If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0505120204000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.28516,"lon":-115.632561,"icon":""}]} |
Location: 00/04-02-050-12W5/0 | |
Location Alias: 00/04-02-50-12 W5M | |
Location Alias 2: 00/04-02-050-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 5 | |
Range: 12 | |
Section: 02 | |
County/Municipality: Yellowhead County | |
Well Name: VERMILION HZ PEMBINA 4-2-50-12 | |
Operator Name: Vermilion Energy Inc. | |
License Number: 0443156 | |
License Date: 2012-01-20 | |
License Status: Issued | |
Spud Date: 2012-02-02 | |
Final Drill Date: 2012-02-10 | |
Well Total Depth: 3510.00 m | |
Surface Hole Latitude: 53.285160 | |
Surface Hole Longitude: -115.632561 |
Date | Event |
---|---|
2012-01-20 | Obtained License |
2012-02-03 | Surface Casing Operation Performed |
2012-02-03 | Well Log Performed |
2012-02-04 | Direction Drilling Operation Performed - Horizontal |
2012-02-10 | Finished Drilling |
2012-02-10 | Well Mode changed to Drilled and Cased |
2012-02-12 | Production Casing Operation Performed |
2012-02-13 | Rig Released |
2012-02-13 | Well Log Performed |
2012-03-24 | Kick Occurred |
2012-03-26 | Kick Occurred |
2012-04-01 | Kick Occurred |
2012-04-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-04-04 | Perforation Treatment Performed - Jet Perforation |
2012-04-04 | Well Log Performed |
2012-04-06 | Perforation Treatment Performed - Cement Squeeze |
2012-04-08 | Well Log Performed |
2012-04-15 | Perforation Treatment Performed - Open-Hole Completion |
2012-04-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-04-17 | Perforation Treatment Performed - Jet Perforation |
2012-05-01 | Well Began Production |
2012-05-01 | Well Fluid changed to Crude Oil |
2012-05-01 | Well Mode changed to Flowing |
2012-05-03 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-02-02 | Ironhand Drilling Inc. | 5 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-02-04 | 1178.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-04-04 | Packing Device Capped w/Cement | 1574.00 | 1583.00 | 0 |
2012-04-16 | Multi-Stage Fracture | 2983.50 | 2983.60 | 0 |
2012-04-16 | Multi-Stage Fracture | 2880.80 | 2880.90 | 0 |
2012-04-16 | Multi-Stage Fracture | 2777.90 | 2778.00 | 0 |
2012-04-16 | Multi-Stage Fracture | 2674.70 | 2674.80 | 0 |
2012-04-16 | Multi-Stage Fracture | 2573.20 | 2573.30 | 0 |
2012-04-16 | Multi-Stage Fracture | 2456.60 | 2456.70 | 0 |
2012-04-17 | Perforation | 2180.00 | 2181.00 | 7 |
2012-04-17 | Perforation | 2245.00 | 2246.00 | 6 |
2012-04-17 | Perforation | 2320.00 | 2321.00 | 5 |
2012-05-03 | Multi-Stage Fracture | 2320.00 | 2320.10 | 0 |
2012-04-04 | Perforation | 1481.00 | 1482.00 | 14 |
2012-05-03 | Multi-Stage Fracture | 2245.00 | 2245.10 | 0 |
2012-05-03 | Multi-Stage Fracture | 2180.00 | 2180.10 | 0 |
2012-04-06 | Cement Squeeze | 1481.00 | 1482.00 | 0 |
2012-04-15 | Open Hole/Barefoot Completion | 3508.00 | 3510.00 | 0 |
2012-04-16 | Multi-Stage Fracture | 3496.40 | 3496.50 | 0 |
2012-04-16 | Multi-Stage Fracture | 3401.10 | 3401.20 | 0 |
2012-04-16 | Multi-Stage Fracture | 3300.40 | 3300.50 | 0 |
2012-04-16 | Multi-Stage Fracture | 3200.20 | 3200.30 | 0 |
2012-04-16 | Multi-Stage Fracture | 3097.70 | 3097.80 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 4932 | 0.0 | 0.0 | 0.0 |
2013 | 8712 | 0.0 | 0.0 | 0.0 |
2014 | 8525 | 0.0 | 0.0 | 0.0 |
2015 | 8337 | 0.0 | 0.0 | 0.0 |
2016 | 8623 | 0.0 | 0.0 | 0.0 |
2017 | 8538 | 0.0 | 0.0 | 0.0 |
2018 | 8637 | 0.0 | 0.0 | 0.0 |
2019 | 8736 | 0.0 | 0.0 | 0.0 |
2020 | 2087 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-03-24 | Kick | 800.00 | 800.00 |
2012-03-26 | Kick | 2122.00 | 2122.00 |
2012-04-01 | Kick | 2158.60 | 2158.60 |
2012-05-05 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]