X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504262203020

Well Details

Well ID: 0504262203020
Loading map...
Location: 02/03-22-050-26W4/0
Location Alias: 02/03-22-50-26 W4M
Location Alias 2: 02/03-22-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 22
County/Municipality: Leduc County
Well Name: IMPERIAL LEDUC NO. 254
Operator Name: Imperial Oil Resources Limited
License Number: 0001102
License Date: 1949-01-03
License Status: Abandoned
Spud Date: 1949-01-08
Final Drill Date: 1950-02-04
Well Total Depth: 1566.70 m
Surface Hole Latitude: 53.324861
Surface Hole Longitude: -113.723557

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-01-03 Obtained License
1950-02-03 Drill Stem Test Performed
1950-02-04 Finished Drilling
1950-02-04 Well Mode changed to Drilled and Cased
1950-02-07 Production Casing Operation Performed
1950-02-10 Perforation Treatment Performed - Bullet Perforation
1950-02-12 Perforation Treatment Performed - Acid Wash - No Pressure
1950-02-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1950-02-13 Perforation Treatment Performed - Bullet Perforation
1950-02-15 Perforation Treatment Performed - Open-Hole Completion
1950-02-16 Perforation Treatment Performed - Jet Perforation
1950-02-17 Perforation Treatment Performed - Bullet Perforation
1950-02-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1950-07-01 Well Began Production
1950-07-01 Well Fluid changed to Crude Oil
1950-07-01 Well Mode changed to Pumping
1951-10-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-10-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-07-23 Perforation Treatment Performed - Cement Plug
1973-07-23 Well Abandoned
1973-07-23 Well Fluid changed to Crude Oil
1973-07-23 Well Mode changed to Abandoned
1973-07-25 Perforation Treatment Performed - Cement Plug
1973-07-31 Perforation Treatment Performed - Cement Plug
1973-08-01 Perforation Treatment Performed - Cement Plug

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-02-10 Bullet Perforation 1536.80 1551.40 10
1950-02-16 Perforation 1548.40 1561.50 7
1950-02-17 Bullet Perforation 1525.50 1527.00 7
1950-02-18 Acid Treatment 1525.50 1566.70 0
1951-10-09 Acid Treatment 1525.50 1566.70 0
1955-10-25 Acid Treatment 1525.50 1566.70 0
1973-07-23 Cement Plug 1510.00 1566.70 0
1973-07-25 Cement Plug 988.20 1047.90 0
1973-07-31 Cement Plug 560.80 602.00 0
1973-08-01 Cement Plug 367.60 408.40 0
1973-08-01 Cement Plug 74.70 182.90 0
1950-02-12 Acid Wash 1536.80 1551.40 0
1950-02-13 Bullet Perforation 1530.10 1536.50 10
1950-02-13 Acid Treatment 1530.10 1551.40 0
1950-02-15 Open Hole/Barefoot Completion 1560.60 1566.70 0
1950-02-16 Perforation 1539.20 1551.40 3
1950-02-16 Perforation 1530.10 1539.20 7
1950-02-16 Perforation 1525.50 1530.10 7
1950-02-16 Perforation 1527.00 1530.10 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8373 0.0 0.0 0.0
1968 5537 0.0 0.0 0.0
1969 5688 0.0 0.0 0.0
1970 4128 0.0 0.0 0.0
1971 1080 0.0 0.0 0.0

For data sources see[5]

References