X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514260507002

Well Details

Well ID: 0514260507002
Loading map...
Location: 00/07-05-051-26W4/2
Location Alias: 00/07-05-51-26 W4M
Location Alias 2: 00/07-05-051-26 W4/02
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 26
Section: 05
County/Municipality: Parkland County
Well Name: MEC LEDUC-WB 7-5-51-26
Operator Name: NEP Canada ULC
License Number: 0000430
License Date: 1949-08-03
License Status: Suspension
Spud Date: 1949-08-03
Final Drill Date: 1949-09-04
Well Total Depth: 1616.00 m
Surface Hole Latitude: 53.372445
Surface Hole Longitude: -113.796720

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-08-03 Obtained License
1949-08-24 Drill Stem Test Performed
1949-08-25 Drill Stem Test Performed
1949-08-28 Liner Casing Operation Performed
1949-09-04 Finished Drilling
1949-09-04 Perforation Treatment Performed - Open-Hole Completion
1949-09-04 Well Mode changed to Drilled and Cased
1953-07-24 Perforation Treatment Performed - Jet Perforation
1953-07-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1953-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1953-07-31 Perforation Treatment Performed - Fractured
1953-08-11 Perforation Treatment Performed - Jet Perforation
1953-08-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1953-08-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1953-09-15 Well Began Production
1953-09-15 Well Fluid changed to Crude Oil
1953-09-15 Well Mode changed to Flowing
1954-02-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-08-09 Well Fluid changed to Crude Oil
1961-08-09 Well Mode changed to Suspended
1985-08-15 Well Log Performed
1985-08-16 Well Log Performed
1985-08-21 Perforation Treatment Performed - Cement Squeeze
1985-08-29 Perforation Treatment Performed - Cement Plug
1985-08-29 Plug Back Performed
1985-08-29 Well Fluid changed to Crude Oil
1985-08-29 Well Mode changed to Abandoned Zone
1985-09-04 Perforation Treatment Performed - Jet Perforation
1985-09-04 Well Log Performed
1985-09-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-09-06 Perforation Treatment Performed - Cement Squeeze
1985-09-06 Well Log Performed
1985-09-09 Perforation Treatment Performed - Jet Perforation
1985-09-09 Well Log Performed
1985-09-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-09-12 Perforation Treatment Performed - Jet Perforation
1985-09-12 Well Log Performed
1996-09-10 Well Log Performed
1996-09-11 Perforation Treatment Performed - Jet Perforation
1999-12-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-12-18 Plug Back Performed
1999-12-19 Perforation Treatment Performed - Jet Perforation
2000-09-19 Perforation Treatment Performed - Fractured
2006-10-11 Perforation Treatment Performed - Bridge Plug No Cement Required

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-09-04 Open Hole/Barefoot Completion 1614.50 1616.00 0
1953-08-12 Acid Treatment 1510.60 1542.90 0
1953-08-15 Acid Treatment 1510.60 1542.90 0
1954-02-01 Acid Treatment 1510.60 1542.90 0
1985-08-21 Cement Squeeze 1510.60 1542.90 0
1985-08-29 Cement Plug 1510.60 1542.90 0
1985-09-04 Perforation 1613.00 1613.10 13
1985-09-05 Acid Treatment 1613.00 1613.10 0
1985-09-06 Cement Squeeze 1613.00 1613.10 0
1985-09-09 Perforation 1611.70 1611.80 13
1985-09-10 Acid Treatment 1611.70 1611.80 0
1953-07-24 Perforation 1536.80 1542.90 10
1985-09-12 Perforation 1611.40 1611.50 13
1996-09-11 Perforation 1593.50 1594.50 13
1999-12-18 Packing Device Capped w/Cement 1577.00 1585.00 0
1999-12-19 Perforation 1374.50 1378.50 18
2000-09-19 Fracture 1374.50 1378.50 0
2006-10-11 Bridge Plug, No Cement 1364.50 1364.60 0
1953-07-25 Acid Treatment 1536.80 1542.90 0
1953-07-31 Fracture 1536.80 1542.90 0
1953-07-31 Acid Treatment 1536.80 1542.90 0
1953-08-11 Perforation 1510.60 1513.00 13
1953-08-11 Perforation 1516.40 1517.90 13
1953-08-11 Perforation 1521.60 1524.00 13
1953-08-11 Perforation 1527.00 1531.60 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References