X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495132601000

Well Details

Well ID: 0495132601000
Loading map...
Location: 00/01-26-049-13W5/0
Location Alias: 00/01-26-49-13 W5M
Location Alias 2: 00/01-26-049-13 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 13
Section: 26
County/Municipality: Yellowhead County
Well Name: VEI HZ PEMBINA 1-26-49-13
Operator Name: Vermilion Energy Inc.
License Number: 0470710
License Date: 2014-10-17
License Status: Issued
Spud Date: 2014-11-23
Final Drill Date: 2014-12-02
Well Total Depth: 3720.00 m
Surface Hole Latitude: 53.268816
Surface Hole Longitude: -115.782521

For data sources see[1][2]

Well History

Date Event
2014-10-17 Obtained License
2014-11-24 Surface Casing Operation Performed
2014-11-26 Direction Drilling Operation Performed - Deviate
2014-11-27 Direction Drilling Operation Performed - Horizontal
2014-12-02 Finished Drilling
2014-12-02 Well Log Performed
2014-12-02 Well Mode changed to Drilled and Cased
2014-12-04 Production Casing Operation Performed
2014-12-05 Rig Released
2015-01-01 Well Began Production
2015-01-01 Well Fluid changed to Crude Oil
2015-01-01 Well Mode changed to Pumping
2015-01-18 Well Log Performed
2015-01-22 Perforation Treatment Performed - Open-Hole Completion
2015-01-23 Perforation Treatment Performed - Multi-Stage Fracture
2015-01-27 Perforation Treatment Performed - Multi-Stage Fracture
2015-01-28 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-11-23 Ironhand Drilling Inc. 5 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-11-26 1710.80 Deviate (5 - 79 degrees)
2014-11-27 2007.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-01-22 Open Hole/Barefoot Completion 3709.00 3720.00 0
2015-01-28 Multi-Stage Fracture 3134.90 3135.00 0
2015-01-28 Multi-Stage Fracture 3059.20 3059.30 0
2015-01-28 Multi-Stage Fracture 2983.30 2983.40 0
2015-01-28 Multi-Stage Fracture 2921.50 2921.60 0
2015-01-28 Multi-Stage Fracture 2845.70 2845.80 0
2015-01-28 Multi-Stage Fracture 2770.80 2770.90 0
2015-01-28 Multi-Stage Fracture 2695.50 2695.60 0
2015-01-28 Multi-Stage Fracture 2633.70 2633.80 0
2015-01-28 Multi-Stage Fracture 2557.90 2558.00 0
2015-01-28 Multi-Stage Fracture 2482.00 2482.10 0
2015-01-23 Multi-Stage Fracture 3685.60 3685.70 0
2015-01-28 Multi-Stage Fracture 2420.60 2420.70 0
2015-01-28 Multi-Stage Fracture 2344.50 2344.60 0
2015-01-28 Multi-Stage Fracture 2271.40 2271.50 0
2015-01-28 Multi-Stage Fracture 2196.50 2196.60 0
2015-01-28 Multi-Stage Fracture 2121.50 2121.60 0
2015-01-28 Multi-Stage Fracture 2073.80 2073.90 0
2015-01-23 Multi-Stage Fracture 3635.40 3635.50 0
2015-01-23 Multi-Stage Fracture 3560.50 3560.60 0
2015-01-23 Multi-Stage Fracture 3485.30 3485.40 0
2015-01-23 Multi-Stage Fracture 3423.70 3423.80 0
2015-01-27 Multi-Stage Fracture 3347.50 3347.60 0
2015-01-27 Multi-Stage Fracture 3272.60 3272.70 0
2015-01-28 Multi-Stage Fracture 3196.70 3196.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-01-23 2015-01-28 1,926 5,243 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 8.6358 N/A
water Not Available 100 88.6101 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 2.788 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 0.2299 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 0.2087 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0243 N/A
dibromoacetonitrile 3252-43-5 100 0.0243 N/A
non-hazardous ingredients Not Available 100 0.0243 N/A
polyethylene glycol 25322-68-3 100 0.0243 N/A
sodium bromide 7647-15-6 100 0.0243 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.1918 N/A
water Not Available 100 0.1918 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.045 N/A
propylene glycol 57-55-6 100 0.045 N/A
GFR-1 Trican Friction Reducer non-hazardous ingredients Not Available 100 0.1168 N/A
GSI-1 Trican Scale Inhibitor non-hazardous ingredients Not Available 100 0.0416 N/A
SS-7 Trican Surfactant aliphatic alcohol 1111 100 0.0392 N/A
aminofunctional polymer 1111 100 0.0392 N/A
distillates (petroleum). sweet medium 64741-86-2 100 0.0392 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-01-22 2015-01-22 Recycled Fracturing Water (treated at well site) 393
2015-01-22 2015-01-28 Groundwater - Non-saline less than or equal to 150m deep 5200

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 7525 0.0 0.0 0.0
2016 8636 0.0 0.0 0.0
2017 8745 0.0 0.0 0.0
2018 8719 0.0 0.0 0.0
2019 8723 0.0 0.0 0.0
2020 2135 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-12-05 No Incident Encountered 0.00 0.00
2015-02-01 No Incident Encountered 0.00 0.00

For data sources see[10]

References