X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505042615002

Well Details

Well ID: 0505042615002
Loading map...
Location: 00/15-26-050-04W5/2
Location Alias: 00/15-26-50-04 W5M
Location Alias 2: 00/15-26-050-04 W5/02
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 04
Section: 26
County/Municipality: Parkland County
Well Name: VH1 102 HIGHVALE 15-26-50-4
Operator Name: Harvest Operations Corp.
License Number: 0208319
License Date: 1997-11-12
License Status: Abandoned
Spud Date: 1999-05-27
Final Drill Date: 1999-05-31
Well Total Depth: 1613.50 m
Surface Hole Latitude: 53.349975
Surface Hole Longitude: -114.476569

For data sources see[1][2]

Well History

Date Event
1997-11-12 Obtained License
1999-03-06 Well Log Performed
1999-05-28 Direction Drilling Operation Performed - Horizontal
1999-05-30 Well Log Performed
1999-05-31 Finished Drilling
1999-05-31 Perforation Treatment Performed - Open-Hole Completion
1999-06-01 Rig Released
1999-06-01 Well Log Performed
1999-06-01 Well Mode changed to Drilled and Cased
1999-07-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-11-01 Perforation Treatment Performed - Jet Perforation
1999-12-11 Perforation Treatment Performed - Chemical Squeeze
2001-09-13 Well Began Production
2001-09-13 Well Fluid changed to Gas
2001-09-13 Well Mode changed to Flowing
2013-12-09 Well Fluid changed to Gas
2013-12-09 Well Mode changed to Suspended
2015-02-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-02-02 Plug Back Performed
2015-02-02 Well Fluid changed to Gas
2015-02-02 Well Log Performed
2015-02-02 Well Mode changed to Abandoned Zone
2015-02-03 Well Log Performed
2015-02-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-02-04 Perforation Treatment Performed - Jet Perforation
2015-02-04 Well Log Performed
2015-02-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-02-05 Perforation Treatment Performed - Jet Perforation
2015-02-05 Well Log Performed
2015-02-06 Perforation Treatment Performed - Cement Plug
2015-02-06 Perforation Treatment Performed - Jet Perforation
2015-02-06 Perforation Treatment Performed - Remedial Casing
2015-02-06 Well Log Performed
2015-02-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-02-09 Perforation Treatment Performed - Jet Perforation
2015-02-09 Well Log Performed
2015-02-10 Perforation Treatment Performed - Cement Plug
2015-02-10 Perforation Treatment Performed - Remedial Casing
2015-03-27 Well Abandoned
2015-03-27 Well Fluid changed to Gas
2015-03-27 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1999-05-28 1525.30 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-05-31 Open Hole/Barefoot Completion 1525.30 1613.50 0
2015-02-05 Perforation 878.00 879.00 17
2015-02-05 Packing Device Capped w/Cement 867.00 875.00 0
2015-02-05 Perforation 720.00 722.00 17
2015-02-05 Packing Device Capped w/Cement 709.00 717.00 0
2015-02-06 Perforation 525.00 527.00 17
2015-02-06 Remedial Casing Cementing 525.00 527.00 0
2015-02-06 Cement Plug 481.50 543.00 0
2015-02-09 Perforation 396.00 397.00 13
2015-02-09 Packing Device Capped w/Cement 385.00 393.00 0
2015-02-09 Perforation 288.00 290.00 13
1999-07-21 Acid Treatment 1525.00 1613.00 0
2015-02-10 Remedial Casing Cementing 288.00 290.00 0
2015-02-10 Cement Plug 284.00 291.00 0
2015-02-10 Cement Plug 275.60 283.60 0
1999-11-01 Perforation 1590.00 1600.00 13
1999-12-11 Chemical Squeeze 1590.00 1600.00 0
2015-02-02 Packing Device Capped w/Cement 1504.00 1514.00 0
2015-02-04 Perforation 1123.00 1124.00 17
2015-02-04 Packing Device Capped w/Cement 1113.00 1121.00 0
2015-02-04 Perforation 1040.00 1041.00 17
2015-02-04 Packing Device Capped w/Cement 1030.00 1038.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 2394 0.0 0.0 0.0
2002 7594 0.0 0.0 0.0
2003 7909 0.0 0.0 0.0
2004 8364 0.0 0.0 0.0
2005 8034 0.0 0.0 0.0
2006 7926 0.0 0.0 0.0
2007 5300 0.0 0.0 0.0
2008 6279 0.0 0.0 0.0
2009 5525 0.0 0.0 0.0
2010 7254 0.0 0.0 0.0
2011 6667 0.0 0.0 0.0
2012 6768 0.0 0.0 0.0
2013 1688 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-02-10 No Incident Encountered 0.00 0.00

For data sources see[7]

References