X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504271605000

Well Details

Well ID: 0504271605000
Loading map...
Location: 00/05-16-050-27W4/0
Location Alias: 00/05-16-50-27 W4M
Location Alias 2: 00/05-16-050-27 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 27
Section: 16
County/Municipality: Leduc County
Well Name: VERMILION LEDUC-WB 5-16-50-27
Operator Name: Vermilion Energy Inc.
License Number: 0216932
License Date: 1998-08-11
License Status: Suspension
Spud Date: 1998-09-08
Final Drill Date: 1998-09-14
Well Total Depth: 1722.00 m
Surface Hole Latitude: 53.313366
Surface Hole Longitude: -113.901786

For data sources see[1][2]

Well History

Date Event
1998-08-11 Obtained License
1998-09-09 Surface Casing Operation Performed
1998-09-14 Finished Drilling
1998-09-15 Well Log Performed
1998-09-16 Production Casing Operation Performed
1998-09-16 Rig Released
1998-09-16 Well Mode changed to Drilled and Cased
1998-09-29 Perforation Treatment Performed - Jet Perforation
1998-09-29 Well Log Performed
1998-09-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-10-01 Perforation Treatment Performed - Jet Perforation
1998-10-01 Well Log Performed
1998-10-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-10-06 Perforation Treatment Performed - Jet Perforation
1998-10-06 Well Log Performed
2004-10-29 Perforation Treatment Performed - Bridge Plug No Cement Required
2004-10-30 Perforation Treatment Performed - Jet Perforation
2004-11-01 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-09-29 Perforation 1645.00 1648.00 14
2004-10-30 Perforation 223.50 224.50 13
2004-10-30 Perforation 225.00 226.00 13
2004-10-30 Perforation 227.00 228.50 13
2004-10-30 Perforation 237.00 238.00 13
2004-10-30 Perforation 251.50 252.50 13
2004-10-30 Perforation 280.50 282.00 13
2004-10-30 Perforation 286.00 287.00 13
2004-10-30 Perforation 288.00 289.50 13
2004-10-30 Perforation 302.00 303.50 13
2004-10-30 Perforation 338.50 341.00 13
1998-09-30 Acid Treatment 1645.00 1648.00 0
2004-10-30 Perforation 342.00 343.00 13
2004-10-30 Perforation 344.00 344.80 13
2004-10-30 Perforation 346.50 348.00 13
2004-10-30 Perforation 349.50 351.00 13
2004-10-30 Perforation 352.00 353.00 13
2004-11-01 Fracture 221.50 353.00 0
1998-10-01 Perforation 1631.00 1634.00 14
1998-10-02 Acid Treatment 1631.00 1634.00 0
1998-10-04 Acid Treatment 1631.00 1634.00 0
1998-10-06 Perforation 1483.00 1485.00 14
1998-10-06 Acid Treatment 1483.00 1485.00 0
2004-10-29 Bridge Plug, No Cement 1455.00 1455.50 0
2004-10-30 Perforation 221.50 222.50 13

For data sources see[4]



References