X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505133213020

Well Details

Well ID: 0505133213020
Loading map...
Location: 02/13-32-050-13W5/0
Location Alias: 02/13-32-50-13 W5M
Location Alias 2: 02/13-32-050-13 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 13
Section: 32
County/Municipality: Yellowhead County
Well Name: VEI HZ PEMBINA 13-32-50-13
Operator Name: Vermilion Energy Inc.
License Number: 0492773
License Date: 2018-12-14
License Status: Issued
Spud Date: 2019-01-23
Final Drill Date: 2019-02-06
Well Total Depth: 4462.00 m
Surface Hole Latitude: 53.351784
Surface Hole Longitude: -115.856434

For data sources see[1][2]

Well History

Date Event
2018-12-14 Obtained License
2019-01-24 Surface Casing Operation Performed
2019-01-26 Direction Drilling Operation Performed - Deviate
2019-01-28 Direction Drilling Operation Performed - Horizontal
2019-01-28 Well Log Performed
2019-02-06 Finished Drilling
2019-02-06 Well Log Performed
2019-02-06 Well Mode changed to Drilled and Cased
2019-02-08 Production Casing Operation Performed
2019-02-09 Rig Released
2019-02-18 Perforation Treatment Performed - Open-Hole Completion
2019-02-19 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-20 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-18 Well Began Production
2019-03-18 Well Fluid changed to Gas
2019-03-18 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-01-23 Horizon Drilling Inc. 23 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-01-26 2134.80 Deviate (5 - 79 degrees)
2019-01-28 2529.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-02-18 Open Hole/Barefoot Completion 4457.00 4462.00 0
2019-02-19 Multi-Stage Fracture 3830.20 3830.30 0
2019-02-19 Multi-Stage Fracture 3760.70 3760.80 0
2019-02-19 Multi-Stage Fracture 3691.20 3691.30 0
2019-02-19 Multi-Stage Fracture 3608.30 3608.40 0
2019-02-19 Multi-Stage Fracture 3538.80 3538.90 0
2019-02-19 Multi-Stage Fracture 3469.30 3469.40 0
2019-02-19 Multi-Stage Fracture 3386.30 3386.40 0
2019-02-19 Multi-Stage Fracture 3316.80 3316.90 0
2019-02-19 Multi-Stage Fracture 3234.60 3234.70 0
2019-02-19 Multi-Stage Fracture 3165.10 3165.20 0
2019-02-19 Multi-Stage Fracture 4418.50 4418.60 0
2019-02-20 Multi-Stage Fracture 3095.60 3095.70 0
2019-02-20 Multi-Stage Fracture 3012.50 3012.60 0
2019-02-20 Multi-Stage Fracture 2943.00 2943.10 0
2019-02-20 Multi-Stage Fracture 2873.50 2873.60 0
2019-02-20 Multi-Stage Fracture 2790.40 2790.50 0
2019-02-20 Multi-Stage Fracture 2721.40 2721.50 0
2019-02-20 Multi-Stage Fracture 2651.30 2651.40 0
2019-02-19 Multi-Stage Fracture 4356.70 4356.80 0
2019-02-19 Multi-Stage Fracture 4273.70 4273.80 0
2019-02-19 Multi-Stage Fracture 4204.30 4204.40 0
2019-02-19 Multi-Stage Fracture 4135.30 4135.40 0
2019-02-19 Multi-Stage Fracture 4052.30 4052.40 0
2019-02-19 Multi-Stage Fracture 3982.80 3982.90 0
2019-02-19 Multi-Stage Fracture 3913.30 3913.40 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-02-19 2019-02-20 2,428 3,051 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Nitrogen Not Available 100 17.5426 N/A
Water 7732-18-5 100 62.1968 N/A
30/50 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 19.7736 N/A
Secure BIO-10B (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.0065 N/A
Methyl Alcohol 67-56-1 100 0.0065 N/A
Non-Hazardous Ingredients Not Available 100 0.0065 N/A
SCBO-2 (Breaker) Step Energy Services Breaker Ammonium Persulfate 7727-54-0 100 0.0094 N/A
Cured Acrylic Resin Not Available 100 0.0094 N/A
Non-Hazardous Ingredients Not Available 100 0.0094 N/A
SCS-1 (Clay Control) Step Energy Services Clay Control Choline chloride 67-48-1 100 0.0948 N/A
Non-Hazardous Ingredients Not Available 100 0.0948 N/A
SBX-7 (Crosslinker) Step Energy Services Crosslinker Non-Hazardous Ingredients Not Available 100 0.1776 N/A
Petroleum Distillates. hydrotreated light 64742-47-8 100 0.1776 N/A
SWG-101 (Gellant) Step Energy Services Gelling Agent Guar gum 9000-30-0 100 0.1354 N/A
SNE-8 (Non-Emulsifier) Step Energy Services Surfactant Alkyl Aryl Sulfonic Acid Not Available 100 0.063 N/A
Alkyl Sulfate Not Available 100 0.063 N/A
Methanol 67-56-1 100 0.063 N/A
Polyalkylhydroxyl Alcohol Not Available 100 0.063 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-02-19 2019-02-19 Central Water Distribution Facility 3051

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 6765 0.0 0.0 0.0
2020 2123 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-02-09 No Incident Encountered 0.00 0.00
2019-02-25 No Incident Encountered 0.00 0.00

For data sources see[10]

References