If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0505133213020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.351784,"lon":-115.856434,"icon":""}]} |
Location: 02/13-32-050-13W5/0 | |
Location Alias: 02/13-32-50-13 W5M | |
Location Alias 2: 02/13-32-050-13 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 5 | |
Range: 13 | |
Section: 32 | |
County/Municipality: Yellowhead County | |
Well Name: VEI HZ PEMBINA 13-32-50-13 | |
Operator Name: Vermilion Energy Inc. | |
License Number: 0492773 | |
License Date: 2018-12-14 | |
License Status: Issued | |
Spud Date: 2019-01-23 | |
Final Drill Date: 2019-02-06 | |
Well Total Depth: 4462.00 m | |
Surface Hole Latitude: 53.351784 | |
Surface Hole Longitude: -115.856434 |
Date | Event |
---|---|
2018-12-14 | Obtained License |
2019-01-24 | Surface Casing Operation Performed |
2019-01-26 | Direction Drilling Operation Performed - Deviate |
2019-01-28 | Direction Drilling Operation Performed - Horizontal |
2019-01-28 | Well Log Performed |
2019-02-06 | Finished Drilling |
2019-02-06 | Well Log Performed |
2019-02-06 | Well Mode changed to Drilled and Cased |
2019-02-08 | Production Casing Operation Performed |
2019-02-09 | Rig Released |
2019-02-18 | Perforation Treatment Performed - Open-Hole Completion |
2019-02-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-18 | Well Began Production |
2019-03-18 | Well Fluid changed to Gas |
2019-03-18 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2019-01-23 | Horizon Drilling Inc. | 23 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2019-01-26 | 2134.80 | Deviate (5 - 79 degrees) |
2019-01-28 | 2529.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-02-18 | Open Hole/Barefoot Completion | 4457.00 | 4462.00 | 0 |
2019-02-19 | Multi-Stage Fracture | 3830.20 | 3830.30 | 0 |
2019-02-19 | Multi-Stage Fracture | 3760.70 | 3760.80 | 0 |
2019-02-19 | Multi-Stage Fracture | 3691.20 | 3691.30 | 0 |
2019-02-19 | Multi-Stage Fracture | 3608.30 | 3608.40 | 0 |
2019-02-19 | Multi-Stage Fracture | 3538.80 | 3538.90 | 0 |
2019-02-19 | Multi-Stage Fracture | 3469.30 | 3469.40 | 0 |
2019-02-19 | Multi-Stage Fracture | 3386.30 | 3386.40 | 0 |
2019-02-19 | Multi-Stage Fracture | 3316.80 | 3316.90 | 0 |
2019-02-19 | Multi-Stage Fracture | 3234.60 | 3234.70 | 0 |
2019-02-19 | Multi-Stage Fracture | 3165.10 | 3165.20 | 0 |
2019-02-19 | Multi-Stage Fracture | 4418.50 | 4418.60 | 0 |
2019-02-20 | Multi-Stage Fracture | 3095.60 | 3095.70 | 0 |
2019-02-20 | Multi-Stage Fracture | 3012.50 | 3012.60 | 0 |
2019-02-20 | Multi-Stage Fracture | 2943.00 | 2943.10 | 0 |
2019-02-20 | Multi-Stage Fracture | 2873.50 | 2873.60 | 0 |
2019-02-20 | Multi-Stage Fracture | 2790.40 | 2790.50 | 0 |
2019-02-20 | Multi-Stage Fracture | 2721.40 | 2721.50 | 0 |
2019-02-20 | Multi-Stage Fracture | 2651.30 | 2651.40 | 0 |
2019-02-19 | Multi-Stage Fracture | 4356.70 | 4356.80 | 0 |
2019-02-19 | Multi-Stage Fracture | 4273.70 | 4273.80 | 0 |
2019-02-19 | Multi-Stage Fracture | 4204.30 | 4204.40 | 0 |
2019-02-19 | Multi-Stage Fracture | 4135.30 | 4135.40 | 0 |
2019-02-19 | Multi-Stage Fracture | 4052.30 | 4052.40 | 0 |
2019-02-19 | Multi-Stage Fracture | 3982.80 | 3982.90 | 0 |
2019-02-19 | Multi-Stage Fracture | 3913.30 | 3913.40 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-02-19 | 2019-02-20 | 2,428 | 3,051 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Nitrogen | Not Available | 100 | 17.5426 | N/A | |||
Water | 7732-18-5 | 100 | 62.1968 | N/A | ||||
30/50 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 19.7736 | N/A | ||
Secure BIO-10B (Biocide) | Step Energy Services | Bactericide/Biocide | 2-bromo-2-nitro.3-diol | 52-51-7 | 100 | 0.0065 | N/A | |
Methyl Alcohol | 67-56-1 | 100 | 0.0065 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0065 | N/A | ||||
SCBO-2 (Breaker) | Step Energy Services | Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.0094 | N/A | |
Cured Acrylic Resin | Not Available | 100 | 0.0094 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0094 | N/A | ||||
SCS-1 (Clay Control) | Step Energy Services | Clay Control | Choline chloride | 67-48-1 | 100 | 0.0948 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.0948 | N/A | ||||
SBX-7 (Crosslinker) | Step Energy Services | Crosslinker | Non-Hazardous Ingredients | Not Available | 100 | 0.1776 | N/A | |
Petroleum Distillates. hydrotreated light | 64742-47-8 | 100 | 0.1776 | N/A | ||||
SWG-101 (Gellant) | Step Energy Services | Gelling Agent | Guar gum | 9000-30-0 | 100 | 0.1354 | N/A | |
SNE-8 (Non-Emulsifier) | Step Energy Services | Surfactant | Alkyl Aryl Sulfonic Acid | Not Available | 100 | 0.063 | N/A | |
Alkyl Sulfate | Not Available | 100 | 0.063 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.063 | N/A | ||||
Polyalkylhydroxyl Alcohol | Not Available | 100 | 0.063 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-02-19 | 2019-02-19 | Central Water Distribution Facility | 3051 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 6765 | 0.0 | 0.0 | 0.0 |
2020 | 2123 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-02-09 | No Incident Encountered | 0.00 | 0.00 |
2019-02-25 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]