X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505130413020

Well Details

Well ID: 0505130413020
Loading map...
Location: 02/13-04-050-13W5/0
Location Alias: 02/13-04-50-13 W5M
Location Alias 2: 02/13-04-050-13 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 13
Section: 04
County/Municipality: Yellowhead County
Well Name: VEI HZ WESTPEM 13-4-50-13
Operator Name: Vermilion Energy Inc.
License Number: 0472856
License Date: 2014-12-09
License Status: Issued
Spud Date: 2015-02-20
Final Drill Date: 2015-03-08
Well Total Depth: 3902.00 m
Surface Hole Latitude: 53.280473
Surface Hole Longitude: -115.852792

For data sources see[1][2]

Well History

Date Event
2014-12-09 Obtained License
2015-02-22 Surface Casing Operation Performed
2015-02-23 Direction Drilling Operation Performed - Deviate
2015-02-26 Kick Occurred
2015-02-27 Intermediate Casing Operation Performed
2015-03-02 Direction Drilling Operation Performed - Horizontal
2015-03-08 Finished Drilling
2015-03-08 Well Log Performed
2015-03-08 Well Mode changed to Drilled and Cased
2015-03-10 Production Casing Operation Performed
2015-03-11 Rig Released
2015-03-16 Well Log Performed
2015-03-26 Perforation Treatment Performed - Open-Hole Completion
2015-03-27 Perforation Treatment Performed - Multi-Stage Fracture
2015-04-01 Well Fluid changed to Gas
2015-04-01 Well Mode changed to Testing
2015-05-04 Well Began Production
2015-05-04 Well Fluid changed to Gas
2015-05-04 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-02-20 Nabors Drilling Limited 19 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-02-23 831.00 Deviate (5 - 79 degrees)
2015-03-02 2695.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-03-26 Open Hole/Barefoot Completion 3895.00 3902.00 0
2015-03-27 Multi-Stage Fracture 3201.30 3201.40 0
2015-03-27 Multi-Stage Fracture 3113.60 3113.70 0
2015-03-27 Multi-Stage Fracture 3025.70 3025.80 0
2015-03-27 Multi-Stage Fracture 2937.40 2937.50 0
2015-03-27 Multi-Stage Fracture 2849.10 2849.20 0
2015-03-27 Multi-Stage Fracture 2775.90 2776.00 0
2015-03-27 Multi-Stage Fracture 2702.80 2702.90 0
2015-03-27 Multi-Stage Fracture 3871.40 3871.50 0
2015-03-27 Multi-Stage Fracture 3811.70 3811.80 0
2015-03-27 Multi-Stage Fracture 3724.40 3724.50 0
2015-03-27 Multi-Stage Fracture 3637.10 3637.20 0
2015-03-27 Multi-Stage Fracture 3549.80 3549.90 0
2015-03-27 Multi-Stage Fracture 3462.80 3462.90 0
2015-03-27 Multi-Stage Fracture 3375.90 3376.00 0
2015-03-27 Multi-Stage Fracture 3288.60 3288.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-03-27 2015-03-27 2,518 2,059 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 4.2248 N/A
water Not Available 100 75.831 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 19.6924 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 0.4956 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0094 N/A
dibromoacetonitrile 3252-43-5 100 0.0094 N/A
non-hazardous ingredients Not Available 100 0.0094 N/A
polyethylene glycol 25322-68-3 100 0.0094 N/A
sodium bromide 7647-15-6 100 0.0094 N/A
EnCap-HP Trican Breaker ammonium persulfate 7727-54-0 100 0.0075 N/A
cured acrylic resin Not Available 100 0.0075 N/A
silica crystalline 14808-60-7 100 0.0075 N/A
GBE-1:5 Trican Breaker non-hazardous ingredients Not Available 100 0.0106 N/A
propylene glycol 57-55-6 100 0.0106 N/A
CC-6 Trican Clay Control choline chloride 67-48-1 100 0.1631 N/A
formic acid 64-18-6 100 0.1631 N/A
non-hazardous ingredients Not Available 100 0.1631 N/A
FE-1 Trican Conductivity Enhancer citrus terpenes 68647-72-3 100 0.141 N/A
isopropanol 67-63-0 100 0.141 N/A
non-hazardous ingredients Not Available 100 0.141 N/A
triethylene glycol 112-27-6 100 0.141 N/A
WXB-77 Trican Crosslinker borate salts 1319-33-1 100 0.3786 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.3786 N/A
WG-111d Trican Gelling Agent guar gum 9000-30-0 100 0.1819 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-03-26 2015-03-27 Groundwater - Non-saline less than or equal to 150m deep 2514

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 5250 0.0 0.0 0.0
2016 7583 0.0 0.0 0.0
2017 4504 0.0 0.0 0.0
2018 3252 0.0 0.0 0.0
2019 7559 0.0 0.0 0.0
2020 2178 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-02-26 Kick 2436.00 2436.00
2015-04-10 No Incident Encountered 0.00 0.00

For data sources see[10]

References