If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0505120310000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.285029,"lon":-115.632507,"icon":""}]} |
Location: 00/10-03-050-12W5/0 | |
Location Alias: 00/10-03-50-12 W5M | |
Location Alias 2: 00/10-03-050-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 5 | |
Range: 12 | |
Section: 03 | |
County/Municipality: Yellowhead County | |
Well Name: VERMILION HZ PEMBINA 10-3-50-12 | |
Operator Name: Vermilion Energy Inc. | |
License Number: 0443157 | |
License Date: 2012-01-20 | |
License Status: Issued | |
Spud Date: 2012-02-14 | |
Final Drill Date: 2012-03-02 | |
Well Total Depth: 4393.00 m | |
Surface Hole Latitude: 53.285029 | |
Surface Hole Longitude: -115.632507 |
Date | Event |
---|---|
2012-01-20 | Obtained License |
2012-02-16 | Surface Casing Operation Performed |
2012-02-17 | Direction Drilling Operation Performed - Horizontal |
2012-02-17 | Well Log Performed |
2012-03-02 | Finished Drilling |
2012-03-02 | Well Mode changed to Drilled and Cased |
2012-03-03 | Well Began Production |
2012-03-03 | Well Fluid changed to Crude Oil |
2012-03-03 | Well Mode changed to Pumping |
2012-03-05 | Production Casing Operation Performed |
2012-03-07 | Rig Released |
2012-03-16 | Well Log Performed |
2012-03-20 | Perforation Treatment Performed - Open-Hole Completion |
2012-03-21 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-02-14 | Ironhand Drilling Inc. | 5 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-02-17 | 1023.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-03-20 | Open Hole/Barefoot Completion | 4389.00 | 4393.00 | 0 |
2012-03-21 | Multi-Stage Fracture | 3495.30 | 3495.40 | 0 |
2012-03-21 | Multi-Stage Fracture | 3393.90 | 3394.00 | 0 |
2012-03-21 | Multi-Stage Fracture | 3277.80 | 3277.90 | 0 |
2012-03-21 | Multi-Stage Fracture | 3174.90 | 3175.00 | 0 |
2012-03-21 | Multi-Stage Fracture | 3059.90 | 3060.00 | 0 |
2012-03-21 | Multi-Stage Fracture | 2957.80 | 2957.90 | 0 |
2012-03-21 | Multi-Stage Fracture | 2841.30 | 2841.40 | 0 |
2012-03-21 | Multi-Stage Fracture | 2738.20 | 2738.30 | 0 |
2012-03-21 | Multi-Stage Fracture | 2621.70 | 2621.80 | 0 |
2012-03-21 | Multi-Stage Fracture | 2504.60 | 2504.70 | 0 |
2012-03-21 | Multi-Stage Fracture | 4363.40 | 4363.50 | 0 |
2012-03-21 | Multi-Stage Fracture | 2401.20 | 2401.30 | 0 |
2012-03-21 | Multi-Stage Fracture | 2284.50 | 2284.60 | 0 |
2012-03-21 | Multi-Stage Fracture | 2181.50 | 2181.60 | 0 |
2012-03-21 | Multi-Stage Fracture | 2102.60 | 2102.70 | 0 |
2012-03-21 | Multi-Stage Fracture | 4269.20 | 4269.30 | 0 |
2012-03-21 | Multi-Stage Fracture | 4167.30 | 4167.40 | 0 |
2012-03-21 | Multi-Stage Fracture | 4056.30 | 4056.40 | 0 |
2012-03-21 | Multi-Stage Fracture | 3940.90 | 3941.00 | 0 |
2012-03-21 | Multi-Stage Fracture | 3826.20 | 3826.30 | 0 |
2012-03-21 | Multi-Stage Fracture | 3714.00 | 3714.10 | 0 |
2012-03-21 | Multi-Stage Fracture | 3611.80 | 3611.90 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 4804 | 0.0 | 0.0 | 0.0 |
2013 | 8737 | 0.0 | 0.0 | 0.0 |
2014 | 8339 | 0.0 | 0.0 | 0.0 |
2015 | 8685 | 0.0 | 0.0 | 0.0 |
2016 | 8498 | 0.0 | 0.0 | 0.0 |
2017 | 8666 | 0.0 | 0.0 | 0.0 |
2018 | 8345 | 0.0 | 0.0 | 0.0 |
2019 | 8670 | 0.0 | 0.0 | 0.0 |
2020 | 2172 | 0.0 | 0.0 | 0.0 |
For data sources see[7]