X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514261506000

Well Details

Well ID: 0514261506000
Loading map...
Location: 00/06-15-051-26W4/0
Location Alias: 00/06-15-51-26 W4M
Location Alias 2: 00/06-15-051-26 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 26
Section: 15
County/Municipality: Parkland County
Well Name: IMPERIAL WOODBEND NO. 5
Operator Name: Imperial Oil Resources Limited
License Number: B0002133
License Date: 1948-06-08
License Status: Abandoned
Spud Date: 1948-06-19
Final Drill Date: 1948-07-29
Well Total Depth: 1621.20 m
Surface Hole Latitude: 53.401435
Surface Hole Longitude: -113.753982

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1948-06-08 Obtained License
1948-07-24 Drill Stem Test Performed
1948-07-29 Finished Drilling
1948-07-29 Well Mode changed to Drilled and Cased
1948-07-31 Production Casing Operation Performed
1948-08-03 Perforation Treatment Performed - Acid Wash - No Pressure
1948-08-03 Perforation Treatment Performed - Bullet Perforation
1948-08-04 Well Began Production
1948-08-04 Well Fluid changed to Crude Oil
1948-08-04 Well Mode changed to Pumping
1951-10-09 Perforation Treatment Performed - Jet Perforation
1951-10-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-01-08 Well Log Performed
1988-01-13 Well Log Performed
1988-01-15 Well Log Performed
1988-01-19 Well Log Performed
1991-04-04 Well Fluid changed to Crude Oil
1991-04-04 Well Mode changed to Suspended
1996-03-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-03-19 Plug Back Performed
1996-03-19 Well Log Performed
1996-04-15 Well Abandoned
1996-04-15 Well Fluid changed to Crude Oil
1996-04-15 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1948-08-03 Bullet Perforation 1617.60 1619.10 13
1948-08-03 Acid Wash 1617.60 1619.10 0
1951-10-09 Perforation 1592.60 1601.70 13
1951-10-11 Acid Treatment 1591.10 1600.20 0
1996-03-19 Packing Device Capped w/Cement 1592.00 1600.00 0
1996-03-19 Packing Device Capped w/Cement 1232.00 1240.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1972 24 0.0 0.0 0.0
1976 744 0.0 0.0 0.0
1977 7656 0.0 0.0 0.0
1978 8404 0.0 0.0 0.0
1979 8488 0.0 0.0 0.0
1980 8519 0.0 0.0 0.0
1981 8270 0.0 0.0 0.0
1982 5555 0.0 0.0 0.0
1983 8359 0.0 0.0 0.0
1984 8389 0.0 0.0 0.0
1985 7654 0.0 0.0 0.0
1986 7122 0.0 0.0 0.0
1987 6878 0.0 0.0 0.0
1988 7410 0.0 0.0 0.0
1989 8359 0.0 0.0 0.0
1990 8737 0.0 0.0 0.0
1991 2068 0.0 0.0 0.0

For data sources see[5]

References