X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504263112000

Well Details

Well ID: 0504263112000
Loading map...
Location: 00/12-31-050-26W4/0
Location Alias: 00/12-31-50-26 W4M
Location Alias 2: 00/12-31-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 31
County/Municipality: Parkland County
Well Name: MEC LEDUC-WB 12-31-50-26
Operator Name: NEP Canada ULC
License Number: 0004313
License Date: 1952-03-04
License Status: RecCertified
Spud Date: 1952-03-08
Final Drill Date: 1952-04-06
Well Total Depth: 1582.50 m
Surface Hole Latitude: 53.361427
Surface Hole Longitude: -113.802188

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-03-04 Obtained License
1952-03-28 Drill Stem Test Performed
1952-04-02 Liner Casing Operation Performed
1952-04-06 Finished Drilling
1952-04-06 Well Mode changed to Drilled and Cased
1952-04-09 Perforation Treatment Performed - Acid Wash - No Pressure
1952-04-09 Perforation Treatment Performed - Jet Perforation
1952-04-10 Well Began Production
1952-04-10 Well Fluid changed to Crude Oil
1952-04-10 Well Mode changed to Flowing
1973-10-30 Well Fluid changed to Crude Oil
1973-10-30 Well Mode changed to Pumping
1982-07-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-07-19 Perforation Treatment Performed - Cement Squeeze
1982-07-21 Perforation Treatment Performed - Jet Perforation
1982-07-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-02-11 Perforation Treatment Performed - Cement Squeeze
1986-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-02-12 Perforation Treatment Performed - Jet Perforation
1986-02-12 Well Log Performed
1986-02-13 Well Log Performed
1986-02-18 Perforation Treatment Performed - Cement Squeeze
1986-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-02-20 Perforation Treatment Performed - Jet Perforation
1986-02-20 Well Log Performed
1986-02-21 Perforation Treatment Performed - Chemical Squeeze
1988-08-22 Well Log Performed
1988-08-23 Perforation Treatment Performed - Cement Squeeze
1988-08-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-08-25 Perforation Treatment Performed - Jet Perforation
1988-08-29 Perforation Treatment Performed - Cement Squeeze
1988-08-30 Perforation Treatment Performed - Jet Perforation
1988-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-08-20 Perforation Treatment Performed - Cement Squeeze
1989-08-20 Well Log Performed
1989-08-21 Perforation Treatment Performed - Jet Perforation
1989-08-21 Well Log Performed
1989-08-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-08-22 Perforation Treatment Performed - Jet Perforation
1989-08-22 Well Log Performed
1989-09-28 Well Fluid changed to Crude Oil
1989-09-28 Well Mode changed to Suspended
1996-10-01 Well Fluid changed to Crude Oil
1996-10-01 Well Mode changed to Pumping
1998-10-01 Well Fluid changed to Crude Oil
1998-10-01 Well Mode changed to Suspended
2008-01-08 Well Log Performed
2008-01-13 Well Log Performed
2009-01-07 Well Log Performed
2009-01-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-01-08 Perforation Treatment Performed - Jet Perforation
2009-01-08 Plug Back Performed
2009-01-08 Well Fluid changed to Crude Oil
2009-01-08 Well Log Performed
2009-01-08 Well Mode changed to Abandoned Zone
2009-01-12 Perforation Treatment Performed - Cement Squeeze
2009-01-13 Perforation Treatment Performed - Cement Squeeze
2009-01-13 Perforation Treatment Performed - Jet Perforation
2009-01-14 Perforation Treatment Performed - Cement Squeeze
2009-01-14 Perforation Treatment Performed - Jet Perforation
2009-01-14 Well Log Performed
2009-01-16 Well Log Performed
2009-01-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-01-19 Plug Back Performed
2009-05-05 Well Abandoned
2009-05-05 Well Fluid changed to Crude Oil
2009-05-05 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-04-09 Perforation 1578.90 1580.40 13
1986-02-18 Cement Squeeze 1575.70 1575.80 0
1986-02-20 Perforation 1576.50 1576.60 0
1986-02-20 Acid Treatment 1576.50 1576.60 0
1986-02-21 Chemical Squeeze 1576.50 1576.60 0
1988-08-23 Cement Squeeze 1576.50 1576.60 0
1988-08-25 Perforation 1575.30 1575.40 13
1988-08-25 Acid Treatment 1575.30 1575.40 0
1988-08-29 Cement Squeeze 1575.30 1575.40 0
1988-08-30 Perforation 1574.40 1574.50 13
1988-08-31 Acid Treatment 1574.40 1574.50 0
1952-04-09 Acid Wash 1578.90 1580.40 0
1989-08-20 Cement Squeeze 1574.40 1574.50 0
1989-08-21 Perforation 1559.50 1560.50 7
1989-08-22 Perforation 1563.80 1564.80 7
1989-08-22 Acid Treatment 1559.50 1564.80 0
2009-01-08 Packing Device Capped w/Cement 1524.00 1554.00 0
2009-01-08 Perforation 1037.00 1038.00 20
2009-01-12 Cement Squeeze 1037.00 1038.00 0
2009-01-13 Perforation 314.00 315.00 20
2009-01-13 Cement Squeeze 314.00 315.00 0
2009-01-14 Perforation 180.00 181.00 20
1982-07-16 Acid Treatment 1578.90 1580.40 0
2009-01-14 Cement Squeeze 180.00 181.00 0
2009-01-19 Packing Device Capped w/Cement 59.60 117.30 0
1982-07-19 Cement Squeeze 1578.90 1580.40 0
1982-07-21 Perforation 1577.90 1578.00 10
1982-07-22 Acid Treatment 1577.90 1578.00 0
1986-02-11 Cement Squeeze 1577.90 1578.00 0
1986-02-12 Perforation 1575.70 1575.80 13
1986-02-12 Acid Treatment 1575.70 1575.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 6019 0.0 0.0 0.0
1973 1296 0.0 0.0 0.0
1974 8374 0.0 0.0 0.0
1975 7427 0.0 0.0 0.0
1976 8559 0.0 0.0 0.0
1977 7240 0.0 0.0 0.0
1978 8207 0.0 0.0 0.0
1979 4828 0.0 0.0 0.0
1980 4308 0.0 0.0 0.0
1981 852 0.0 0.0 0.0
1982 3044 0.0 0.0 0.0
1983 7835 0.0 0.0 0.0
1984 8419 0.0 0.0 0.0
1985 7019 0.0 0.0 0.0
1986 7580 0.0 0.0 0.0
1987 7528 0.0 0.0 0.0
1988 7694 0.0 0.0 0.0
1989 4848 0.0 0.0 0.0
1996 4628 0.0 0.0 0.0
1997 7957 0.0 0.0 0.0
1998 4042 0.0 0.0 0.0

For data sources see[5]

References