X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505122005000

Well Details

Well ID: 0505122005000
Loading map...
Location: 00/05-20-050-12W5/0
Location Alias: 00/05-20-50-12 W5M
Location Alias 2: 00/05-20-050-12 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 12
Section: 20
County/Municipality: Yellowhead County
Well Name: VEI HZ PEMBINA 5-20-50-12
Operator Name: Vermilion Energy Inc.
License Number: 0459737
License Date: 2013-10-01
License Status: Issued
Spud Date: 2014-01-04
Final Drill Date: 2014-01-18
Well Total Depth: 4125.00 m
Surface Hole Latitude: 53.308231
Surface Hole Longitude: -115.727528

For data sources see[1][2]

Well History

Date Event
2013-10-01 Obtained License
2014-01-06 Surface Casing Operation Performed
2014-01-09 Direction Drilling Operation Performed - Deviate
2014-01-10 Direction Drilling Operation Performed - Horizontal
2014-01-17 Production Casing Operation Performed
2014-01-18 Finished Drilling
2014-01-18 Well Log Performed
2014-01-18 Well Mode changed to Drilled and Cased
2014-01-21 Rig Released
2014-03-01 Well Began Production
2014-03-01 Well Fluid changed to Crude Oil
2014-03-01 Well Mode changed to Pumping
2014-03-12 Well Log Performed
2014-03-21 Perforation Treatment Performed - Open-Hole Completion
2014-03-22 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-01-04 Nabors Drilling Limited 15 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-01-09 1396.80 Deviate (5 - 79 degrees)
2014-01-10 2012.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-03-21 Open Hole/Barefoot Completion 4118.00 4125.00 0
2014-03-22 Multi-Stage Fracture 3485.70 3485.80 0
2014-03-22 Multi-Stage Fracture 3409.00 3409.10 0
2014-03-22 Multi-Stage Fracture 3332.50 3332.60 0
2014-03-22 Multi-Stage Fracture 3255.90 3256.00 0
2014-03-22 Multi-Stage Fracture 3179.10 3179.20 0
2014-03-22 Multi-Stage Fracture 3102.70 3102.80 0
2014-03-22 Multi-Stage Fracture 3026.20 3026.30 0
2014-03-22 Multi-Stage Fracture 2950.50 2950.60 0
2014-03-22 Multi-Stage Fracture 2874.10 2874.20 0
2014-03-22 Multi-Stage Fracture 2783.10 2783.20 0
2014-03-22 Multi-Stage Fracture 4095.30 4095.40 0
2014-03-22 Multi-Stage Fracture 2706.40 2706.50 0
2014-03-22 Multi-Stage Fracture 2630.70 2630.80 0
2014-03-22 Multi-Stage Fracture 2553.90 2554.00 0
2014-03-22 Multi-Stage Fracture 2477.10 2477.20 0
2014-03-22 Multi-Stage Fracture 2401.40 2401.50 0
2014-03-22 Multi-Stage Fracture 2324.70 2324.80 0
2014-03-22 Multi-Stage Fracture 2248.00 2248.10 0
2014-03-22 Multi-Stage Fracture 2171.30 2171.40 0
2014-03-22 Multi-Stage Fracture 2080.40 2080.50 0
2014-03-22 Multi-Stage Fracture 2018.30 2018.40 0
2014-03-22 Multi-Stage Fracture 4030.10 4030.20 0
2014-03-22 Multi-Stage Fracture 3953.30 3953.40 0
2014-03-22 Multi-Stage Fracture 3879.60 3879.70 0
2014-03-22 Multi-Stage Fracture 3804.90 3805.00 0
2014-03-22 Multi-Stage Fracture 3728.70 3728.80 0
2014-03-22 Multi-Stage Fracture 3652.40 3652.50 0
2014-03-22 Multi-Stage Fracture 3562.30 3562.40 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-03-22 2014-03-22 1,832 4,420 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 4.33 N/A
water Not Available 100 83.839 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 10.8176 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 0.575 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0104 N/A
dibromoacetonitrile 3252-43-5 100 0.0104 N/A
non-hazardous ingredients Not Available 100 0.0104 N/A
polyethylene glycol 25322-68-3 100 0.0104 N/A
sodium bromide 7647-15-6 100 0.0104 N/A
GBO-1 Trican Breaker sodium perborate tetrahydrate 10486-00-7 100 0.0335 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.1803 N/A
water Not Available 100 0.1803 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0431 N/A
propylene glycol 57-55-6 100 0.0431 N/A
FR-8 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.0896 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0896 N/A
non-hazardous ingredients Not Available 100 0.0896 N/A
GSI-1 Trican Scale Inhibitor non-hazardous ingredients Not Available 100 0.0847 N/A
SS-5 Trican Surfactant aliphatic alcohol 8985 100 0.0934 N/A
aminofunctional polymer 8985 100 0.0934 N/A
distillates (petroleum). sweet medium 64741-86-2 100 0.0934 N/A
isopropanol 67-63-0 100 0.0934 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-03-20 2014-03-22 Recycled Fracturing Water (treated at well site) 1378
2014-03-20 2014-03-22 Groundwater - Non-saline less than or equal to 150m deep 4095

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 6102 0.0 0.0 0.0
2015 8731 0.0 0.0 0.0
2016 8671 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8630 0.0 0.0 0.0
2019 8139 0.0 0.0 0.0
2020 2159 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-01-21 No Incident Encountered 0.00 0.00
2014-03-30 No Incident Encountered 0.00 0.00

For data sources see[10]

References