If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0504263112000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.361427,"lon":-113.802188,"icon":""}]} |
Location: 00/12-31-050-26W4/0 | |
Location Alias: 00/12-31-50-26 W4M | |
Location Alias 2: 00/12-31-050-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 4 | |
Range: 26 | |
Section: 31 | |
County/Municipality: Parkland County | |
Well Name: MEC LEDUC-WB 12-31-50-26 | |
Operator Name: NEP Canada ULC | |
License Number: 0004313 | |
License Date: 1952-03-04 | |
License Status: RecCertified | |
Spud Date: 1952-03-08 | |
Final Drill Date: 1952-04-06 | |
Well Total Depth: 1582.50 m | |
Surface Hole Latitude: 53.361427 | |
Surface Hole Longitude: -113.802188 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1952-03-04 | Obtained License |
1952-03-28 | Drill Stem Test Performed |
1952-04-02 | Liner Casing Operation Performed |
1952-04-06 | Finished Drilling |
1952-04-06 | Well Mode changed to Drilled and Cased |
1952-04-09 | Perforation Treatment Performed - Acid Wash - No Pressure |
1952-04-09 | Perforation Treatment Performed - Jet Perforation |
1952-04-10 | Well Began Production |
1952-04-10 | Well Fluid changed to Crude Oil |
1952-04-10 | Well Mode changed to Flowing |
1973-10-30 | Well Fluid changed to Crude Oil |
1973-10-30 | Well Mode changed to Pumping |
1982-07-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-07-19 | Perforation Treatment Performed - Cement Squeeze |
1982-07-21 | Perforation Treatment Performed - Jet Perforation |
1982-07-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-02-11 | Perforation Treatment Performed - Cement Squeeze |
1986-02-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-02-12 | Perforation Treatment Performed - Jet Perforation |
1986-02-12 | Well Log Performed |
1986-02-13 | Well Log Performed |
1986-02-18 | Perforation Treatment Performed - Cement Squeeze |
1986-02-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-02-20 | Perforation Treatment Performed - Jet Perforation |
1986-02-20 | Well Log Performed |
1986-02-21 | Perforation Treatment Performed - Chemical Squeeze |
1988-08-22 | Well Log Performed |
1988-08-23 | Perforation Treatment Performed - Cement Squeeze |
1988-08-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-08-25 | Perforation Treatment Performed - Jet Perforation |
1988-08-29 | Perforation Treatment Performed - Cement Squeeze |
1988-08-30 | Perforation Treatment Performed - Jet Perforation |
1988-08-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-08-20 | Perforation Treatment Performed - Cement Squeeze |
1989-08-20 | Well Log Performed |
1989-08-21 | Perforation Treatment Performed - Jet Perforation |
1989-08-21 | Well Log Performed |
1989-08-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-08-22 | Perforation Treatment Performed - Jet Perforation |
1989-08-22 | Well Log Performed |
1989-09-28 | Well Fluid changed to Crude Oil |
1989-09-28 | Well Mode changed to Suspended |
1996-10-01 | Well Fluid changed to Crude Oil |
1996-10-01 | Well Mode changed to Pumping |
1998-10-01 | Well Fluid changed to Crude Oil |
1998-10-01 | Well Mode changed to Suspended |
2008-01-08 | Well Log Performed |
2008-01-13 | Well Log Performed |
2009-01-07 | Well Log Performed |
