X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514262806002

Well Details

Well ID: 0514262806002
Loading map...
Location: 00/06-28-051-26W4/2
Location Alias: 00/06-28-51-26 W4M
Location Alias 2: 00/06-28-051-26 W4/02
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 26
Section: 28
County/Municipality: Parkland County
Well Name: NORTH WOODBEND NO. 3-2
Operator Name: Imperial Oil Resources Limited
License Number: 0001698
License Date: 1950-07-03
License Status: Abandoned
Spud Date: 1950-07-08
Final Drill Date: 1950-08-25
Well Total Depth: 1629.20 m
Surface Hole Latitude: 53.430674
Surface Hole Longitude: -113.778089

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-07-03 Obtained License
1950-07-17 Drill Stem Test Performed
1950-07-20 Drill Stem Test Performed
1950-07-25 Drill Stem Test Performed
1950-07-26 Drill Stem Test Performed
1950-07-27 Drill Stem Test Performed
1950-07-28 Drill Stem Test Performed
1950-07-30 Drill Stem Test Performed
1950-07-31 Drill Stem Test Performed
1950-08-02 Drill Stem Test Performed
1950-08-03 Drill Stem Test Performed
1950-08-07 Drill Stem Test Performed
1950-08-08 Drill Stem Test Performed
1950-08-10 Drill Stem Test Performed
1950-08-15 Drill Stem Test Performed
1950-08-17 Drill Stem Test Performed
1950-08-19 Production Casing Operation Performed
1950-08-25 Drill Stem Test Performed
1950-08-25 Finished Drilling
1950-08-28 Perforation Treatment Performed - Bullet Perforation
1960-11-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1960-11-24 Perforation Treatment Performed - Jet Perforation
1960-11-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-12-09 Well Mode changed to Drilled and Cased
1961-10-27 Well Began Production
1961-10-27 Well Fluid changed to Gas
1961-10-27 Well Mode changed to Flowing
1971-08-27 Perforation Treatment Performed - Cement Squeeze
1983-07-05 Well Fluid changed to Gas
1983-07-05 Well Mode changed to Suspended
1995-04-12 Well Fluid changed to Gas
1995-04-12 Well Mode changed to Flowing
1996-09-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-09-27 Plug Back Performed
1996-09-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-09-28 Perforation Treatment Performed - Jet Perforation
1996-10-01 Well Fluid changed to Gas
1996-10-01 Well Mode changed to Suspended
1997-04-25 Perforation Treatment Performed - Remedial Casing
1997-05-06 Well Abandoned
1997-05-06 Well Fluid changed to Gas
1997-05-06 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-08-28 Bullet Perforation 1496.60 1501.10 13
1996-09-28 Packing Device Capped w/Cement 300.00 482.00 0
1996-09-28 Perforation 160.00 161.00 13
1997-04-25 Remedial Casing Cementing 160.00 161.00 0
1950-08-28 Bullet Perforation 1484.70 1492.00 13
1960-11-23 Packing Device Capped w/Cement 1452.10 1463.00 0
1960-11-24 Perforation 1291.70 1295.40 7
1960-11-24 Perforation 1285.00 1287.50 7
1960-11-24 Perforation 1282.60 1283.80 7
1960-11-25 Acid Treatment 1282.60 1295.40 0
1971-08-27 Cement Squeeze 1285.00 1295.40 0
1996-09-27 Packing Device Capped w/Cement 1260.00 1268.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1995 5290 0.0 0.0 0.0
1996 6575 0.0 0.0 0.0

For data sources see[5]

References