X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504263401020

Well Details

Well ID: 0504263401020
Loading map...
Location: 02/01-34-050-26W4/0
Location Alias: 02/01-34-50-26 W4M
Location Alias 2: 02/01-34-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 34
County/Municipality: Devon
Well Name: IMPERIAL LEDUC NO. 239 WELL
Operator Name: Imperial Oil Resources Limited
License Number: 0001894
License Date: 1950-08-23
License Status: Abandoned
Spud Date: 1950-08-22
Final Drill Date: 1950-09-09
Well Total Depth: 1516.40 m
Surface Hole Latitude: 53.354002
Surface Hole Longitude: -113.712476

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-08-23 Obtained License
1950-09-09 Finished Drilling
1950-09-09 Well Mode changed to Drilled and Cased
1950-09-10 Drill Stem Test Performed
1950-09-11 Production Casing Operation Performed
1950-09-13 Perforation Treatment Performed - Acid Wash - No Pressure
1950-09-13 Perforation Treatment Performed - Bullet Perforation
1950-09-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1950-09-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1950-09-20 Well Began Production
1950-09-20 Well Fluid changed to Crude Oil
1950-09-20 Well Mode changed to Flowing
1960-09-19 Well Fluid changed to Crude Oil
1960-09-19 Well Mode changed to Pumping
1973-07-26 Perforation Treatment Performed - Cement Plug
1973-07-26 Well Abandoned
1973-07-26 Well Fluid changed to Crude Oil
1973-07-26 Well Mode changed to Abandoned
1973-07-31 Perforation Treatment Performed - Cement Plug
1973-08-01 Perforation Treatment Performed - Cement Plug
1973-08-03 Perforation Treatment Performed - Cement Plug

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-09-13 Bullet Perforation 1486.80 1490.50 10
1973-08-03 Cement Plug 137.20 182.90 0
1950-09-13 Bullet Perforation 1492.00 1508.80 10
1950-09-13 Acid Wash 1486.80 1508.80 0
1950-09-15 Acid Treatment 1486.80 1508.80 0
1950-09-16 Acid Treatment 1486.80 1508.80 0
1973-07-26 Cement Plug 1458.50 1516.40 0
1973-07-31 Cement Plug 807.40 838.80 0
1973-08-01 Cement Plug 521.50 571.50 0
1973-08-03 Cement Plug 324.30 365.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1968 6020 0.0 0.0 0.0
1969 8759 0.0 0.0 0.0
1970 8723 0.0 0.0 0.0
1971 8759 0.0 0.0 0.0
1972 6156 0.0 0.0 0.0

For data sources see[5]

References