If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0505112905020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.348261,"lon":-115.5641,"icon":""}]} |
Location: 02/05-29-050-11W5/0 | |
Location Alias: 02/05-29-50-11 W5M | |
Location Alias 2: 02/05-29-050-11 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 5 | |
Range: 11 | |
Section: 29 | |
County/Municipality: Brazeau County | |
Well Name: VEI HZ CYN-PEM 5-29-50-11 | |
Operator Name: Vermilion Energy Inc. | |
License Number: 0446389 | |
License Date: 2012-06-08 | |
License Status: Amended | |
Spud Date: 2012-10-09 | |
Final Drill Date: 2012-10-16 | |
Well Total Depth: 3170.00 m | |
Surface Hole Latitude: 53.348261 | |
Surface Hole Longitude: -115.564100 |
Date | Event |
---|---|
2012-06-08 | Obtained License |
2012-10-11 | Surface Casing Operation Performed |
2012-10-12 | Well Log Performed |
2012-10-13 | Direction Drilling Operation Performed - Deviate |
2012-10-13 | Direction Drilling Operation Performed - Horizontal |
2012-10-16 | Finished Drilling |
2012-10-16 | Well Mode changed to Drilled and Cased |
2012-10-18 | Production Casing Operation Performed |
2012-10-18 | Rig Released |
2012-12-18 | Well Log Performed |
2013-01-01 | Well Began Production |
2013-01-01 | Well Fluid changed to Crude Oil |
2013-01-01 | Well Mode changed to Pumping |
2013-01-11 | Perforation Treatment Performed - Open-Hole Completion |
2013-01-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-01-13 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2012-10-13 | 1408.80 | Deviate (5 - 79 degrees) |
2012-10-13 | 1832.70 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-01-11 | Open Hole/Barefoot Completion | 3167.00 | 3170.00 | 0 |
2013-01-12 | Multi-Stage Fracture | 2324.20 | 2324.30 | 0 |
2013-01-12 | Multi-Stage Fracture | 2226.30 | 2226.40 | 0 |
2013-01-12 | Multi-Stage Fracture | 2115.10 | 2115.20 | 0 |
2013-01-12 | Multi-Stage Fracture | 2003.90 | 2004.00 | 0 |
2013-01-13 | Multi-Stage Fracture | 1919.00 | 1919.10 | 0 |
2013-01-13 | Multi-Stage Fracture | 1856.20 | 1856.30 | 0 |
2013-01-12 | Multi-Stage Fracture | 3109.00 | 3109.10 | 0 |
2013-01-12 | Multi-Stage Fracture | 3010.40 | 3010.50 | 0 |
2013-01-12 | Multi-Stage Fracture | 2912.60 | 2912.70 | 0 |
2013-01-12 | Multi-Stage Fracture | 2814.60 | 2814.70 | 0 |
2013-01-12 | Multi-Stage Fracture | 2716.40 | 2716.50 | 0 |
2013-01-12 | Multi-Stage Fracture | 2618.30 | 2618.40 | 0 |
2013-01-12 | Multi-Stage Fracture | 2520.20 | 2520.30 | 0 |
2013-01-12 | Multi-Stage Fracture | 2422.20 | 2422.30 | 0 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-01-12 | 2013-01-13 | 1,716 | 2,881 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | nitrogen | 7727-37-9 | 100 | 3.4111 | N/A | |||
Water | Not Available | 100 | 86.6946 | N/A | ||||
Frac Sand - regular | Trican | silica crystalline | 14808-60-7 | 100 | 4.7848 | N/A | ||
Busan 94 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0101 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.0101 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0101 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0101 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0101 | N/A | ||||
GBO-1 | Trican | Breaker | sodium perborate tetrahydrate | 10486-00-7 | 100 | 0.0265 | N/A | |
CC-7 | Trican | Clay Control | 1.6-hexanediamine. dihydrochloride | 6055-52-3 | 100 | 0.1436 | N/A | |
water | 7732-18-5 | 100 | 0.1436 | N/A | ||||
GNE-1 | Trican | Demulsifier | non-hazardous ingredients | Not Available | 100 | 0.073 | N/A | |
propylene glycol | 57-55-6 | 100 | 0.073 | N/A | ||||
FR-8 | Trican | Friction Reducer | ammonium chloride | 12125-02-9 | 100 | 0.071 | N/A | |
distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.071 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.071 | N/A |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 6956 | 0.0 | 0.0 | 0.0 |
2014 | 8468 | 0.0 | 0.0 | 0.0 |
2015 | 8490 | 0.0 | 0.0 | 0.0 |
2016 | 8587 | 0.0 | 0.0 | 0.0 |
2017 | 7546 | 0.0 | 0.0 | 0.0 |
2018 | 8721 | 0.0 | 0.0 | 0.0 |
2019 | 8679 | 0.0 | 0.0 | 0.0 |
2020 | 1798 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-10-18 | No Incident Encountered | 0.00 | 0.00 |
2013-01-14 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]