X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504261702020

Well Details

Well ID: 0504261702020
Loading map...
Location: 02/02-17-050-26W4/0
Location Alias: 02/02-17-50-26 W4M
Location Alias 2: 02/02-17-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 17
County/Municipality: Leduc County
Well Name: PONDER - MODEL - LEDUC NO. 2
Operator Name: Murphy Oil Company Ltd.
License Number: 0004127
License Date: 1952-01-24
License Status: RecCertified
Spud Date: 1952-01-30
Final Drill Date: 1952-03-05
Well Total Depth: 1574.00 m
Surface Hole Latitude: 53.310522
Surface Hole Longitude: -113.765512

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-01-24 Obtained License
1952-03-01 Drill Stem Test Performed
1952-03-02 Production Casing Operation Performed
1952-03-05 Finished Drilling
1952-03-05 Perforation Treatment Performed - Open-Hole Completion
1952-03-05 Well Mode changed to Drilled and Cased
1952-03-06 Perforation Treatment Performed - Acid Wash - No Pressure
1952-03-07 Well Began Production
1952-03-07 Well Fluid changed to Crude Oil
1952-03-07 Well Mode changed to Flowing
1960-12-15 Well Fluid changed to Crude Oil
1960-12-15 Well Mode changed to Pumping
1967-06-20 Perforation Treatment Performed - Acid Wash - No Pressure
1986-10-01 Well Fluid changed to Crude Oil
1986-10-01 Well Mode changed to Suspended
1987-10-20 Well Fluid changed to Crude Oil
1987-10-20 Well Mode changed to Pumping
1989-10-25 Well Fluid changed to Crude Oil
1989-10-25 Well Mode changed to Suspended
1992-07-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-07-29 Perforation Treatment Performed - Jet Perforation
1992-07-29 Plug Back Performed
1992-07-29 Well Fluid changed to Crude Oil
1992-07-29 Well Log Performed
1992-07-29 Well Mode changed to Abandoned
1992-08-04 Perforation Treatment Performed - Cement Plug
1992-08-04 Perforation Treatment Performed - Remedial Casing
1992-09-02 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-03-05 Open Hole/Barefoot Completion 1559.40 1574.00 0
1952-03-06 Acid Wash 1559.40 1574.00 0
1967-06-20 Acid Wash 1559.40 1574.00 0
1992-07-29 Packing Device Capped w/Cement 1540.00 1548.00 0
1992-07-29 Perforation 160.00 160.50 7
1992-08-04 Remedial Casing Cementing 160.00 160.50 0
1992-08-04 Cement Plug 0.10 160.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1967 5220 0.0 0.0 0.0
1968 7959 0.0 0.0 0.0
1969 8687 0.0 0.0 0.0
1970 8543 0.0 0.0 0.0
1971 8735 0.0 0.0 0.0
1972 8580 0.0 0.0 0.0
1973 8579 0.0 0.0 0.0
1974 7719 0.0 0.0 0.0
1975 8590 0.0 0.0 0.0
1976 8571 0.0 0.0 0.0
1977 8513 0.0 0.0 0.0
1978 8583 0.0 0.0 0.0
1979 8355 0.0 0.0 0.0
1980 8295 0.0 0.0 0.0
1981 8367 0.0 0.0 0.0
1982 6503 0.0 0.0 0.0
1983 7210 0.0 0.0 0.0
1984 5875 0.0 0.0 0.0
1985 7225 0.0 0.0 0.0
1987 1748 0.0 0.0 0.0
1988 8614 0.0 0.0 0.0
1989 6723 0.0 0.0 0.0

For data sources see[5]

References