X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495132704000

Well Details

Well ID: 0495132704000
Loading map...
Location: 00/04-27-049-13W5/0
Location Alias: 00/04-27-49-13 W5M
Location Alias 2: 00/04-27-049-13 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 13
Section: 27
County/Municipality: Yellowhead County
Well Name: VEI HZ WESTPEM 4-27-49-13
Operator Name: Vermilion Energy Inc.
License Number: 0490990
License Date: 2018-09-17
License Status: Issued
Spud Date: 2018-10-11
Final Drill Date: 2018-10-19
Well Total Depth: 3920.00 m
Surface Hole Latitude: 53.251286
Surface Hole Longitude: -115.804519

For data sources see[1][2]

Well History

Date Event
2018-09-17 Obtained License
2018-10-11 Surface Casing Operation Performed
2018-10-14 Direction Drilling Operation Performed - Deviate
2018-10-15 Direction Drilling Operation Performed - Horizontal
2018-10-19 Finished Drilling
2018-10-19 Well Log Performed
2018-10-19 Well Mode changed to Drilled and Cased
2018-10-20 Well Log Performed
2018-10-21 Production Casing Operation Performed
2018-10-21 Rig Released
2018-11-12 Perforation Treatment Performed - Open-Hole Completion
2018-11-13 Perforation Treatment Performed - Multi-Stage Fracture
2018-11-14 Perforation Treatment Performed - Multi-Stage Fracture
2018-12-06 Well Began Production
2018-12-06 Well Fluid changed to Gas
2018-12-06 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-10-11 Ironhand Drilling Inc. 5 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-10-14 2245.30 Deviate (5 - 79 degrees)
2018-10-15 2581.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-11-12 Open Hole/Barefoot Completion 3915.00 3920.00 0
2018-11-13 Multi-Stage Fracture 3276.70 3276.80 0
2018-11-13 Multi-Stage Fracture 3208.30 3208.40 0
2018-11-13 Multi-Stage Fracture 3128.90 3129.00 0
2018-11-14 Multi-Stage Fracture 3060.70 3060.80 0
2018-11-14 Multi-Stage Fracture 2978.40 2978.50 0
2018-11-14 Multi-Stage Fracture 2910.40 2910.50 0
2018-11-14 Multi-Stage Fracture 2827.90 2828.00 0
2018-11-14 Multi-Stage Fracture 2761.20 2761.30 0
2018-11-14 Multi-Stage Fracture 2692.30 2692.40 0
2018-11-13 Multi-Stage Fracture 3890.70 3890.80 0
2018-11-13 Multi-Stage Fracture 3803.10 3803.20 0
2018-11-13 Multi-Stage Fracture 3734.60 3734.70 0
2018-11-13 Multi-Stage Fracture 3657.90 3658.00 0
2018-11-13 Multi-Stage Fracture 3576.40 3576.50 0
2018-11-13 Multi-Stage Fracture 3508.60 3508.70 0
2018-11-13 Multi-Stage Fracture 3426.00 3426.10 0
2018-11-13 Multi-Stage Fracture 3356.90 3357.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-11-13 2018-11-14 2,501 0 N/A
2 2018-11-14 2018-11-14 2,501 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water (Including Mix Water Supplied by Client)* 7732-18-5 100 80.1631 N/A
YF125Flex. N002 Schlumberger Quartz. Crystalline silica 14808-60-7 100 18.2218 N/A
YF125Flex. N002 Schlumberger Energizing Fluid 2-hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.0641 N/A
Acetic acid 64-19-7 100 0.0009 N/A
Amines. dicoco alkylmethyl 61788-62-3 100 0 N/A
Diammonium peroxodisulphate 7727-54-0 100 0.0061 N/A
Dicoco dimethyl quaternary ammonium chloride 61789-77-3 100 0.0004 N/A
Glycerol 56-81-5 100 0.0232 N/A
Guar gum 9000-30-0 100 0.2714 N/A
Magnesium silicate hydrate (talc) 14807-96-6 100 0 N/A
Methanol 67-56-1 100 0.0039 N/A
N-Coco. 1.3-diaminopropane di-acetate 61791-64-8 100 0.0021 N/A
Nitrogen. liquid form 7727-37-9 100 3.2811 N/A
Non-crystalline silica (impurity) 7631-86-9 100 0.0006 N/A
poly(tetrafluoroethylene) 9002-84-0 100 0 N/A
Polyethylene glycol monohexyl ether 31726-34-8 100 0.0053 N/A
Potassium borate 1332-77-0 100 0.0712 N/A
Potassium hydroxide 1310-58-3 100 0.0263 N/A
Propan-2-ol 67-63-0 100 0 N/A
Vinylidene chloride/methylacrylate copolymer 25038-72-6 100 0.0013 N/A
2 YF125Flex. N002 Schlumberger Energizing Fluid Dextrin 9004-53-9 100 0 N/A
Hemicellulase enzyme 9012-54-8 100 0 N/A
Lactose 63-42-3 100 0.0024 N/A
Maltodextrin 9050-36-6 100 0 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-11-13 2018-11-14 Central Water Distribution Facility 2549

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 678 0.0 0.0 0.0
2019 7285 0.0 0.0 0.0
2020 2104 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-10-21 No Incident Encountered 0.00 0.00
2018-11-20 No Incident Encountered 0.00 0.00

For data sources see[10]

References