If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0514261603000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.39792,"lon":-113.777435,"icon":""}]} |
Location: 00/03-16-051-26W4/0 | |
Location Alias: 00/03-16-51-26 W4M | |
Location Alias 2: 00/03-16-051-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 051 | |
Meridian: 4 | |
Range: 26 | |
Section: 16 | |
County/Municipality: Parkland County | |
Well Name: MEC LEDUC-WB 3-16-51-26 | |
Operator Name: NEP Canada ULC | |
License Number: B0002373 | |
License Date: 1948-09-28 | |
License Status: Abandoned | |
Spud Date: 1948-10-12 | |
Final Drill Date: 1948-12-07 | |
Well Total Depth: 1619.10 m | |
Surface Hole Latitude: 53.397920 | |
Surface Hole Longitude: -113.777435 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1948-09-28 | Obtained License |
1948-11-01 | Drill Stem Test Performed |
1948-11-03 | Drill Stem Test Performed |
1948-11-04 | Drill Stem Test Performed |
1948-11-14 | Drill Stem Test Performed |
1948-11-27 | Drill Stem Test Performed |
1948-12-07 | Finished Drilling |
1948-12-07 | Well Mode changed to Drilled and Cased |
1948-12-15 | Production Casing Operation Performed |
1948-12-21 | Perforation Treatment Performed - Bullet Perforation |
1948-12-26 | Well Began Production |
1948-12-26 | Well Fluid changed to Crude Oil |
1948-12-26 | Well Mode changed to Flowing |
1973-09-11 | Perforation Treatment Performed - Cement Squeeze |
1973-09-13 | Perforation Treatment Performed - Jet Perforation |
1973-09-14 | Perforation Treatment Performed - Acid Wash - No Pressure |
1975-04-22 | Well Fluid changed to Crude Oil |
1975-04-22 | Well Mode changed to Pumping |
1982-08-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-09-01 | Perforation Treatment Performed - Cement Squeeze |
1982-09-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-09-03 | Perforation Treatment Performed - Jet Perforation |
1985-01-22 | Perforation Treatment Performed - Cement Squeeze |
1985-01-23 | Well Log Performed |
1985-01-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1985-01-24 | Perforation Treatment Performed - Jet Perforation |
1985-10-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1985-10-04 | Perforation Treatment Performed - Jet Perforation |
1987-11-25 | Well Log Performed |
1987-11-28 | Perforation Treatment Performed - Cement Squeeze |
1987-12-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-12-01 | Perforation Treatment Performed - Jet Perforation |
1987-12-01 | Well Log Performed |
1987-12-03 | Perforation Treatment Performed - Cement Squeeze |
1987-12-03 | Well Log Performed |
1987-12-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-12-04 | Perforation Treatment Performed - Jet Perforation |
1987-12-04 | Well Log Performed |
1987-12-08 | Well Log Performed |
1987-12-09 | Perforation Treatment Performed - Cement Squeeze |
1987-12-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-12-14 | Perforation Treatment Performed - Jet Perforation |
1987-12-14 | Well Log Performed |
2000-10-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-10-03 | Plug Back Performed |
2000-10-03 | Well Log Performed |
2000-10-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-10-04 | Perforation Treatment Performed - Jet Perforation |
2000-10-04 | Plug Back Performed |
2000-10-04 | Well Fluid changed to Crude Oil |
2000-10-04 | Well Log Performed |
2000-10-04 | Well Mode changed to Abandoned Zone |
2011-03-10 | Perforation Treatment Performed - Cement Squeeze |
2011-03-28 | Perforation Treatment Performed - Jet Perforation |
2011-03-30 | Perforation Treatment Performed - Cement Squeeze |
2011-04-01 | Perforation Treatment Performed - Jet Perforation |
2011-04-03 | Perforation Treatment Performed - Cement Squeeze |
2011-04-05 | Perforation Treatment Performed - Jet Perforation |
2011-04-06 | Perforation Treatment Performed - Cement Squeeze |
2011-04-13 | Well Log Performed |
2011-04-26 | Well Log Performed |
2011-04-27 | Well Log Performed |
2011-05-03 | Well Log Performed |
