X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514261606020

Well Details

Well ID: 0514261606020
Loading map...
Location: 02/06-16-051-26W4/0
Location Alias: 02/06-16-51-26 W4M
Location Alias 2: 02/06-16-051-26 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 26
Section: 16
County/Municipality: Parkland County
Well Name: IMP UD2W 110 WD LEDUC IN 6-16-51-26
Operator Name: Imperial Oil Limited
License Number: 0007096
License Date: 1953-09-24
License Status: RecExempt
Spud Date: 1953-11-08
Final Drill Date: 1954-01-26
Well Total Depth: 1543.50 m
Surface Hole Latitude: 53.401753
Surface Hole Longitude: -113.778785

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-09-24 Obtained License
1953-11-24 Drill Stem Test Performed
1953-11-25 Drill Stem Test Performed
1953-11-26 Liner Casing Operation Performed
1954-01-26 Finished Drilling
1954-01-26 Perforation Treatment Performed - Open-Hole Completion
1954-01-26 Well Mode changed to Drilled and Cased
1954-01-28 Well Began Production
1954-01-28 Well Fluid changed to Crude Oil
1954-01-28 Well Mode changed to Flowing
1957-12-17 Well Fluid changed to Crude Oil
1957-12-17 Well Mode changed to Pumping
1962-10-29 Perforation Treatment Performed - Open-Hole Completion
1962-10-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-10-31 Perforation Treatment Performed - Fractured
1963-01-24 Well Began Injection
1963-01-24 Well Fluid changed to Water
1963-01-24 Well Type changed to Injection
1963-04-17 Perforation Treatment Performed - Cement Squeeze
1963-04-18 Perforation Treatment Performed - Open-Hole Completion
1963-07-03 Perforation Treatment Performed - Bullet Perforation
1963-07-05 Perforation Treatment Performed - Cement Squeeze
1963-07-08 Perforation Treatment Performed - Open-Hole Completion
1963-07-12 Perforation Treatment Performed - Acid Wash - No Pressure
1963-07-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-07-07 Perforation Treatment Performed - Cement Squeeze
1964-07-08 Well Fluid changed to Water
1964-07-08 Well Mode changed to Suspended
1964-07-08 Well Type changed to Injection
1965-08-27 Perforation Treatment Performed - Cement Plug
1965-08-30 Well Abandoned
1965-08-30 Well Fluid changed to Water
1965-08-30 Well Mode changed to Abandoned
1965-08-30 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-01-26 Open Hole/Barefoot Completion 1522.20 1529.50 0
1963-07-12 Acid Wash 1536.20 1543.50 0
1963-07-18 Acid Treatment 1536.20 1543.50 0
1964-07-07 Cement Squeeze 1536.20 1543.50 0
1965-08-27 Cement Plug 929.00 964.10 0
1962-10-29 Open Hole/Barefoot Completion 1535.90 1543.50 0
1962-10-31 Fracture 1536.20 1543.50 0
1962-10-31 Acid Treatment 1536.20 1543.50 0
1963-04-17 Cement Squeeze 1536.20 1543.50 0
1963-04-18 Open Hole/Barefoot Completion 1536.20 1543.50 0
1963-07-03 Bullet Perforation 1530.10 1530.40 0
1963-07-05 Cement Squeeze 1493.50 1543.50 0
1963-07-08 Open Hole/Barefoot Completion 1535.90 1543.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0

For data sources see[5]

References