X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505042711000

Well Details

Well ID: 0505042711000
Loading map...
Location: 00/11-27-050-04W5/0
Location Alias: 00/11-27-50-04 W5M
Location Alias 2: 00/11-27-050-04 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 04
Section: 27
County/Municipality: Parkland County
Well Name: NEW STAR HZ HIGHVALE 11-27-50-4
Operator Name: New Star Energy Ltd.
License Number: 0450201
License Date: 2012-11-16
License Status: Issued
Spud Date: 2012-11-23
Final Drill Date: 2012-12-06
Well Total Depth: 2643.00 m
Surface Hole Latitude: 53.345553
Surface Hole Longitude: -114.520707

For data sources see[1][2]

Well History

Date Event
2012-11-16 Obtained License
2012-11-25 Surface Casing Operation Performed
2012-11-28 Direction Drilling Operation Performed - Deviate
2012-11-29 Direction Drilling Operation Performed - Horizontal
2012-11-30 Intermediate Casing Operation Performed
2012-12-06 Finished Drilling
2012-12-06 Well Mode changed to Drilled and Cased
2012-12-08 Rig Released
2012-12-12 Well Log Performed
2012-12-18 Perforation Treatment Performed - Multi-Stage Fracture
2012-12-18 Well Began Production
2012-12-18 Well Fluid changed to Crude Oil
2012-12-18 Well Mode changed to Flowing
2012-12-19 Perforation Treatment Performed - Multi-Stage Fracture
2013-01-13 Perforation Treatment Performed - Open-Hole Completion
2013-02-07 Well Fluid changed to Crude Oil
2013-02-07 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-11-23 Beaver Drilling Ltd. 12 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-11-28 1283.00 Deviate (5 - 79 degrees)
2012-11-29 1755.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-12-18 Multi-Stage Fracture 2623.90 2634.30 0
2012-12-18 Multi-Stage Fracture 2500.00 2510.40 0
2012-12-18 Multi-Stage Fracture 2484.00 2494.40 0
2012-12-18 Multi-Stage Fracture 2471.50 2481.90 0
2012-12-18 Multi-Stage Fracture 2455.40 2465.80 0
2012-12-18 Multi-Stage Fracture 2442.90 2453.30 0
2012-12-18 Multi-Stage Fracture 2426.80 2437.20 0
2012-12-18 Multi-Stage Fracture 2409.80 2420.20 0
2012-12-18 Multi-Stage Fracture 2395.40 2405.80 0
2012-12-18 Multi-Stage Fracture 2379.40 2389.80 0
2012-12-19 Multi-Stage Fracture 2366.90 2377.30 0
2012-12-18 Multi-Stage Fracture 2619.40 2629.80 0
2012-12-19 Multi-Stage Fracture 2350.90 2361.30 0
2012-12-19 Multi-Stage Fracture 2328.90 2339.30 0
2012-12-19 Multi-Stage Fracture 2319.30 2329.70 0
2012-12-19 Multi-Stage Fracture 2300.30 2310.70 0
2012-12-19 Multi-Stage Fracture 2290.80 2301.20 0
2012-12-19 Multi-Stage Fracture 2274.70 2285.10 0
2012-12-19 Multi-Stage Fracture 2262.20 2272.60 0
2012-12-19 Multi-Stage Fracture 2243.20 2253.60 0
2012-12-19 Multi-Stage Fracture 2225.00 2235.40 0
2012-12-19 Multi-Stage Fracture 2215.50 2225.90 0
2012-12-18 Multi-Stage Fracture 2604.80 2615.30 0
2012-12-19 Multi-Stage Fracture 2199.50 2209.90 0
2012-12-19 Multi-Stage Fracture 2187.40 2197.40 0
2012-12-19 Multi-Stage Fracture 2167.90 2178.30 0
2012-12-19 Multi-Stage Fracture 2153.90 2164.30 0
2012-12-19 Multi-Stage Fracture 2139.40 2140.80 0
2012-12-19 Multi-Stage Fracture 2124.90 2135.30 0
2012-12-19 Multi-Stage Fracture 2110.40 2120.80 0
2012-12-19 Multi-Stage Fracture 2094.10 2104.50 0
2012-12-19 Multi-Stage Fracture 2081.40 2091.80 0
2012-12-19 Multi-Stage Fracture 2065.00 2075.40 0
2012-12-18 Multi-Stage Fracture 2598.90 2609.30 0
2012-12-19 Multi-Stage Fracture 2052.30 2062.70 0
2012-12-19 Multi-Stage Fracture 2035.90 2046.30 0
2012-12-19 Multi-Stage Fracture 2018.70 2029.10 0
2012-12-19 Multi-Stage Fracture 2004.00 2014.40 0
2012-12-19 Multi-Stage Fracture 1989.60 2000.10 0
2012-12-19 Multi-Stage Fracture 1974.80 1985.20 0
2013-01-13 Open Hole/Barefoot Completion 1787.10 2643.00 0
2012-12-18 Multi-Stage Fracture 2576.30 2586.70 0
2012-12-18 Multi-Stage Fracture 2560.20 2570.60 0
2012-12-18 Multi-Stage Fracture 2547.80 2558.20 0
2012-12-18 Multi-Stage Fracture 2528.70 2539.10 0
2012-12-18 Multi-Stage Fracture 2514.50 2525.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 64 0.0 0.0 0.0
2013 7866 0.0 0.0 0.0
2014 8575 0.0 0.0 0.0
2015 7773 0.0 0.0 0.0
2016 875 0.0 0.0 0.0
2017 8438 0.0 0.0 0.0
2018 7929 0.0 0.0 0.0
2019 8475 0.0 0.0 0.0
2020 2039 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-12-08 No Incident Encountered 0.00 0.00
2013-01-12 No Incident Encountered 0.00 0.00

For data sources see[8]

References