2011-05-13 | Perforation Treatment Performed - Jet Perforation |
2011-05-14 | Perforation Treatment Performed - Cement Squeeze |
2018-08-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-08-27 | Plug Back Performed |
2018-08-27 | Well Log Performed |
2018-08-28 | Perforation Treatment Performed - Cement Plug |
2018-08-28 | Perforation Treatment Performed - Cement Squeeze |
2018-08-28 | Perforation Treatment Performed - Jet Perforation |
2018-08-28 | Plug Back Performed |
2018-08-28 | Well Log Performed |
2018-08-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-08-29 | Plug Back Performed |
2018-09-04 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1948-12-21 | Bullet Perforation | 1615.40 | 1617.00 | 20 |
1985-01-22 | Cement Squeeze | 1615.80 | 1615.90 | 0 |
1985-01-24 | Perforation | 1614.80 | 1614.90 | 10 |
1985-01-24 | Acid Treatment | 1614.80 | 1614.90 | 0 |
1985-10-04 | Perforation | 1614.50 | 1614.60 | 7 |
1985-10-04 | Acid Treatment | 1614.50 | 1614.90 | 0 |
1987-11-28 | Cement Squeeze | 1614.50 | 1614.90 | 0 |
1987-12-01 | Perforation | 1613.80 | 1614.00 | 13 |
1987-12-01 | Acid Treatment | 1613.80 | 1614.00 | 0 |
1987-12-03 | Cement Squeeze | 1613.80 | 1614.00 | 0 |
1987-12-04 | Perforation | 1606.00 | 1606.50 | 13 |
1973-09-11 | Cement Squeeze | 1615.40 | 1617.00 | 0 |
1987-12-04 | Perforation | 1607.40 | 1607.80 | 13 |
1987-12-04 | Perforation | 1608.50 | 1609.20 | 13 |
1987-12-04 | Acid Treatment | 1606.00 | 1609.20 | 0 |
1987-12-09 | Cement Squeeze | 1606.00 | 1609.20 | 0 |
1987-12-14 | Perforation | 1613.00 | 1613.50 | 13 |
1987-12-14 | Acid Treatment | 1613.00 | 1613.50 | 0 |
2000-10-03 | Packing Device Capped w/Cement | 1589.80 | 1590.80 | 0 |
2000-10-04 | Packing Device Capped w/Cement | 1297.80 | 1298.80 | 0 |
2000-10-04 | Perforation | 1282.30 | 1288.70 | 17 |
2011-03-10 | Cement Squeeze | 1282.30 | 1288.70 | 0 |
1973-09-13 | Perforation | 1616.00 | 1616.40 | 3 |
2011-03-28 | Perforation | 1281.00 | 1283.00 | 34 |
2011-03-30 | Cement Squeeze | 1281.00 | 1283.00 | 0 |
2011-04-01 | Perforation | 1074.00 | 1076.00 | 35 |
2011-04-03 | Cement Squeeze | 1074.00 | 1076.00 | 0 |
2011-04-05 | Perforation | 322.00 | 325.00 | 13 |
2011-04-06 | Cement Squeeze | 322.00 | 325.00 | 0 |
2011-05-13 | Perforation | 183.00 | 185.00 | 40 |
2011-05-13 | Perforation | 183.00 | 185.00 | 34 |
2011-05-14 | Cement Squeeze | 183.00 | 185.00 | 0 |
2018-08-27 | Packing Device Capped w/Cement | 1218.80 | 1326.20 | 0 |
1973-09-13 | Perforation | 1616.40 | 1616.70 | 13 |
2018-08-28 | Perforation | 1095.00 | 1096.00 | 13 |
2018-08-28 | Cement Squeeze | 1095.00 | 1096.00 | 0 |
2018-08-28 | Perforation | 1074.00 | 1076.00 | 13 |
2018-08-28 | Cement Squeeze | 1074.00 | 1076.00 | 0 |
2018-08-28 | Cement Plug | 1030.00 | 1112.00 | 0 |
2018-08-29 | Packing Device Capped w/Cement | 563.00 | 571.00 | 0 |
2018-08-29 | Packing Device Capped w/Cement | 309.00 | 317.00 | 0 |
2018-08-29 | Packing Device Capped w/Cement | 167.20 | 175.20 | 0 |
1973-09-14 | Acid Wash | 1616.00 | 1616.70 | 0 |
1982-08-30 | Acid Treatment | 1616.00 | 1616.70 | 0 |
1982-09-01 | Cement Squeeze | 1616.00 | 1616.70 | 0 |
1982-09-03 | Perforation | 1615.80 | 1615.90 | 10 |
1982-09-03 | Acid Treatment | 1615.80 | 1615.90 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1972 | 72 | 0.0 | 0.0 | 0.0 |
1973 | 2488 | 0.0 | 0.0 | 0.0 |
1974 | 8449 | 0.0 | 0.0 | 0.0 |
1975 | 6781 | 0.0 | 0.0 | 0.0 |
1976 | 8472 | 0.0 | 0.0 | 0.0 |
1977 | 7972 | 0.0 | 0.0 | 0.0 |
1978 | 7863 | 0.0 | 0.0 | 0.0 |
1979 | 6855 | 0.0 | 0.0 | 0.0 |
1980 | 7699 | 0.0 | 0.0 | 0.0 |
1981 | 8560 | 0.0 | 0.0 | 0.0 |
1982 | 6529 | 0.0 | 0.0 | 0.0 |
1983 | 8547 | 0.0 | 0.0 | 0.0 |
1984 | 8380 | 0.0 | 0.0 | 0.0 |
1985 | 6127 | 0.0 | 0.0 | 0.0 |
1986 | 7926 | 0.0 | 0.0 | 0.0 |
1987 | 7505 | 0.0 | 0.0 | 0.0 |
1990 | 5062 | 0.0 | 0.0 | 0.0 |
1991 | 8472 | 0.0 | 0.0 | 0.0 |
1992 | 974 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-08-25 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]