X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504262314000

Well Details

Well ID: 0504262314000
Loading map...
Location: 00/14-23-050-26W4/0
Location Alias: 00/14-23-50-26 W4M
Location Alias 2: 00/14-23-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 23
County/Municipality: Leduc County
Well Name: IOR ET AL LEDUC 14-23-50-26
Operator Name: Imperial Oil Resources Limited
License Number: B0001948
License Date: 1947-11-14
License Status: RecCertified
Spud Date: 1947-11-27
Final Drill Date: 1947-12-29
Well Total Depth: 1632.50 m
Surface Hole Latitude: 53.335890
Surface Hole Longitude: -113.698821

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1947-11-14 Obtained License
1947-12-24 Drill Stem Test Performed
1947-12-29 Finished Drilling
1947-12-29 Well Mode changed to Drilled and Cased
1947-12-31 Production Casing Operation Performed
1948-01-05 Perforation Treatment Performed - Open-Hole Completion
1948-01-09 Well Began Production
1948-01-09 Well Fluid changed to Crude Oil
1948-01-09 Well Mode changed to Flowing
1948-06-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-08-05 Well Fluid changed to Crude Oil
1977-08-05 Well Mode changed to Pumping
1977-10-07 Perforation Treatment Performed - Cement Plug
1977-10-07 Perforation Treatment Performed - Open-Hole Completion
1983-04-08 Well Fluid changed to Crude Oil
1983-04-08 Well Mode changed to Suspended
1985-07-04 Well Log Performed
1985-07-08 Well Log Performed
1985-07-09 Perforation Treatment Performed - Cement Plug
1985-07-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-07-11 Perforation Treatment Performed - Selective Jet Perforations
1985-07-15 Perforation Treatment Performed - Cement Squeeze
1985-07-16 Well Log Performed
1985-07-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-07-17 Perforation Treatment Performed - Selective Jet Perforations
1985-07-17 Well Log Performed
1985-07-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-07-22 Perforation Treatment Performed - Jet Perforation
1985-07-22 Well Log Performed
1985-07-24 Perforation Treatment Performed - Selective Jet Perforations
1985-07-24 Well Log Performed
1985-07-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-07-29 Perforation Treatment Performed - Cement Squeeze
1985-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-07-31 Perforation Treatment Performed - Selective Jet Perforations
1985-07-31 Well Log Performed
1985-08-01 Well Fluid changed to Crude Oil
1985-08-01 Well Mode changed to Pumping
1989-10-25 Well Fluid changed to Crude Oil
1989-10-25 Well Mode changed to Suspended
1993-03-23 Well Log Performed
1995-04-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-04-10 Plug Back Performed
1995-04-10 Well Log Performed
1995-04-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-04-11 Perforation Treatment Performed - Jet Perforation
1995-04-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-04-20 Perforation Treatment Performed - Remedial Casing
1995-04-20 Well Fluid changed to Crude Oil
1995-04-20 Well Mode changed to Abandoned
1995-04-28 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1948-01-05 Open Hole/Barefoot Completion 1629.20 1632.50 0
1985-07-17 Acid Treatment 1627.60 1627.70 0
1985-07-22 Perforation 1625.70 1625.80 0
1985-07-22 Acid Treatment 1625.70 1625.80 0
1985-07-24 Selective Jet Perforations 1623.60 1623.70 0
1985-07-25 Acid Treatment 1623.60 1623.70 0
1985-07-29 Cement Squeeze 1623.60 1623.70 0
1985-07-31 Selective Jet Perforations 1624.40 1624.50 0
1985-07-31 Acid Treatment 1624.40 1624.50 0
1995-04-10 Packing Device Capped w/Cement 1603.00 1611.00 0
1995-04-11 Packing Device Capped w/Cement 1252.00 1260.00 0
1948-06-12 Acid Treatment 1629.20 1632.50 0
1995-04-11 Perforation 160.00 161.00 13
1995-04-20 Remedial Casing Cementing 160.00 161.00 0
1995-04-20 Packing Device Capped w/Cement 35.00 163.00 0
1977-10-07 Cement Plug 1630.10 1632.50 0
1977-10-07 Open Hole/Barefoot Completion 1629.20 1630.10 0
1985-07-09 Cement Plug 1629.10 1632.50 0
1985-07-11 Selective Jet Perforations 1628.50 1628.60 0
1985-07-11 Acid Treatment 1628.50 1628.60 0
1985-07-15 Cement Squeeze 1628.50 1628.60 0
1985-07-17 Selective Jet Perforations 1627.60 1627.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1967 3286 0.0 0.0 0.0
1968 1932 0.0 0.0 0.0
1969 552 0.0 0.0 0.0
1970 2366 0.0 0.0 0.0
1971 2704 0.0 0.0 0.0
1972 4200 0.0 0.0 0.0
1973 8253 0.0 0.0 0.0
1974 5608 0.0 0.0 0.0
1975 8155 0.0 0.0 0.0
1976 8435 0.0 0.0 0.0
1977 6727 0.0 0.0 0.0
1978 7908 0.0 0.0 0.0
1979 7523 0.0 0.0 0.0
1980 4997 0.0 0.0 0.0
1981 5140 0.0 0.0 0.0
1982 1416 0.0 0.0 0.0
1985 733 0.0 0.0 0.0
1986 6132 0.0 0.0 0.0
1987 6033 0.0 0.0 0.0
1988 7804 0.0 0.0 0.0
1989 5633 0.0 0.0 0.0

For data sources see[5]

References