If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0505123608020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.35961,"lon":-115.635697,"icon":""}]} |
Location: 02/08-36-050-12W5/0 | |
Location Alias: 02/08-36-50-12 W5M | |
Location Alias 2: 02/08-36-050-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 5 | |
Range: 12 | |
Section: 36 | |
County/Municipality: Yellowhead County | |
Well Name: VERMILION HZ PEMBINA 8-36-50-12 | |
Operator Name: Vermilion Energy Inc. | |
License Number: 0434425 | |
License Date: 2011-06-16 | |
License Status: Amended | |
Spud Date: 2011-09-07 | |
Final Drill Date: 2011-09-15 | |
Well Total Depth: 3326.00 m | |
Surface Hole Latitude: 53.359610 | |
Surface Hole Longitude: -115.635697 |
Date | Event |
---|---|
2011-06-16 | Obtained License |
2011-09-08 | Surface Casing Operation Performed |
2011-09-09 | Well Log Performed |
2011-09-10 | Direction Drilling Operation Performed - Horizontal |
2011-09-15 | Finished Drilling |
2011-09-15 | Well Mode changed to Drilled and Cased |
2011-09-17 | Production Casing Operation Performed |
2011-09-18 | Rig Released |
2011-10-01 | Well Began Production |
2011-10-01 | Well Fluid changed to Crude Oil |
2011-10-01 | Well Mode changed to Pumping |
2011-10-25 | Well Log Performed |
2011-10-27 | Perforation Treatment Performed - Open-Hole Completion |
2011-10-28 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-09-10 | 1314.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-10-27 | Open Hole/Barefoot Completion | 3322.00 | 3326.00 | 0 |
2011-10-28 | Multi-Stage Fracture | 2563.70 | 2563.80 | 0 |
2011-10-28 | Multi-Stage Fracture | 2477.90 | 2478.00 | 0 |
2011-10-28 | Multi-Stage Fracture | 2378.60 | 2378.70 | 0 |
2011-10-28 | Multi-Stage Fracture | 2292.70 | 2292.80 | 0 |
2011-10-28 | Multi-Stage Fracture | 2193.30 | 2193.40 | 0 |
2011-10-28 | Multi-Stage Fracture | 2094.00 | 2094.10 | 0 |
2011-10-28 | Multi-Stage Fracture | 3310.50 | 3310.60 | 0 |
2011-10-28 | Multi-Stage Fracture | 3231.30 | 3231.40 | 0 |
2011-10-28 | Multi-Stage Fracture | 3131.90 | 3132.00 | 0 |
2011-10-28 | Multi-Stage Fracture | 3032.50 | 3032.60 | 0 |
2011-10-28 | Multi-Stage Fracture | 2946.70 | 2946.80 | 0 |
2011-10-28 | Multi-Stage Fracture | 2847.80 | 2847.90 | 0 |
2011-10-28 | Multi-Stage Fracture | 2762.10 | 2762.20 | 0 |
2011-10-28 | Multi-Stage Fracture | 2662.90 | 2663.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 703 | 0.0 | 0.0 | 0.0 |
2012 | 8369 | 0.0 | 0.0 | 0.0 |
2013 | 8671 | 0.0 | 0.0 | 0.0 |
2014 | 8719 | 0.0 | 0.0 | 0.0 |
2015 | 8712 | 0.0 | 0.0 | 0.0 |
2016 | 8627 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8645 | 0.0 | 0.0 | 0.0 |
2019 | 8730 | 0.0 | 0.0 | 0.0 |
2020 | 2151 | 0.0 | 0.0 | 0.0 |
For data sources see[6]