X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505122009000

Well Details

Well ID: 0505122009000
Loading map...
Location: 00/09-20-050-12W5/0
Location Alias: 00/09-20-50-12 W5M
Location Alias 2: 00/09-20-050-12 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 12
Section: 20
County/Municipality: Yellowhead County
Well Name: VEI HZ PEMBINA 9-20-50-12
Operator Name: Vermilion Energy Inc.
License Number: 0458971
License Date: 2013-08-29
License Status: Issued
Spud Date: 2013-12-03
Final Drill Date: 2013-12-16
Well Total Depth: 4146.00 m
Surface Hole Latitude: 53.352784
Surface Hole Longitude: -115.714693

For data sources see[1][2]

Well History

Date Event
2013-08-29 Obtained License
2013-12-04 Surface Casing Operation Performed
2013-12-06 Direction Drilling Operation Performed - Deviate
2013-12-07 Direction Drilling Operation Performed - Horizontal
2013-12-16 Finished Drilling
2013-12-16 Well Mode changed to Drilled and Cased
2013-12-17 Production Casing Operation Performed
2013-12-18 Rig Released
2014-01-01 Well Began Production
2014-01-01 Well Fluid changed to Crude Oil
2014-01-01 Well Mode changed to Pumping
2014-01-21 Well Log Performed
2014-01-27 Perforation Treatment Performed - Open-Hole Completion
2014-01-29 Perforation Treatment Performed - Multi-Stage Fracture
2014-01-30 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-12-03 Nabors Drilling Limited 19 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-12-06 1418.00 Deviate (5 - 79 degrees)
2013-12-07 1968.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-01-27 Open Hole/Barefoot Completion 4141.00 4146.00 0
2014-01-30 Multi-Stage Fracture 3497.70 3497.80 0
2014-01-30 Multi-Stage Fracture 3409.20 3409.30 0
2014-01-30 Multi-Stage Fracture 3333.50 3333.60 0
2014-01-30 Multi-Stage Fracture 3257.00 3257.10 0
2014-01-30 Multi-Stage Fracture 3165.90 3166.00 0
2014-01-30 Multi-Stage Fracture 3091.50 3091.60 0
2014-01-30 Multi-Stage Fracture 3016.90 3017.00 0
2014-01-30 Multi-Stage Fracture 2927.80 2927.90 0
2014-01-30 Multi-Stage Fracture 2853.90 2854.00 0
2014-01-30 Multi-Stage Fracture 2766.50 2766.60 0
2014-01-29 Multi-Stage Fracture 4117.40 4117.50 0
2014-01-30 Multi-Stage Fracture 2692.00 2692.10 0
2014-01-30 Multi-Stage Fracture 2617.80 2617.90 0
2014-01-30 Multi-Stage Fracture 2533.50 2533.60 0
2014-01-30 Multi-Stage Fracture 2445.20 2445.30 0
2014-01-30 Multi-Stage Fracture 2372.10 2372.20 0
2014-01-30 Multi-Stage Fracture 2285.80 2285.90 0
2014-01-30 Multi-Stage Fracture 2210.30 2210.40 0
2014-01-30 Multi-Stage Fracture 2123.70 2123.80 0
2014-01-30 Multi-Stage Fracture 2050.20 2050.30 0
2014-01-30 Multi-Stage Fracture 2005.00 2005.10 0
2014-01-29 Multi-Stage Fracture 4052.90 4053.00 0
2014-01-29 Multi-Stage Fracture 3978.70 3978.80 0
2014-01-29 Multi-Stage Fracture 3888.90 3889.00 0
2014-01-29 Multi-Stage Fracture 3813.40 3813.50 0
2014-01-29 Multi-Stage Fracture 3737.90 3738.00 0
2014-01-29 Multi-Stage Fracture 3661.90 3662.00 0
2014-01-29 Multi-Stage Fracture 3572.40 3572.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-01-29 2014-01-30 1,819 4,922 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 4.158 N/A
water Not Available 100 85.064 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 10.2146 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 0.4413 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0119 N/A
dibromoacetonitrile 3252-43-5 100 0.0119 N/A
non-hazardous ingredients Not Available 100 0.0119 N/A
polyethylene glycol 25322-68-3 100 0.0119 N/A
sodium bromide 7647-15-6 100 0.0119 N/A
GBO-1 Trican Breaker sodium perborate tetrahydrate 10486-00-7 100 0.0188 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.1835 N/A
water Not Available 100 0.1835 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0797 N/A
propylene glycol 57-55-6 100 0.0797 N/A
FR-8 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.092 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.092 N/A
non-hazardous ingredients Not Available 100 0.092 N/A
GSI-1 Trican Scale Inhibitor non-hazardous ingredients Not Available 100 0.0781 N/A
SS-5 Trican Surfactant aliphatic alcohol 8985 100 0.1068 N/A
aminofunctional polymer 8985 100 0.1068 N/A
distillates (petroleum). sweet medium 64741-86-2 100 0.1068 N/A
isopropanol 67-63-0 100 0.1068 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-01-28 2014-01-30 Groundwater - Non-saline less than or equal to 150m deep 3079
2014-01-29 2014-01-30 Recycled Fracturing Water (treated at well site) 1156

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 7355 0.0 0.0 0.0
2015 8736 0.0 0.0 0.0
2016 8632 0.0 0.0 0.0
2017 8743 0.0 0.0 0.0
2018 8711 0.0 0.0 0.0
2019 8747 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-12-18 No Incident Encountered 0.00 0.00
2014-02-01 No Incident Encountered 0.00 0.00

For data sources see[10]

References