X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505101008000

Well Details

Well ID: 0505101008000
Loading map...
Location: 00/08-10-050-10W5/0
Location Alias: 00/08-10-50-10 W5M
Location Alias 2: 00/08-10-050-10 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 10
Section: 10
County/Municipality: Brazeau County
Well Name: ESSO PEMBINA 8-10-50-10
Operator Name: Imperial Oil Resources Limited
License Number: 0021444
License Date: 1961-09-29
License Status: RecCertified
Spud Date: 1961-10-26
Final Drill Date: 1961-11-03
Well Total Depth: 1679.40 m
Surface Hole Latitude: 53.299735
Surface Hole Longitude: -115.369937

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-09-29 Obtained License
1961-11-03 Finished Drilling
1961-11-03 Well Mode changed to Drilled and Cased
1961-11-04 Production Casing Operation Performed
1961-11-07 Perforation Treatment Performed - Jet Perforation
1961-11-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-11-08 Perforation Treatment Performed - Fractured
1961-12-01 Well Began Production
1961-12-01 Well Fluid changed to Crude Oil
1961-12-01 Well Mode changed to Pumping
1971-02-06 Perforation Treatment Performed - Jet Perforation
1971-02-09 Perforation Treatment Performed - Fractured
1972-02-14 Well Fluid changed to Crude Oil
1972-02-14 Well Mode changed to Suspended
1996-11-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-11-19 Perforation Treatment Performed - Jet Perforation
1996-11-19 Perforation Treatment Performed - Remedial Casing
1996-11-19 Plug Back Performed
1996-11-19 Well Fluid changed to Crude Oil
1996-11-19 Well Mode changed to Abandoned Zone
1997-10-06 Well Abandoned
1997-10-06 Well Fluid changed to Crude Oil
1997-10-06 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-11-07 Perforation 1656.60 1656.90 7
1996-11-19 Packing Device Capped w/Cement 135.90 450.00 0
1961-11-07 Perforation 1658.10 1659.00 7
1961-11-08 Acid Treatment 1656.60 1659.00 0
1961-11-08 Fracture 1656.60 1659.00 0
1971-02-06 Perforation 1665.40 1668.50 3
1971-02-09 Fracture 1656.30 1668.50 0
1996-11-19 Packing Device Capped w/Cement 1634.00 1642.00 0
1996-11-19 Perforation 445.40 446.40 13
1996-11-19 Remedial Casing Cementing 445.40 446.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 6194 0.0 0.0 0.0
1968 439 0.0 0.0 0.0
1969 576 0.0 0.0 0.0
1971 7117 0.0 0.0 0.0
1972 1032 0.0 0.0 0.0

For data sources see[5]

References