X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514261512000

Well Details

Well ID: 0514261512000
Loading map...
Location: 00/12-15-051-26W4/0
Location Alias: 00/12-15-51-26 W4M
Location Alias 2: 00/12-15-051-26 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 26
Section: 15
County/Municipality: Parkland County
Well Name: IMPERIAL WOODBEND NO. 7
Operator Name: Imperial Oil Resources Limited
License Number: B0002213
License Date: 1948-07-21
License Status: RecCertified
Spud Date: 1948-07-30
Final Drill Date: 1948-09-16
Well Total Depth: 1620.60 m
Surface Hole Latitude: 53.405126
Surface Hole Longitude: -113.759780

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1948-07-21 Obtained License
1948-08-25 Drill Stem Test Performed
1948-09-13 Liner Casing Operation Performed
1948-09-16 Finished Drilling
1948-09-16 Perforation Treatment Performed - Open-Hole Completion
1948-09-16 Well Mode changed to Drilled and Cased
1948-09-19 Well Began Production
1948-09-19 Well Fluid changed to Crude Oil
1948-09-19 Well Mode changed to Flowing
1972-04-20 Well Fluid changed to Crude Oil
1972-04-20 Well Mode changed to Pumping
1981-08-17 Perforation Treatment Performed - Cement Squeeze
1981-08-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-08-20 Perforation Treatment Performed - Jet Perforation
1984-09-13 Perforation Treatment Performed - Cement Squeeze
1984-09-17 Perforation Treatment Performed - Jet Perforation
1984-09-17 Well Log Performed
1984-09-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-11-01 Well Fluid changed to Crude Oil
1990-11-01 Well Mode changed to Suspended
1993-08-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-08-30 Perforation Treatment Performed - Jet Perforation
1993-08-30 Plug Back Performed
1993-08-30 Well Log Performed
1993-08-31 Perforation Treatment Performed - Remedial Casing
1993-08-31 Well Fluid changed to Crude Oil
1993-08-31 Well Mode changed to Abandoned
1993-09-01 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1948-09-16 Open Hole/Barefoot Completion 1616.40 1620.60 0
1993-08-30 Perforation 160.00 160.50 14
1993-08-31 Remedial Casing Cementing 160.00 160.50 0
1981-08-17 Cement Squeeze 1616.40 1620.60 0
1981-08-20 Perforation 1617.20 1617.40 13
1981-08-20 Acid Treatment 1617.20 1617.40 0
1984-09-13 Cement Squeeze 1617.20 1617.40 0
1984-09-17 Perforation 1616.40 1616.50 13
1984-09-18 Acid Treatment 1616.40 1616.50 0
1993-08-30 Packing Device Capped w/Cement 1593.00 1602.00 0
1993-08-30 Packing Device Capped w/Cement 557.00 565.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8368 0.0 0.0 0.0
1968 8150 0.0 0.0 0.0
1969 8353 0.0 0.0 0.0
1970 6548 0.0 0.0 0.0
1971 7295 0.0 0.0 0.0
1972 7957 0.0 0.0 0.0
1973 8573 0.0 0.0 0.0
1974 8427 0.0 0.0 0.0
1975 8558 0.0 0.0 0.0
1976 8591 0.0 0.0 0.0
1977 7564 0.0 0.0 0.0
1978 8531 0.0 0.0 0.0
1979 8248 0.0 0.0 0.0
1980 4164 0.0 0.0 0.0
1981 4016 0.0 0.0 0.0
1982 8567 0.0 0.0 0.0
1983 8287 0.0 0.0 0.0
1984 7874 0.0 0.0 0.0
1985 8144 0.0 0.0 0.0
1986 8413 0.0 0.0 0.0
1987 8533 0.0 0.0 0.0
1988 8592 0.0 0.0 0.0
1989 8170 0.0 0.0 0.0
1990 7278 0.0 0.0 0.0

For data sources see[5]

References