X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505122508020

Well Details

Well ID: 0505122508020
Loading map...
Location: 02/08-25-050-12W5/0
Location Alias: 02/08-25-50-12 W5M
Location Alias 2: 02/08-25-050-12 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 12
Section: 25
County/Municipality: Yellowhead County
Well Name: VERMILION HZ PEMBINA 8-25-50-12
Operator Name: Vermilion Energy Inc.
License Number: 0440749
License Date: 2011-12-09
License Status: Amended
Spud Date: 2012-02-21
Final Drill Date: 2012-03-04
Well Total Depth: 3583.00 m
Surface Hole Latitude: 53.346302
Surface Hole Longitude: -115.636324

For data sources see[1][2]

Well History

Date Event
2011-12-09 Obtained License
2012-02-21 Lost Circulation Occurred
2012-02-22 Lost Circulation Occurred
2012-02-23 Surface Casing Operation Performed
2012-02-25 Direction Drilling Operation Performed - Horizontal
2012-03-04 Finished Drilling
2012-03-04 Well Mode changed to Drilled and Cased
2012-03-07 Production Casing Operation Performed
2012-03-08 Rig Released
2012-08-01 Well Began Production
2012-08-01 Well Fluid changed to Crude Oil
2012-08-01 Well Mode changed to Pumping
2012-08-05 Perforation Treatment Performed - Open-Hole Completion
2012-08-06 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-07 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-02-25 1330.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-08-05 Open Hole/Barefoot Completion 3579.00 3583.00 0
2012-08-07 Multi-Stage Fracture 2558.40 2558.50 0
2012-08-07 Multi-Stage Fracture 2454.90 2455.00 0
2012-08-07 Multi-Stage Fracture 2351.60 2351.70 0
2012-08-07 Multi-Stage Fracture 2262.10 2262.20 0
2012-08-06 Multi-Stage Fracture 3471.90 3472.00 0
2012-08-06 Multi-Stage Fracture 3382.50 3382.60 0
2012-08-06 Multi-Stage Fracture 3176.50 3176.60 0
2012-08-06 Multi-Stage Fracture 3075.10 3075.20 0
2012-08-07 Multi-Stage Fracture 2971.90 2972.00 0
2012-08-07 Multi-Stage Fracture 2868.90 2869.00 0
2012-08-07 Multi-Stage Fracture 2765.30 2765.40 0
2012-08-07 Multi-Stage Fracture 2661.90 2662.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2626 0.0 0.0 0.0
2013 8109 0.0 0.0 0.0
2014 8538 0.0 0.0 0.0
2015 8418 0.0 0.0 0.0
2016 8615 0.0 0.0 0.0
2017 8743 0.0 0.0 0.0
2018 8165 0.0 0.0 0.0
2019 8722 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-02-21 Lost Circulation 49.00 49.00
2012-02-22 Lost Circulation 124.00 124.00
2012-08-08 No Incident Encountered 0.00 0.00

For data sources see[7]

References