X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505120714020

Well Details

Well ID: 0505120714020
Loading map...
Location: 02/14-07-050-12W5/0
Location Alias: 02/14-07-50-12 W5M
Location Alias 2: 02/14-07-050-12 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 12
Section: 07
County/Municipality: Yellowhead County
Well Name: VEI HZ PEMBINA 14-7-50-12
Operator Name: Vermilion Energy Inc.
License Number: 0471060
License Date: 2014-11-03
License Status: Issued
Spud Date: 2014-12-05
Final Drill Date: 2014-12-19
Well Total Depth: 4627.00 m
Surface Hole Latitude: 53.284065
Surface Hole Longitude: -115.758150

For data sources see[1][2]

Well History

Date Event
2014-11-03 Obtained License
2014-12-07 Surface Casing Operation Performed
2014-12-09 Direction Drilling Operation Performed - Deviate
2014-12-10 Direction Drilling Operation Performed - Horizontal
2014-12-10 Well Log Performed
2014-12-11 Well Log Performed
2014-12-19 Finished Drilling
2014-12-19 Well Log Performed
2014-12-19 Well Mode changed to Drilled and Cased
2014-12-22 Production Casing Operation Performed
2014-12-23 Rig Released
2015-01-01 Well Began Production
2015-01-01 Well Fluid changed to Crude Oil
2015-01-01 Well Mode changed to Pumping
2015-01-17 Perforation Treatment Performed - Open-Hole Completion
2015-01-18 Perforation Treatment Performed - Multi-Stage Fracture
2015-01-19 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-12-05 Nabors Drilling Limited 30 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-12-09 1443.00 Deviate (5 - 79 degrees)
2014-12-10 2038.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-01-17 Open Hole/Barefoot Completion 4622.50 4627.00 0
2015-01-18 Multi-Stage Fracture 3873.50 3873.60 0
2015-01-18 Multi-Stage Fracture 3782.30 3782.40 0
2015-01-18 Multi-Stage Fracture 3691.70 3691.80 0
2015-01-19 Multi-Stage Fracture 3601.70 3601.80 0
2015-01-19 Multi-Stage Fracture 3512.40 3512.50 0
2015-01-19 Multi-Stage Fracture 3421.40 3421.50 0
2015-01-19 Multi-Stage Fracture 3330.70 3330.80 0
2015-01-19 Multi-Stage Fracture 3239.80 3239.90 0
2015-01-19 Multi-Stage Fracture 3148.80 3148.90 0
2015-01-19 Multi-Stage Fracture 3057.70 3057.80 0
2015-01-18 Multi-Stage Fracture 4582.40 4582.50 0
2015-01-19 Multi-Stage Fracture 2967.50 2967.60 0
2015-01-19 Multi-Stage Fracture 2876.50 2876.60 0
2015-01-19 Multi-Stage Fracture 2772.60 2772.70 0
2015-01-19 Multi-Stage Fracture 2684.80 2684.90 0
2015-01-19 Multi-Stage Fracture 2595.20 2595.30 0
2015-01-19 Multi-Stage Fracture 2504.40 2504.50 0
2015-01-19 Multi-Stage Fracture 2415.00 2415.10 0
2015-01-19 Multi-Stage Fracture 2325.10 2325.20 0
2015-01-19 Multi-Stage Fracture 2225.60 2225.70 0
2015-01-19 Multi-Stage Fracture 2164.50 2164.60 0
2015-01-18 Multi-Stage Fracture 4517.10 4517.20 0
2015-01-18 Multi-Stage Fracture 4427.60 4427.70 0
2015-01-18 Multi-Stage Fracture 4336.30 4336.40 0
2015-01-18 Multi-Stage Fracture 4245.60 4245.70 0
2015-01-18 Multi-Stage Fracture 4155.20 4155.30 0
2015-01-18 Multi-Stage Fracture 4053.20 4053.30 0
2015-01-18 Multi-Stage Fracture 3963.20 3963.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-01-18 2015-01-19 1,871 5,421 N/A
2 2015-01-19 2015-01-19 1,871 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 4.7135 N/A
water Not Available 100 86.6247 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 8.6932 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 0.3992 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0228 N/A
dibromoacetonitrile 3252-43-5 100 0.0228 N/A
non-hazardous ingredients Not Available 100 0.0228 N/A
polyethylene glycol 25322-68-3 100 0.0228 N/A
sodium bromide 7647-15-6 100 0.0228 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.1888 N/A
water Not Available 100 0.1888 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.046 N/A
propylene glycol 57-55-6 100 0.046 N/A
GFR-1 Trican Friction Reducer non-hazardous ingredients Not Available 100 0.1129 N/A
GSI-1 Trican Scale Inhibitor non-hazardous ingredients Not Available 100 0.0501 N/A
SS-7 Trican Surfactant aliphatic alcohol 1111 100 0.0362 N/A
aminofunctional polymer 1111 100 0.0362 N/A
distillates (petroleum). sweet medium 64741-86-2 100 0.0362 N/A
2 Sand 50/140 Trican silica crystalline 14808-60-7 100 0.2027 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-01-17 2015-01-19 Groundwater - Non-saline less than or equal to 150m deep 5600
2015-01-14 2015-01-15 Recycled Fracturing Water (treated at well site) 421

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 7420 0.0 0.0 0.0
2016 8680 0.0 0.0 0.0
2017 8751 0.0 0.0 0.0
2018 8749 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2157 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-12-23 No Incident Encountered 0.00 0.00
2015-01-23 No Incident Encountered 0.00 0.00

For data sources see[10]

References