X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495132313000

Well Details

Well ID: 0495132313000
Loading map...
Location: 00/13-23-049-13W5/0
Location Alias: 00/13-23-49-13 W5M
Location Alias 2: 00/13-23-049-13 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 13
Section: 23
County/Municipality: Yellowhead County
Well Name: RIDGEBACK PEMBINA 13-23-49-13
Operator Name: Ridgeback Resources Inc.
License Number: 0422311
License Date: 2010-07-30
License Status: Issued
Spud Date: 2010-09-04
Final Drill Date: 2010-09-15
Well Total Depth: 3632.00 m
Surface Hole Latitude: 53.247501
Surface Hole Longitude: -115.776974

For data sources see[1][2]

Well History

Date Event
2010-07-30 Obtained License
2010-09-04 Well Log Performed
2010-09-05 Surface Casing Operation Performed
2010-09-08 Direction Drilling Operation Performed - Horizontal
2010-09-15 Finished Drilling
2010-09-15 Perforation Treatment Performed - Open-Hole Completion
2010-09-15 Well Mode changed to Drilled and Cased
2010-09-17 Liner Casing Operation Performed
2010-09-17 Production Casing Operation Performed
2010-09-18 Rig Released
2010-10-13 Well Log Performed
2010-10-22 Perforation Treatment Performed - Multi-Stage Fracture
2010-10-23 Perforation Treatment Performed - Multi-Stage Fracture
2010-10-24 Well Began Production
2010-10-24 Well Fluid changed to Crude Oil
2010-10-24 Well Mode changed to Pumping
2010-10-27 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-09-08 1487.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-09-15 Open Hole/Barefoot Completion 3616.00 3632.00 0
2010-10-23 Multi-Stage Fracture 2776.70 2776.80 0
2010-10-23 Multi-Stage Fracture 2706.30 2706.40 0
2010-10-23 Multi-Stage Fracture 2646.90 2647.00 0
2010-10-23 Multi-Stage Fracture 2587.20 2587.30 0
2010-10-23 Multi-Stage Fracture 2527.60 2527.70 0
2010-10-23 Multi-Stage Fracture 2469.30 2469.40 0
2010-10-23 Multi-Stage Fracture 2410.20 2410.30 0
2010-10-23 Multi-Stage Fracture 2351.40 2351.50 0
2010-10-23 Multi-Stage Fracture 2291.80 2291.90 0
2010-10-23 Multi-Stage Fracture 2232.70 2232.80 0
2010-10-22 Multi-Stage Fracture 3581.60 3581.70 0
2010-10-22 Multi-Stage Fracture 3525.70 3525.80 0
2010-10-22 Multi-Stage Fracture 3465.40 3465.50 0
2010-10-22 Multi-Stage Fracture 3405.30 3405.40 0
2010-10-22 Multi-Stage Fracture 3345.20 3345.30 0
2010-10-22 Multi-Stage Fracture 3285.50 3285.60 0
2010-10-22 Multi-Stage Fracture 3225.80 3225.90 0
2010-10-22 Multi-Stage Fracture 3165.90 3166.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 674 0.0 0.0 0.0
2011 4686 0.0 0.0 0.0
2012 8066 0.0 0.0 0.0
2013 8174 0.0 0.0 0.0
2014 8495 0.0 0.0 0.0
2015 8157 0.0 0.0 0.0
2016 8612 0.0 0.0 0.0
2017 8605 0.0 0.0 0.0
2018 8601 0.0 0.0 0.0
2019 8533 0.0 0.0 0.0
2020 2107 0.0 0.0 0.0

For data sources see[6]

References