If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0514261505000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.401418,"lon":-113.760173,"icon":""}]} |
Location: 00/05-15-051-26W4/0 | |
Location Alias: 00/05-15-51-26 W4M | |
Location Alias 2: 00/05-15-051-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 051 | |
Meridian: 4 | |
Range: 26 | |
Section: 15 | |
County/Municipality: Parkland County | |
Well Name: IMPERIAL-WOODBEND #1 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: B0001849 | |
License Date: 1947-08-28 | |
License Status: RecCertified | |
Spud Date: 1947-10-14 | |
Final Drill Date: 1948-01-18 | |
Well Total Depth: 1627.60 m | |
Surface Hole Latitude: 53.401418 | |
Surface Hole Longitude: -113.760173 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1947-08-28 | Obtained License |
1947-11-11 | Drill Stem Test Performed |
1947-11-28 | Drill Stem Test Performed |
1947-12-05 | Drill Stem Test Performed |
1947-12-14 | Drill Stem Test Performed |
1948-01-07 | Drill Stem Test Performed |
1948-01-10 | Drill Stem Test Performed |
1948-01-11 | Drill Stem Test Performed |
1948-01-12 | Drill Stem Test Performed |
1948-01-13 | Drill Stem Test Performed |
1948-01-18 | Drill Stem Test Performed |
1948-01-18 | Finished Drilling |
1948-01-18 | Well Mode changed to Drilled and Cased |
1948-01-22 | Production Casing Operation Performed |
1948-01-27 | Perforation Treatment Performed - Bullet Perforation |
1948-01-28 | Well Began Production |
1948-01-28 | Well Fluid changed to Crude Oil |
1948-01-28 | Well Mode changed to Flowing |
1974-05-23 | Well Fluid changed to Crude Oil |
1974-05-23 | Well Mode changed to Pumping |
1978-07-13 | Perforation Treatment Performed - Cement Plug |
1978-07-17 | Perforation Treatment Performed - Jet Perforation |
1978-07-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-06-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-06-22 | Well Log Performed |
1987-06-23 | Perforation Treatment Performed - Cement Squeeze |
1987-06-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-06-25 | Perforation Treatment Performed - Jet Perforation |
1987-06-25 | Well Log Performed |
1989-10-25 | Well Fluid changed to Crude Oil |
1989-10-25 | Well Mode changed to Suspended |
1993-08-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-08-27 | Perforation Treatment Performed - Jet Perforation |
1993-08-27 | Plug Back Performed |
1993-08-27 | Well Log Performed |
1993-09-03 | Perforation Treatment Performed - Remedial Casing |
1993-09-03 | Well Fluid changed to Crude Oil |
1993-09-03 | Well Mode changed to Abandoned |
1993-09-07 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1948-01-27 | Bullet Perforation | 1617.90 | 1620.90 | 10 |
1993-08-27 | Packing Device Capped w/Cement | 1267.00 | 1275.00 | 0 |
1993-08-27 | Perforation | 160.00 | 160.50 | 13 |
1993-09-03 | Remedial Casing Cementing | 160.00 | 160.50 | 0 |
1978-07-13 | Cement Plug | 1618.80 | 1622.50 | 0 |
1978-07-17 | Perforation | 1617.80 | 1618.20 | 7 |
1978-07-18 | Acid Treatment | 1617.80 | 1618.20 | 0 |
1987-06-19 | Acid Treatment | 1617.80 | 1618.20 | 0 |
1987-06-23 | Cement Squeeze | 1617.80 | 1618.20 | 0 |
1987-06-25 | Perforation | 1614.50 | 1614.70 | 13 |
1987-06-25 | Acid Treatment | 1614.50 | 1614.70 | 0 |
1993-08-27 | Packing Device Capped w/Cement | 1592.00 | 1600.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 8272 | 0.0 | 0.0 | 0.0 |
1968 | 8198 | 0.0 | 0.0 | 0.0 |
1969 | 5586 | 0.0 | 0.0 | 0.0 |
1970 | 4812 | 0.0 | 0.0 | 0.0 |
1971 | 7631 | 0.0 | 0.0 | 0.0 |
1972 | 7960 | 0.0 | 0.0 | 0.0 |
1973 | 8572 | 0.0 | 0.0 | 0.0 |
1974 | 8377 | 0.0 | 0.0 | 0.0 |
1975 | 8384 | 0.0 | 0.0 | 0.0 |
1976 | 8568 | 0.0 | 0.0 | 0.0 |
1977 | 8236 | 0.0 | 0.0 | 0.0 |
1978 | 7595 | 0.0 | 0.0 | 0.0 |
1979 | 8511 | 0.0 | 0.0 | 0.0 |
1980 | 8303 | 0.0 | 0.0 | 0.0 |
1981 | 8306 | 0.0 | 0.0 | 0.0 |
1982 | 8627 | 0.0 | 0.0 | 0.0 |
1983 | 8203 | 0.0 | 0.0 | 0.0 |
1984 | 7994 | 0.0 | 0.0 | 0.0 |
1985 | 7986 | 0.0 | 0.0 | 0.0 |
1986 | 8390 | 0.0 | 0.0 | 0.0 |
1987 | 7901 | 0.0 | 0.0 | 0.0 |
1988 | 8600 | 0.0 | 0.0 | 0.0 |
1989 | 6781 | 0.0 | 0.0 | 0.0 |
For data sources see[5]