X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504263101020

Well Details

Well ID: 0504263101020
Loading map...
Location: 02/01-31-050-26W4/0
Location Alias: 02/01-31-50-26 W4M
Location Alias 2: 02/01-31-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 31
County/Municipality: Leduc County
Well Name: IMPERIAL LEDUC NO. 507
Operator Name: Imperial Oil Resources Limited
License Number: 0005275
License Date: 1952-09-08
License Status: Abandoned
Spud Date: 1952-09-09
Final Drill Date: 1952-09-23
Well Total Depth: 1548.40 m
Surface Hole Latitude: 53.353852
Surface Hole Longitude: -113.784842

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-09-08 Obtained License
1952-09-23 Drill Stem Test Performed
1952-09-23 Finished Drilling
1952-09-23 Well Mode changed to Drilled and Cased
1952-09-24 Perforation Treatment Performed - Open-Hole Completion
1952-09-24 Production Casing Operation Performed
1952-09-29 Well Began Production
1952-09-29 Well Fluid changed to Crude Oil
1952-09-29 Well Mode changed to Flowing
1958-08-22 Well Fluid changed to Crude Oil
1958-08-22 Well Mode changed to Pumping
1961-10-17 Perforation Treatment Performed - Cement Plug
1961-10-17 Perforation Treatment Performed - Open-Hole Completion
1963-09-10 Perforation Treatment Performed - Cement Plug
1963-09-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-09-11 Perforation Treatment Performed - Jet Perforation
1969-08-15 Perforation Treatment Performed - Cement Plug
1969-08-18 Perforation Treatment Performed - Jet Perforation
1969-08-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-08-22 Well Fluid changed to Crude Oil
1984-08-22 Well Mode changed to Suspended
1996-03-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-03-26 Perforation Treatment Performed - Jet Perforation
1996-03-26 Plug Back Performed
1996-03-26 Well Log Performed
1996-05-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-05-22 Perforation Treatment Performed - Remedial Casing
1996-05-23 Well Abandoned
1996-05-23 Well Fluid changed to Crude Oil
1996-05-23 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-09-24 Open Hole/Barefoot Completion 1536.20 1548.40 0
1996-03-26 Packing Device Capped w/Cement 1502.00 1510.00 0
1996-03-26 Packing Device Capped w/Cement 1242.00 1250.00 0
1996-03-26 Perforation 162.90 163.90 13
1996-05-22 Remedial Casing Cementing 162.90 163.90 0
1996-05-22 Packing Device Capped w/Cement 45.40 165.00 0
1961-10-17 Cement Plug 1544.40 1548.40 0
1961-10-17 Open Hole/Barefoot Completion 1536.20 1544.40 0
1963-09-10 Cement Plug 1535.00 1543.20 0
1963-09-11 Perforation 1530.40 1533.40 7
1963-09-11 Acid Treatment 1530.40 1533.40 0
1969-08-15 Cement Plug 1528.00 1535.00 0
1969-08-18 Perforation 1522.20 1525.20 7
1969-08-19 Acid Treatment 1522.20 1525.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1969 2892 0.0 0.0 0.0
1970 8364 0.0 0.0 0.0
1971 8575 0.0 0.0 0.0
1972 8580 0.0 0.0 0.0
1973 8579 0.0 0.0 0.0
1974 8595 0.0 0.0 0.0
1975 8199 0.0 0.0 0.0
1976 8099 0.0 0.0 0.0
1977 8490 0.0 0.0 0.0
1978 8479 0.0 0.0 0.0
1979 8475 0.0 0.0 0.0
1980 8495 0.0 0.0 0.0
1981 8427 0.0 0.0 0.0
1982 6845 0.0 0.0 0.0
1983 5191 0.0 0.0 0.0
1984 3557 0.0 0.0 0.0

For data sources see[5]

References