X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504270116000

Well Details

Well ID: 0504270116000
Loading map...
Location: 00/16-01-050-27W4/0
Location Alias: 00/16-01-50-27 W4M
Location Alias 2: 00/16-01-050-27 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 27
Section: 01
County/Municipality: Leduc County
Well Name: IMPERIAL LION LEDUC 16-1-50-27
Operator Name: Imperial Oil Resources Limited
License Number: B0002388
License Date: 1948-10-05
License Status: RecCertified
Spud Date: 1948-10-24
Final Drill Date: 1948-12-26
Well Total Depth: 1653.50 m
Surface Hole Latitude: 53.293064
Surface Hole Longitude: -113.807420

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1948-10-05 Obtained License
1948-12-10 Drill Stem Test Performed
1948-12-19 Drill Stem Test Performed
1948-12-20 Drill Stem Test Performed
1948-12-21 Drill Stem Test Performed
1948-12-22 Drill Stem Test Performed
1948-12-23 Drill Stem Test Performed
1948-12-26 Drill Stem Test Performed
1948-12-26 Finished Drilling
1948-12-26 Well Mode changed to Drilled and Cased
1949-01-03 Production Casing Operation Performed
1949-01-08 Perforation Treatment Performed - Bullet Perforation
1949-01-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1949-01-15 Perforation Treatment Performed - Bullet Perforation
1949-01-16 Perforation Treatment Performed - Cement Plug
1949-01-20 Perforation Treatment Performed - Bullet Perforation
1949-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1949-01-23 Well Began Production
1949-01-23 Well Fluid changed to Crude Oil
1949-01-23 Well Mode changed to Flowing
1960-12-08 Well Fluid changed to Crude Oil
1960-12-08 Well Mode changed to Pumping
1984-02-22 Well Fluid changed to Crude Oil
1984-02-22 Well Mode changed to Suspended
1994-07-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-07-14 Perforation Treatment Performed - Jet Perforation
1994-07-14 Plug Back Performed
1994-07-14 Well Log Performed
1994-08-11 Perforation Treatment Performed - Cement Plug
1994-08-11 Perforation Treatment Performed - Remedial Casing
1994-08-11 Well Fluid changed to Crude Oil
1994-08-11 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-01-08 Bullet Perforation 1575.80 1583.40 10
1994-08-11 Remedial Casing Cementing 160.00 160.50 0
1994-08-11 Cement Plug 115.00 165.00 0
1949-01-13 Acid Treatment 1575.80 1583.40 0
1949-01-15 Bullet Perforation 1587.70 1588.30 13
1949-01-16 Cement Plug 1575.80 1588.30 0
1949-01-20 Bullet Perforation 1575.80 1583.40 10
1949-01-22 Acid Treatment 1575.80 1583.40 0
1994-07-14 Packing Device Capped w/Cement 1560.00 1568.00 0
1994-07-14 Packing Device Capped w/Cement 1312.00 1320.00 0
1994-07-14 Perforation 160.00 160.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8645 0.0 0.0 0.0
1968 8703 0.0 0.0 0.0
1969 8711 0.0 0.0 0.0
1970 8675 0.0 0.0 0.0
1971 8759 0.0 0.0 0.0
1972 7968 0.0 0.0 0.0
1973 8307 0.0 0.0 0.0
1974 8303 0.0 0.0 0.0
1975 5124 0.0 0.0 0.0
1976 7070 0.0 0.0 0.0
1977 7346 0.0 0.0 0.0
1978 7512 0.0 0.0 0.0
1979 7780 0.0 0.0 0.0
1980 6288 0.0 0.0 0.0
1981 684 0.0 0.0 0.0

For data sources see[5]

References