X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514260409000

Well Details

Well ID: 0514260409000
Loading map...
Location: 00/09-04-051-26W4/0
Location Alias: 00/09-04-51-26 W4M
Location Alias 2: 00/09-04-051-26 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 26
Section: 04
County/Municipality: Parkland County
Well Name: IMPERIAL WOODBEND NO 27
Operator Name: Imperial Oil Resources Limited
License Number: 0001456
License Date: 1950-05-13
License Status: RecCertified
Spud Date: 1950-05-27
Final Drill Date: 1950-06-23
Well Total Depth: 1620.30 m
Surface Hole Latitude: 53.376077
Surface Hole Longitude: -113.766215

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-05-13 Obtained License
1950-06-14 Drill Stem Test Performed
1950-06-15 Drill Stem Test Performed
1950-06-19 Liner Casing Operation Performed
1950-06-23 Finished Drilling
1950-06-23 Well Mode changed to Drilled and Cased
1950-06-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1950-06-26 Perforation Treatment Performed - Jet Perforation
1950-06-27 Well Began Production
1950-06-27 Well Fluid changed to Crude Oil
1950-06-27 Well Mode changed to Flowing
1973-09-06 Well Fluid changed to Crude Oil
1973-09-06 Well Mode changed to Pumping
1982-04-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-04-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-04-12 Perforation Treatment Performed - Cement Squeeze
1982-04-21 Perforation Treatment Performed - Jet Perforation
1982-04-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-04-11 Well Fluid changed to Crude Oil
1983-04-11 Well Mode changed to Suspended
1993-08-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-08-20 Perforation Treatment Performed - Jet Perforation
1993-08-20 Plug Back Performed
1993-08-24 Well Log Performed
1993-08-28 Perforation Treatment Performed - Remedial Casing
1993-08-28 Well Fluid changed to Crude Oil
1993-08-28 Well Mode changed to Abandoned
1993-09-01 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-06-26 Perforation 1616.70 1618.20 13
1993-08-20 Packing Device Capped w/Cement 1261.00 1269.00 0
1993-08-20 Perforation 160.00 160.50 14
1993-08-28 Remedial Casing Cementing 160.00 160.50 0
1950-06-26 Acid Treatment 1616.70 1618.20 0
1950-06-26 Perforation 1616.70 1618.20 7
1982-04-08 Acid Treatment 1616.70 1618.20 0
1982-04-12 Acid Treatment 1616.70 1618.20 0
1982-04-12 Cement Squeeze 1616.70 1618.20 0
1982-04-21 Perforation 1615.20 1615.40 13
1982-04-22 Acid Treatment 1615.20 1615.40 0
1993-08-20 Packing Device Capped w/Cement 1593.00 1601.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 3712 0.0 0.0 0.0
1968 6826 0.0 0.0 0.0
1973 2800 0.0 0.0 0.0
1974 7965 0.0 0.0 0.0
1975 1732 0.0 0.0 0.0

For data sources see[5]

References