3005.40 0
2016-01-26 Multi-Stage Fracture 2936.60 2936.70 0
2016-01-26 Multi-Stage Fracture 2881.60 2881.70 0
2016-01-26 Multi-Stage Fracture 2824.20 2824.30 0
2016-01-26 Multi-Stage Fracture 2766.80 2766.90 0
2016-01-27 Multi-Stage Fracture 2709.50 2709.60 0
2016-01-27 Multi-Stage Fracture 2651.20 2651.30 0
2016-01-26 Multi-Stage Fracture 3773.30 3773.40 0
2016-01-26 Multi-Stage Fracture 3714.80 3714.90 0
2016-01-26 Multi-Stage Fracture 3643.10 3643.20 0
2016-01-26 Multi-Stage Fracture 3571.30 3571.40 0
2016-01-26 Multi-Stage Fracture 3501.20 3501.30 0
2016-01-26 Multi-Stage Fracture 3431.10 3431.20 0
2016-01-26 Multi-Stage Fracture 3359.60 3359.70 0
2016-01-26 Multi-Stage Fracture 3288.60 3288.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-01-26 2016-01-27 2,508 2,428 N/A
2 2016-01-27 2016-01-27 2,508 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 4.169 N/A
water Not Available 100 72.6508 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 22.1317 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 0.4533 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.009 N/A
dibromoacetonitrile 3252-43-5 100 0.009 N/A
non-hazardous ingredients Not Available 100 0.009 N/A
polyethylene glycol 25322-68-3 100 0.009 N/A
sodium bromide 7647-15-6 100 0.009 N/A
EnCap-HP Trican Breaker ammonium persulfate 7727-54-0 100 0.0072 N/A
cured acrylic resin Not Available 100 0.0072 N/A
silica crystalline 14808-60-7 100 0.0072 N/A
CC-6 Trican Clay Control choline chloride 67-48-1 100 0.125 N/A
formic acid 64-18-6 100 0.125 N/A
non-hazardous ingredients Not Available 100 0.125 N/A
FE-5 Trican Conductivity Enhancer D-Glucopyranose. oligomers. decyl octyl glycosides 68515-73-1 100 0.0374 N/A
non-hazardous ingredients Not Available 100 0.0374 N/A
WXB-10 Trican Crosslinker borate salts 1319-33-1 100 0.0862 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0862 N/A
WXB-77 Trican Crosslinker borate salts 1319-33-1 100 0.1597 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.1597 N/A
WG-111d Trican Gelling Agent guar gum 9000-30-0 100 0.1743 N/A
2 GBE-1:5 Trican Breaker non-hazardous ingredients Not Available 100 0.0098 N/A
propylene glycol 57-55-6 100 0.0098 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-01-19 2016-01-24 Groundwater - Non-saline less than or equal to 150m deep 1294
2016-01-19 2016-01-24 Groundwater - Non-saline less than or equal to 150m deep 1297

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 7593 0.0 0.0 0.0
2017 7871 0.0 0.0 0.0
2018 7749 0.0 0.0 0.0
2019 6678 0.0 0.0 0.0
2020 1999 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-01-06 No Incident Encountered 0.00 0.00
2016-02-04 No Incident Encountered 0.00 0.00

For data sources see[10]

References