X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514261511000

Well Details

Well ID: 0514261511000
Loading map...
Location: 00/11-15-051-26W4/0
Location Alias: 00/11-15-51-26 W4M
Location Alias 2: 00/11-15-051-26 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 26
Section: 15
County/Municipality: Parkland County
Well Name: IMPERIAL WOODBEND NO 9
Operator Name: Imperial Oil Resources Limited
License Number: 0004526
License Date: 1952-04-19
License Status: RecCertified
Spud Date: 1952-05-06
Final Drill Date: 1952-06-02
Well Total Depth: 1621.50 m
Surface Hole Latitude: 53.404743
Surface Hole Longitude: -113.752995

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-04-19 Obtained License
1952-05-16 Drill Stem Test Performed
1952-05-17 Drill Stem Test Performed
1952-05-25 Drill Stem Test Performed
1952-05-26 Drill Stem Test Performed
1952-05-30 Liner Casing Operation Performed
1952-06-02 Finished Drilling
1952-06-02 Well Mode changed to Drilled and Cased
1952-06-05 Perforation Treatment Performed - Jet Perforation
1952-06-28 Well Began Production
1952-06-28 Well Fluid changed to Crude Oil
1952-06-28 Well Mode changed to Flowing
1972-04-18 Well Fluid changed to Crude Oil
1972-04-18 Well Mode changed to Pumping
1982-03-01 Perforation Treatment Performed - Cement Squeeze
1982-03-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-03-05 Perforation Treatment Performed - Jet Perforation
1985-02-21 Perforation Treatment Performed - Cement Squeeze
1985-02-25 Perforation Treatment Performed - Jet Perforation
1985-02-25 Well Log Performed
1985-02-26 Perforation Treatment Performed - Acid Wash - No Pressure
1987-07-09 Perforation Treatment Performed - Cement Squeeze
1987-07-10 Well Log Performed
1987-07-13 Perforation Treatment Performed - Jet Perforation
1987-07-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-07-15 Perforation Treatment Performed - Cement Squeeze
1987-07-15 Well Log Performed
1987-07-17 Well Log Performed
1987-07-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-07-20 Perforation Treatment Performed - Jet Perforation
1987-07-20 Well Log Performed
1987-07-22 Perforation Treatment Performed - Chemical Squeeze
1990-09-14 Well Fluid changed to Crude Oil
1990-09-14 Well Mode changed to Suspended
1993-08-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-08-31 Plug Back Performed
1993-08-31 Well Fluid changed to Crude Oil
1993-08-31 Well Log Performed
1993-08-31 Well Mode changed to Abandoned
1993-09-07 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-06-05 Perforation 1617.90 1619.40 13
1987-07-14 Acid Treatment 1614.00 1614.10 0
1987-07-15 Cement Squeeze 1614.00 1614.10 0
1987-07-20 Perforation 1615.80 1616.00 13
1987-07-20 Acid Treatment 1615.80 1616.00 0
1987-07-22 Chemical Squeeze 1615.80 1616.00 0
1993-08-31 Packing Device Capped w/Cement 1572.00 1580.00 0
1993-08-31 Packing Device Capped w/Cement 1267.00 1275.00 0
1982-03-01 Cement Squeeze 1617.90 1619.40 0
1982-03-05 Perforation 1617.40 1617.50 12
1982-03-05 Acid Treatment 1617.40 1617.50 0
1985-02-21 Cement Squeeze 1617.40 1617.50 0
1985-02-25 Perforation 1616.70 1616.80 12
1985-02-26 Acid Wash 1616.70 1616.80 0
1987-07-09 Cement Squeeze 1616.70 1616.80 0
1987-07-13 Perforation 1614.00 1614.10 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7818 0.0 0.0 0.0
1968 8078 0.0 0.0 0.0
1969 8305 0.0 0.0 0.0
1970 4244 0.0 0.0 0.0
1971 3264 0.0 0.0 0.0
1972 6251 0.0 0.0 0.0
1973 8525 0.0 0.0 0.0
1974 8489 0.0 0.0 0.0
1975 8550 0.0 0.0 0.0
1976 8567 0.0 0.0 0.0
1977 7487 0.0 0.0 0.0
1978 8531 0.0 0.0 0.0
1979 6448 0.0 0.0 0.0
1980 3919 0.0 0.0 0.0
1981 528 0.0 0.0 0.0
1982 6839 0.0 0.0 0.0
1983 8321 0.0 0.0 0.0
1984 7780 0.0 0.0 0.0
1985 6765 0.0 0.0 0.0
1986 8224 0.0 0.0 0.0
1987 7090 0.0 0.0 0.0
1988 8418 0.0 0.0 0.0
1989 8000 0.0 0.0 0.0
1990 3779 0.0 0.0 0.0

For data sources see[5]

References