X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505121604000

Well Details

Well ID: 0505121604000
Loading map...
Location: 00/04-16-050-12W5/0
Location Alias: 00/04-16-50-12 W5M
Location Alias 2: 00/04-16-050-12 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 12
Section: 16
County/Municipality: Yellowhead County
Well Name: VEI HZ PEMBINA 4-16-50-12
Operator Name: Vermilion Energy Inc.
License Number: 0454430
License Date: 2013-01-31
License Status: Amended
Spud Date: 2013-07-17
Final Drill Date: 2013-07-28
Well Total Depth: 3437.00 m
Surface Hole Latitude: 53.310068
Surface Hole Longitude: -115.680849

For data sources see[1][2]

Well History

Date Event
2013-01-31 Obtained License
2013-07-18 Surface Casing Operation Performed
2013-07-20 Direction Drilling Operation Performed - Deviate
2013-07-21 Direction Drilling Operation Performed - Horizontal
2013-07-28 Finished Drilling
2013-07-28 Well Mode changed to Drilled and Cased
2013-07-30 Production Casing Operation Performed
2013-07-31 Rig Released
2013-09-01 Well Log Performed
2013-09-21 Perforation Treatment Performed - Open-Hole Completion
2013-09-22 Perforation Treatment Performed - Multi-Stage Fracture
2013-11-01 Well Began Production
2013-11-01 Well Fluid changed to Crude Oil
2013-11-01 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-07-17 Ensign Drilling Inc. 541 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-07-20 1467.00 Deviate (5 - 79 degrees)
2013-07-21 1922.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-09-21 Open Hole/Barefoot Completion 3420.00 3437.00 0
2013-09-22 Multi-Stage Fracture 2553.10 2553.20 0
2013-09-22 Multi-Stage Fracture 2445.80 2445.90 0
2013-09-22 Multi-Stage Fracture 2326.00 2326.10 0
2013-09-22 Multi-Stage Fracture 2219.50 2219.60 0
2013-09-22 Multi-Stage Fracture 2095.70 2095.80 0
2013-09-22 Multi-Stage Fracture 2013.00 2013.10 0
2013-09-22 Multi-Stage Fracture 3404.90 3405.00 0
2013-09-22 Multi-Stage Fracture 3334.60 3334.70 0
2013-09-22 Multi-Stage Fracture 3227.00 3227.10 0
2013-09-22 Multi-Stage Fracture 3116.30 3116.40 0
2013-09-22 Multi-Stage Fracture 3005.10 3005.20 0
2013-09-22 Multi-Stage Fracture 2890.30 2890.40 0
2013-09-22 Multi-Stage Fracture 2768.90 2769.00 0
2013-09-22 Multi-Stage Fracture 2661.70 2661.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-09-22 2013-09-22 1,807 1,344 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 4.4543 N/A
water 7732-18-5 100 77.5898 N/A
Sand (20/40) Trican silica crystalline 14808-60-7 100 16.3618 N/A
Sand (40/70) Trican silica crystalline 14808-60-7 100 0.4575 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0096 N/A
dibromoacetonitrile 3252-43-5 100 0.0096 N/A
non-hazardous ingredients Not Available 100 0.0096 N/A
polyethylene glycol 25322-68-3 100 0.0096 N/A
sodium bromide 7647-15-6 100 0.0096 N/A
EnCap-LP Trican Breaker ammonium persulfate 7727-54-0 100 0.023 N/A
cured acrylic resin Not Available 100 0.023 N/A
silica crystalline 14808-60-7 100 0.023 N/A
GBE 1:5 Trican Breaker non-hazardous ingredients Not Available 100 0.0233 N/A
propylene glycol 57-55-6 100 0.0233 N/A
DRA-2 Trican Buffer non-hazardous ingredients Not Available 100 0.0872 N/A
CC-55 Trican Clay Control 1.3-propanediaminium-2-substitued. -hexaalkyl-. di halide 7744 100 0.1699 N/A
formic acid 64-18-6 100 0.1699 N/A
non-hazardous ingredients Not Available 100 0.1699 N/A
WXB-10 Trican Crosslinker borate salts 1319-33-1 100 0.2418 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.2418 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0853 N/A
propylene glycol 57-55-6 100 0.0853 N/A
WG-111L Rapid Gellant Trican Gelling Agent distillates (petroleum). hydrotreated middle 64742-46-7 100 0.5175 N/A
polysaccharide blend Not Available 100 0.5175 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-09-23 2013-09-24 Surface Water - Runoff 1200
2013-09-23 2013-09-24 Recycled Fracturing Water (treated at well site) 323

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 1192 0.0 0.0 0.0
2014 8708 0.0 0.0 0.0
2015 8673 0.0 0.0 0.0
2016 8612 0.0 0.0 0.0
2017 8649 0.0 0.0 0.0
2018 8611 0.0 0.0 0.0
2019 8751 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-07-31 No Incident Encountered 0.00 0.00
2013-09-23 No Incident Encountered 0.00 0.00

For data sources see[10]

References