X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495132304020

Well Details

Well ID: 0495132304020
Loading map...
Location: 02/04-23-049-13W5/0
Location Alias: 02/04-23-49-13 W5M
Location Alias 2: 02/04-23-049-13 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 13
Section: 23
County/Municipality: Yellowhead County
Well Name: RIDGEBACK PEMBINA 4-23-49-13
Operator Name: Ridgeback Resources Inc.
License Number: 0424853
License Date: 2010-10-21
License Status: Issued
Spud Date: 2010-11-12
Final Drill Date: 2010-11-24
Well Total Depth: 3619.00 m
Surface Hole Latitude: 53.239072
Surface Hole Longitude: -115.776972

For data sources see[1][2]

Well History

Date Event
2010-10-21 Obtained License
2010-11-14 Surface Casing Operation Performed
2010-11-16 Direction Drilling Operation Performed - Horizontal
2010-11-18 Well Log Performed
2010-11-24 Finished Drilling
2010-11-24 Perforation Treatment Performed - Open-Hole Completion
2010-11-24 Well Log Performed
2010-11-24 Well Mode changed to Drilled and Cased
2010-11-27 Liner Casing Operation Performed
2010-11-27 Production Casing Operation Performed
2010-11-28 Rig Released
2010-12-21 Well Log Performed
2011-01-19 Perforation Treatment Performed - Multi-Stage Fracture
2011-01-20 Perforation Treatment Performed - Multi-Stage Fracture
2011-03-04 Well Began Production
2011-03-04 Well Fluid changed to Crude Oil
2011-03-04 Well Mode changed to Flowing
2017-04-01 Well Fluid changed to Crude Oil
2017-04-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-11-16 1544.20 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-11-24 Open Hole/Barefoot Completion 3615.00 3619.00 0
2011-01-19 Multi-Stage Fracture 3054.10 3054.20 0
2011-01-19 Multi-Stage Fracture 2988.60 2988.70 0
2011-01-19 Multi-Stage Fracture 2923.80 2923.90 0
2011-01-19 Multi-Stage Fracture 2870.70 2870.80 0
2011-01-20 Multi-Stage Fracture 2807.00 2807.10 0
2011-01-20 Multi-Stage Fracture 2741.50 2741.60 0
2011-01-20 Multi-Stage Fracture 2676.60 2676.70 0
2011-01-20 Multi-Stage Fracture 2612.40 2612.50 0
2011-01-20 Multi-Stage Fracture 2548.10 2548.20 0
2011-01-20 Multi-Stage Fracture 2484.60 2484.70 0
2011-01-19 Multi-Stage Fracture 3579.90 3580.00 0
2011-01-20 Multi-Stage Fracture 2419.90 2420.00 0
2011-01-20 Multi-Stage Fracture 2354.80 2354.90 0
2011-01-19 Multi-Stage Fracture 3507.10 3507.20 0
2011-01-19 Multi-Stage Fracture 3441.70 3441.80 0
2011-01-19 Multi-Stage Fracture 3375.70 3375.80 0
2011-01-19 Multi-Stage Fracture 3312.00 3312.10 0
2011-01-19 Multi-Stage Fracture 3247.80 3247.90 0
2011-01-19 Multi-Stage Fracture 3183.70 3183.80 0
2011-01-19 Multi-Stage Fracture 3119.20 3119.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 5921 0.0 0.0 0.0
2012 7475 0.0 0.0 0.0
2013 8005 0.0 0.0 0.0
2014 8495 0.0 0.0 0.0
2015 8518 0.0 0.0 0.0
2016 8731 0.0 0.0 0.0
2017 8679 0.0 0.0 0.0
2018 8523 0.0 0.0 0.0
2019 8665 0.0 0.0 0.0
2020 2179 0.0 0.0 0.0

For data sources see[6]

References