X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505131314020

Well Details

Well ID: 0505131314020
Loading map...
Location: 02/14-13-050-13W5/0
Location Alias: 02/14-13-50-13 W5M
Location Alias 2: 02/14-13-050-13 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 13
Section: 13
County/Municipality: Yellowhead County
Well Name: VEI HZ PEMBINA 14-13-50-13
Operator Name: Vermilion Energy Inc.
License Number: 0477253
License Date: 2015-10-09
License Status: Issued
Spud Date: 2015-11-17
Final Drill Date: 2015-11-26
Well Total Depth: 3851.00 m
Surface Hole Latitude: 53.308031
Surface Hole Longitude: -115.782325

For data sources see[1][2]

Well History

Date Event
2015-10-09 Obtained License
2015-11-17 Surface Casing Operation Performed
2015-11-20 Direction Drilling Operation Performed - Deviate
2015-11-22 Direction Drilling Operation Performed - Horizontal
2015-11-26 Finished Drilling
2015-11-26 Well Log Performed
2015-11-26 Well Mode changed to Drilled and Cased
2015-11-27 Production Casing Operation Performed
2015-11-28 Rig Released
2015-12-01 Well Fluid changed to Gas
2015-12-01 Well Mode changed to Testing
2015-12-08 Perforation Treatment Performed - Open-Hole Completion
2015-12-09 Perforation Treatment Performed - Multi-Stage Fracture
2015-12-10 Perforation Treatment Performed - Multi-Stage Fracture
2016-01-01 Well Began Production
2016-01-01 Well Fluid changed to Gas
2016-01-01 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-11-17 Ironhand Drilling Inc. 5 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-11-20 1632.00 Deviate (5 - 79 degrees)
2015-11-22 2743.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-12-08 Open Hole/Barefoot Completion 3828.00 3851.00 0
2015-12-09 Multi-Stage Fracture 3257.30 3257.40 0
2015-12-09 Multi-Stage Fracture 3198.40 3198.50 0
2015-12-10 Multi-Stage Fracture 3139.40 3139.50 0
2015-12-10 Multi-Stage Fracture 3080.50 3080.60 0
2015-12-10 Multi-Stage Fracture 3021.60 3021.70 0
2015-12-10 Multi-Stage Fracture 2962.80 2962.90 0
2015-12-10 Multi-Stage Fracture 2903.90 2904.00 0
2015-12-10 Multi-Stage Fracture 2831.60 2831.70 0
2015-12-09 Multi-Stage Fracture 3823.30 3823.40 0
2015-12-09 Multi-Stage Fracture 3763.60 3763.70 0
2015-12-09 Multi-Stage Fracture 3691.10 3691.20 0
2015-12-09 Multi-Stage Fracture 3618.60 3618.70 0
2015-12-09 Multi-Stage Fracture 3546.20 3546.30 0
2015-12-09 Multi-Stage Fracture 3473.70 3473.80 0
2015-12-09 Multi-Stage Fracture 3401.20 3401.30 0
2015-12-09 Multi-Stage Fracture 3329.80 3329.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-12-09 2015-12-10 2,407 2,371 N/A
2 2015-12-10 2015-12-10 2,407 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 4.1976 N/A
water Not Available 100 75.3877 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 20.5363 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 0.4261 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0099 N/A
dibromoacetonitrile 3252-43-5 100 0.0099 N/A
non-hazardous ingredients Not Available 100 0.0099 N/A
polyethylene glycol 25322-68-3 100 0.0099 N/A
sodium bromide 7647-15-6 100 0.0099 N/A
EnCap-LP Trican Breaker ammonium persulfate 7727-54-0 100 0.0079 N/A
cured acrylic resin Not Available 100 0.0079 N/A
silica crystalline 14808-60-7 100 0.0079 N/A
CC-6 Trican Clay Control choline chloride 67-48-1 100 0.1231 N/A
formic acid 64-18-6 100 0.1231 N/A
non-hazardous ingredients Not Available 100 0.1231 N/A
FE-5 Trican Conductivity Enhancer D-Glucopyranose. oligomers. decyl octyl glycosides 68515-73-1 100 0.0404 N/A
non-hazardous ingredients Not Available 100 0.0404 N/A
WXB-77 Trican Crosslinker borate salts 1319-33-1 100 0.4158 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.4158 N/A
WG-111d Trican Gelling Agent guar gum 9000-30-0 100 0.1641 N/A
2 GBE-1:5 Trican Breaker non-hazardous ingredients Not Available 100 0.0115 N/A
propylene glycol 57-55-6 100 0.0115 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-11-30 2015-12-08 Groundwater - Non-saline less than or equal to 150m deep 1325
2015-12-05 2015-12-05 Groundwater - Non-saline less than or equal to 150m deep 1295

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 24 0.0 0.0 0.0
2016 8473 0.0 0.0 0.0
2017 8732 0.0 0.0 0.0
2018 8544 0.0 0.0 0.0
2019 8345 0.0 0.0 0.0
2020 2036 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-11-28 No Incident Encountered 0.00 0.00
2015-12-14 No Incident Encountered 0.00 0.00

For data sources see[10]

References