2009-01-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-01-08 | Perforation Treatment Performed - Jet Perforation |
2009-01-08 | Plug Back Performed |
2009-01-08 | Well Fluid changed to Crude Oil |
2009-01-08 | Well Log Performed |
2009-01-08 | Well Mode changed to Abandoned Zone |
2009-01-12 | Perforation Treatment Performed - Cement Squeeze |
2009-01-13 | Perforation Treatment Performed - Cement Squeeze |
2009-01-13 | Perforation Treatment Performed - Jet Perforation |
2009-01-14 | Perforation Treatment Performed - Cement Squeeze |
2009-01-14 | Perforation Treatment Performed - Jet Perforation |
2009-01-14 | Well Log Performed |
2009-01-16 | Well Log Performed |
2009-01-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-01-19 | Plug Back Performed |
2009-05-05 | Well Abandoned |
2009-05-05 | Well Fluid changed to Crude Oil |
2009-05-05 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1952-04-09 | Perforation | 1578.90 | 1580.40 | 13 |
1986-02-18 | Cement Squeeze | 1575.70 | 1575.80 | 0 |
1986-02-20 | Perforation | 1576.50 | 1576.60 | 0 |
1986-02-20 | Acid Treatment | 1576.50 | 1576.60 | 0 |
1986-02-21 | Chemical Squeeze | 1576.50 | 1576.60 | 0 |
1988-08-23 | Cement Squeeze | 1576.50 | 1576.60 | 0 |
1988-08-25 | Perforation | 1575.30 | 1575.40 | 13 |
1988-08-25 | Acid Treatment | 1575.30 | 1575.40 | 0 |
1988-08-29 | Cement Squeeze | 1575.30 | 1575.40 | 0 |
1988-08-30 | Perforation | 1574.40 | 1574.50 | 13 |
1988-08-31 | Acid Treatment | 1574.40 | 1574.50 | 0 |
1952-04-09 | Acid Wash | 1578.90 | 1580.40 | 0 |
1989-08-20 | Cement Squeeze | 1574.40 | 1574.50 | 0 |
1989-08-21 | Perforation | 1559.50 | 1560.50 | 7 |
1989-08-22 | Perforation | 1563.80 | 1564.80 | 7 |
1989-08-22 | Acid Treatment | 1559.50 | 1564.80 | 0 |
2009-01-08 | Packing Device Capped w/Cement | 1524.00 | 1554.00 | 0 |
2009-01-08 | Perforation | 1037.00 | 1038.00 | 20 |
2009-01-12 | Cement Squeeze | 1037.00 | 1038.00 | 0 |
2009-01-13 | Perforation | 314.00 | 315.00 | 20 |
2009-01-13 | Cement Squeeze | 314.00 | 315.00 | 0 |
2009-01-14 | Perforation | 180.00 | 181.00 | 20 |
1982-07-16 | Acid Treatment | 1578.90 | 1580.40 | 0 |
2009-01-14 | Cement Squeeze | 180.00 | 181.00 | 0 |
2009-01-19 | Packing Device Capped w/Cement | 59.60 | 117.30 | 0 |
1982-07-19 | Cement Squeeze | 1578.90 | 1580.40 | 0 |
1982-07-21 | Perforation | 1577.90 | 1578.00 | 10 |
1982-07-22 | Acid Treatment | 1577.90 | 1578.00 | 0 |
1986-02-11 | Cement Squeeze | 1577.90 | 1578.00 | 0 |
1986-02-12 | Perforation | 1575.70 | 1575.80 | 13 |
1986-02-12 | Acid Treatment | 1575.70 | 1575.80 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 6019 | 0.0 | 0.0 | 0.0 |
1973 | 1296 | 0.0 | 0.0 | 0.0 |
1974 | 8374 | 0.0 | 0.0 | 0.0 |
1975 | 7427 | 0.0 | 0.0 | 0.0 |
1976 | 8559 | 0.0 | 0.0 | 0.0 |
1977 | 7240 | 0.0 | 0.0 | 0.0 |
1978 | 8207 | 0.0 | 0.0 | 0.0 |
1979 | 4828 | 0.0 | 0.0 | 0.0 |
1980 | 4308 | 0.0 | 0.0 | 0.0 |
1981 | 852 | 0.0 | 0.0 | 0.0 |
1982 | 3044 | 0.0 | 0.0 | 0.0 |
1983 | 7835 | 0.0 | 0.0 | 0.0 |
1984 | 8419 | 0.0 | 0.0 | 0.0 |
1985 | 7019 | 0.0 | 0.0 | 0.0 |
1986 | 7580 | 0.0 | 0.0 | 0.0 |
1987 | 7528 | 0.0 | 0.0 | 0.0 |
1988 | 7694 | 0.0 | 0.0 | 0.0 |
1989 | 4848 | 0.0 | 0.0 | 0.0 |
1996 | 4628 | 0.0 | 0.0 | 0.0 |
1997 | 7957 | 0.0 | 0.0 | 0.0 |
1998 | 4042 | 0.0 | 0.0 | 0.0 |
For data sources see[5]