If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0505113410000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.361528,"lon":-115.522391,"icon":""}]} |
Location: 00/10-34-050-11W5/0 | |
Location Alias: 00/10-34-50-11 W5M | |
Location Alias 2: 00/10-34-050-11 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 5 | |
Range: 11 | |
Section: 34 | |
County/Municipality: Brazeau County | |
Well Name: ESSO PEMBINA 10-34-50-11 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: 0027310 | |
License Date: 1964-12-09 | |
License Status: RecCertified | |
Spud Date: 1964-12-18 | |
Final Drill Date: 1964-12-28 | |
Well Total Depth: 1725.20 m | |
Surface Hole Latitude: 53.361528 | |
Surface Hole Longitude: -115.522391 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1964-12-09 | Obtained License |
1964-12-28 | Finished Drilling |
1964-12-28 | Well Mode changed to Drilled and Cased |
1964-12-29 | Production Casing Operation Performed |
1965-01-06 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1965-01-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1965-01-07 | Perforation Treatment Performed - Fractured |
1965-01-30 | Perforation Treatment Performed - Fractured |
1966-01-19 | Well Began Production |
1966-01-19 | Well Fluid changed to Crude Oil |
1966-01-19 | Well Mode changed to Pumping |
1967-02-11 | Perforation Treatment Performed - Cement Plug |
1967-02-11 | Well Abandoned |
1967-02-11 | Well Fluid changed to Crude Oil |
1967-02-11 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1965-01-06 | Hydra Jet Perforation | 1709.90 | 1709.90 | 0 |
1965-01-07 | Acid Treatment | 1709.90 | 1709.90 | 0 |
1965-01-07 | Fracture | 1709.90 | 1709.90 | 0 |
1965-01-30 | Fracture | 1709.90 | 1709.90 | 0 |
1967-02-11 | Cement Plug | 1676.40 | 1713.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1966 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]