X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505043512002

Well Details

Well ID: 0505043512002
Loading map...
Location: 00/12-35-050-04W5/2
Location Alias: 00/12-35-50-04 W5M
Location Alias 2: 00/12-35-050-04 W5/02
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 04
Section: 35
County/Municipality: Parkland County
Well Name: ANDEX ET AL HIGHVALE 12-35-50-4
Operator Name: New Star Energy Ltd.
License Number: 0106537
License Date: 1984-03-14
License Status: Issued
Spud Date: 1984-03-16
Final Drill Date: 1984-03-23
Well Total Depth: 1605.00 m
Surface Hole Latitude: 53.359893
Surface Hole Longitude: -114.483682

For data sources see[1][2]

Well History

Date Event
1984-03-14 Obtained License
1984-03-23 Finished Drilling
1984-03-23 Well Log Performed
1984-03-23 Well Mode changed to Drilled and Cased
1984-03-24 Drill Stem Test Performed
1984-03-24 Well Log Performed
1984-03-25 Drill Stem Test Performed
1984-03-26 Production Casing Operation Performed
1984-04-12 Well Log Performed
1984-04-16 Well Log Performed
1984-04-17 Perforation Treatment Performed - Jet Perforation
1984-04-26 Perforation Treatment Performed - Fractured
1984-04-28 Well Log Performed
1995-07-14 Well Log Performed
1995-07-15 Perforation Treatment Performed - Cement Squeeze
1995-07-15 Plug Back Performed
1995-07-18 Well Log Performed
1995-07-19 Perforation Treatment Performed - Jet Perforation
1995-07-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-11-06 Well Began Production
1995-11-06 Well Fluid changed to Gas
1995-11-06 Well Mode changed to Flowing
1995-11-07 Well Fluid changed to Gas
1995-11-07 Well Mode changed to Flowing
2006-03-15 Well Fluid changed to Gas
2006-03-15 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-04-17 Perforation 1087.00 1095.00 13
1984-04-26 Fracture 1087.00 1095.00 0
1995-07-15 Cement Squeeze 1087.00 1095.00 0
1995-07-19 Perforation 1536.50 1540.20 13
1995-07-23 Acid Treatment 1536.50 1540.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 1213 0.0 0.0 0.0
1996 8357 0.0 0.0 0.0
1997 8578 0.0 0.0 0.0
1998 8628 0.0 0.0 0.0
1999 8213 0.0 0.0 0.0
2000 8732 0.0 0.0 0.0
2001 8601 0.0 0.0 0.0
2002 8300 0.0 0.0 0.0
2003 8588 0.0 0.0 0.0
2004 8582 0.0 0.0 0.0
2005 8368 0.0 0.0 0.0
2006 8717 0.0 0.0 0.0
2007 7270 0.0 0.0 0.0
2008 8273 0.0 0.0 0.0
2009 8582 0.0 0.0 0.0
2010 8040 0.0 0.0 0.0
2011 8167 0.0 0.0 0.0
2012 6368 0.0 0.0 0.0
2013 4353 0.0 0.0 0.0
2014 7808 0.0 0.0 0.0
2015 8534 0.0 0.0 0.0
2016 8735 0.0 0.0 0.0
2017 8494 0.0 0.0 0.0
2018 8546 0.0 0.0 0.0
2019 8421 0.0 0.0 0.0
2020 2057 0.0 0.0 0.0

For data sources see[5]

References