X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514262205000

Well Details

Well ID: 0514262205000
Loading map...
Location: 00/05-22-051-26W4/0
Location Alias: 00/05-22-51-26 W4M
Location Alias 2: 00/05-22-051-26 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 26
Section: 22
County/Municipality: Parkland County
Well Name: IMPERIAL WOODBEND NO. 86
Operator Name: Imperial Oil Resources Limited
License Number: 0003681
License Date: 1951-10-26
License Status: RecCertified
Spud Date: 1951-11-28
Final Drill Date: 1951-12-25
Well Total Depth: 1620.00 m
Surface Hole Latitude: 53.415979
Surface Hole Longitude: -113.759700

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-10-26 Obtained License
1951-12-10 Drill Stem Test Performed
1951-12-17 Drill Stem Test Performed
1951-12-21 Liner Casing Operation Performed
1951-12-25 Finished Drilling
1951-12-25 Well Mode changed to Drilled and Cased
1951-12-28 Perforation Treatment Performed - Acid Wash - No Pressure
1951-12-28 Perforation Treatment Performed - Jet Perforation
1952-01-17 Well Began Production
1952-01-17 Well Fluid changed to Crude Oil
1952-01-17 Well Mode changed to Flowing
1973-12-21 Well Fluid changed to Crude Oil
1973-12-21 Well Mode changed to Pumping
1981-11-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-11-18 Perforation Treatment Performed - Cement Squeeze
1981-11-23 Perforation Treatment Performed - Jet Perforation
1981-11-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-08-04 Well Fluid changed to Crude Oil
1986-08-04 Well Mode changed to Suspended
1996-09-09 Well Log Performed
1996-09-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-09-10 Perforation Treatment Performed - Jet Perforation
1996-09-10 Plug Back Performed
1997-04-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-04-24 Perforation Treatment Performed - Remedial Casing
1997-05-06 Well Abandoned
1997-05-06 Well Fluid changed to Crude Oil
1997-05-06 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-12-28 Perforation 1616.40 1617.90 13
1997-04-24 Remedial Casing Cementing 160.00 161.00 0
1997-04-24 Packing Device Capped w/Cement 116.70 165.00 0
1951-12-28 Acid Wash 1616.40 1617.90 0
1981-11-10 Acid Treatment 1616.40 1617.90 0
1981-11-18 Cement Squeeze 1616.40 1617.90 0
1981-11-23 Perforation 1616.00 1616.20 10
1981-11-24 Acid Treatment 1616.00 1616.20 0
1996-09-10 Packing Device Capped w/Cement 1597.00 1605.00 0
1996-09-10 Packing Device Capped w/Cement 1233.00 1241.00 0
1996-09-10 Perforation 160.00 161.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7610 0.0 0.0 0.0
1968 8261 0.0 0.0 0.0
1969 4367 0.0 0.0 0.0
1970 7040 0.0 0.0 0.0
1971 8303 0.0 0.0 0.0
1972 8126 0.0 0.0 0.0
1973 8292 0.0 0.0 0.0
1974 8431 0.0 0.0 0.0
1975 8573 0.0 0.0 0.0
1976 7792 0.0 0.0 0.0
1977 5253 0.0 0.0 0.0
1978 7944 0.0 0.0 0.0
1979 7575 0.0 0.0 0.0
1980 8064 0.0 0.0 0.0
1981 7982 0.0 0.0 0.0
1982 3420 0.0 0.0 0.0
1983 7839 0.0 0.0 0.0
1984 6747 0.0 0.0 0.0
1985 7435 0.0 0.0 0.0
1986 4593 0.0 0.0 0.0

For data sources see[5]

References