X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505043614000

Well Details

Well ID: 0505043614000
Loading map...
Location: 00/14-36-050-04W5/0
Location Alias: 00/14-36-50-04 W5M
Location Alias 2: 00/14-36-050-04 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 04
Section: 36
County/Municipality: Parkland County
Well Name: ANDEX ET AL HIGHVALE 14-36-50-4
Operator Name: New Star Energy Ltd.
License Number: 0101433
License Date: 1983-05-26
License Status: Issued
Spud Date: 1983-05-27
Final Drill Date: 1983-06-03
Well Total Depth: 1575.00 m
Surface Hole Latitude: 53.366454
Surface Hole Longitude: -114.457453

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-05-26 Obtained License
1983-06-01 Kick Occurred
1983-06-02 Lost Circulation Occurred
1983-06-03 Finished Drilling
1983-06-06 Production Casing Operation Performed
1983-06-13 Perforation Treatment Performed - Jet Perforation
1983-06-22 Well Mode changed to Drilled and Cased
1983-07-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-07-22 Perforation Treatment Performed - Jet Perforation
1984-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-02-08 Perforation Treatment Performed - Cement Squeeze
1984-02-10 Perforation Treatment Performed - Jet Perforation
1984-04-01 Well Mode changed to Drilled and Cased
1984-04-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-11-01 Well Began Production
1984-11-01 Well Fluid changed to Gas
1984-11-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-06-13 Perforation 1522.00 1525.00 13
1983-07-21 Packing Device Capped w/Cement 1520.00 1520.00 0
1983-07-22 Perforation 1509.50 1512.00 13
1984-02-08 Acid Treatment 1509.50 1512.00 0
1984-02-08 Cement Squeeze 1509.50 1512.00 0
1984-02-10 Perforation 1522.00 1525.00 13
1984-04-10 Acid Treatment 1522.00 1525.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 48 0.0 0.0 0.0
1984 970 0.0 0.0 0.0
1985 1270 0.0 0.0 0.0
1986 3792 0.0 0.0 0.0
1987 3711 0.0 0.0 0.0
1988 4753 0.0 0.0 0.0
1989 8464 0.0 0.0 0.0
1990 7566 0.0 0.0 0.0
1991 7453 0.0 0.0 0.0
1992 6835 0.0 0.0 0.0
1993 8583 0.0 0.0 0.0
1994 8717 0.0 0.0 0.0
1995 8559 0.0 0.0 0.0
1996 8568 0.0 0.0 0.0
1997 8593 0.0 0.0 0.0
1998 8040 0.0 0.0 0.0
1999 7410 0.0 0.0 0.0
2000 8374 0.0 0.0 0.0
2001 8291 0.0 0.0 0.0
2002 8249 0.0 0.0 0.0
2003 8327 0.0 0.0 0.0
2004 8387 0.0 0.0 0.0
2005 8310 0.0 0.0 0.0
2006 8723 0.0 0.0 0.0
2007 8519 0.0 0.0 0.0
2008 8349 0.0 0.0 0.0
2009 8705 0.0 0.0 0.0
2010 8360 0.0 0.0 0.0
2011 8551 0.0 0.0 0.0
2012 7459 0.0 0.0 0.0
2013 6437 0.0 0.0 0.0
2014 8325 0.0 0.0 0.0
2015 8283 0.0 0.0 0.0
2016 8651 0.0 0.0 0.0
2017 8282 0.0 0.0 0.0
2018 7503 0.0 0.0 0.0
2019 6968 0.0 0.0 0.0
2020 1826 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1983-06-01 Kick 1518.50 1518.50
1983-06-02 Lost Circulation 1524.00 1575.00
1983-06-01 Kick 1524.00 1524.00

For data sources see[6]

References