X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505133501020

Well Details

Well ID: 0505133501020
Loading map...
Location: 02/01-35-050-13W5/0
Location Alias: 02/01-35-50-13 W5M
Location Alias 2: 02/01-35-050-13 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 13
Section: 35
County/Municipality: Yellowhead County
Well Name: VEI HZ PEMBINA 1-35-50-13
Operator Name: Vermilion Energy Inc.
License Number: 0497214
License Date: 2019-12-24
License Status: Amended
Spud Date: 2020-02-23
Final Drill Date: 2020-03-16
Well Total Depth: 5117.00 m
Surface Hole Latitude: 53.361257
Surface Hole Longitude: -115.836121

For data sources see[1][2]


Directional Drilling

Start Date Depth (m) Reason
2020-02-26 1963.10 Deviate (5 - 79 degrees)
2020-02-29 2591.00 Horizontal

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-03-25 Multi-Stage Fracture 5072.30 5072.40 0
2020-03-26 Multi-Stage Fracture 4179.50 4179.60 0
2020-03-26 Multi-Stage Fracture 4120.60 4120.70 0
2020-03-26 Multi-Stage Fracture 3925.90 3926.00 0
2020-03-26 Multi-Stage Fracture 3813.40 3813.50 0
2020-03-26 Multi-Stage Fracture 3526.80 3526.90 0
2020-03-26 Multi-Stage Fracture 3454.00 3454.10 0
2020-03-27 Multi-Stage Fracture 3367.70 3367.80 0
2020-03-27 Multi-Stage Fracture 3242.30 3242.40 0
2020-03-27 Multi-Stage Fracture 3168.00 3168.10 0
2020-03-27 Multi-Stage Fracture 3097.00 3097.10 0
2020-03-26 Multi-Stage Fracture 4986.30 4986.40 0
2020-03-27 Multi-Stage Fracture 3023.30 3023.40 0
2020-03-27 Multi-Stage Fracture 2912.30 2912.40 0
2020-03-27 Multi-Stage Fracture 2824.40 2824.50 0
2020-03-27 Multi-Stage Fracture 2752.30 2752.40 0
2020-03-27 Multi-Stage Fracture 2679.40 2679.50 0
2020-03-26 Multi-Stage Fracture 4905.10 4905.20 0
2020-03-26 Multi-Stage Fracture 4769.70 4769.80 0
2020-03-26 Multi-Stage Fracture 4699.20 4699.30 0
2020-03-26 Multi-Stage Fracture 4626.10 4626.20 0
2020-03-26 Multi-Stage Fracture 4498.80 4498.90 0
2020-03-26 Multi-Stage Fracture 4426.50 4426.60 0
2020-03-26 Multi-Stage Fracture 4353.40 4353.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 1 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-03-19 No Incident Encountered 0.00 0.00
2020-04-01 No Incident Encountered 0.00 0.00

For data sources see[6]

References