X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504263505000

Well Details

Well ID: 0504263505000
Loading map...
Location: 00/05-35-050-26W4/0
Location Alias: 00/05-35-50-26 W4M
Location Alias 2: 00/05-35-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 35
County/Municipality: Devon
Well Name: IMPERIAL LEDUC NO. 37
Operator Name: Imperial Oil Resources Limited
License Number: B0002000
License Date: 1948-01-14
License Status: RecExempt
Spud Date: 1948-02-01
Final Drill Date: 1948-03-07
Well Total Depth: 1553.60 m
Surface Hole Latitude: 53.357762
Surface Hole Longitude: -113.706155

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1948-01-14 Obtained License
1948-02-29 Drill Stem Test Performed
1948-03-06 Drill Stem Test Performed
1948-03-07 Finished Drilling
1948-03-07 Well Mode changed to Drilled and Cased
1948-03-09 Production Casing Operation Performed
1948-03-11 Perforation Treatment Performed - Open-Hole Completion
1948-03-13 Well Began Production
1948-03-13 Well Fluid changed to Crude Oil
1948-03-13 Well Mode changed to Flowing
1979-12-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-04-11 Well Fluid changed to Crude Oil
1983-04-11 Well Mode changed to Suspended
1988-01-07 Perforation Treatment Performed - Open-Hole Completion
1988-01-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-01-08 Well Log Performed
1988-01-11 Perforation Treatment Performed - Cement Squeeze
1988-01-11 Plug Back Performed
1988-01-11 Well Fluid changed to Crude Oil
1988-01-11 Well Mode changed to Abandoned
1988-01-12 Perforation Treatment Performed - Cement Squeeze
1988-01-12 Perforation Treatment Performed - Jet Perforation
1988-01-12 Plug Back Performed
1988-01-12 Well Log Performed
1988-01-13 Perforation Treatment Performed - Cement Squeeze
1988-01-13 Perforation Treatment Performed - Jet Perforation
1988-01-13 Plug Back Performed
1988-01-15 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1948-03-11 Open Hole/Barefoot Completion 1549.00 1553.60 0
1979-12-19 Packing Device Capped w/Cement 1346.00 1350.00 0
1988-01-07 Open Hole/Barefoot Completion 1549.00 1553.60 0
1988-01-08 Acid Treatment 1549.00 1553.60 0
1988-01-11 Cement Squeeze 1549.00 1553.60 0
1988-01-12 Perforation 200.00 200.30 5
1988-01-12 Cement Squeeze 200.00 200.30 0
1988-01-13 Perforation 110.00 110.00 5
1988-01-13 Cement Squeeze 110.00 110.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1974 36 0.0 0.0 0.0

For data sources see[5]

References