X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514272311030

Well Details

Well ID: 0514272311030
Loading map...
Location: 03/11-23-051-27W4/0
Location Alias: 03/11-23-51-27 W4M
Location Alias 2: 03/11-23-051-27 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 27
Section: 23
County/Municipality: Parkland County
Well Name: FREE REIN 103 GSPIKE 11-23-51-27
Operator Name: Free Rein Resources Ltd.
License Number: 0007453
License Date: 1953-12-10
License Status: Abandoned
Spud Date: 1954-01-09
Final Drill Date: 1954-02-02
Well Total Depth: 1436.80 m
Surface Hole Latitude: 53.419084
Surface Hole Longitude: -113.876025

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-12-10 Obtained License
1954-01-26 Drill Stem Test Performed
1954-01-28 Drill Stem Test Performed
1954-01-31 Drill Stem Test Performed
1954-02-02 Finished Drilling
1954-02-02 Well Mode changed to Drilled and Cased
1954-02-03 Drill Stem Test Performed
1954-02-04 Drill Stem Test Performed
1954-02-05 Drill Stem Test Performed
1954-02-07 Drill Stem Test Performed
1954-02-08 Production Casing Operation Performed
1954-03-08 Drill Stem Test Performed
1954-03-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-03-10 Perforation Treatment Performed - Jet Perforation
1954-03-18 Perforation Treatment Performed - Jet Perforation
1954-03-19 Perforation Treatment Performed - Acid Wash - No Pressure
1954-03-22 Perforation Treatment Performed - Cement Squeeze
1954-03-24 Perforation Treatment Performed - Jet Perforation
1954-03-26 Perforation Treatment Performed - Cement Squeeze
1954-03-31 Perforation Treatment Performed - Jet Perforation
1954-07-06 Perforation Treatment Performed - Jet Perforation
1954-10-22 Perforation Treatment Performed - Cement Squeeze
1954-10-26 Perforation Treatment Performed - Bullet Perforation
1954-11-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-11-09 Well Began Production
1954-11-09 Well Fluid changed to Gas
1954-11-09 Well Mode changed to Flowing
1959-06-04 Well Fluid changed to Gas
1959-06-04 Well Mode changed to Suspended
1960-05-25 Well Fluid changed to Gas
1960-05-25 Well Mode changed to Flowing
1971-07-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-01-30 Well Fluid changed to Gas
1973-01-30 Well Mode changed to Suspended
1979-11-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-11-05 Plug Back Performed
1998-11-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-11-12 Perforation Treatment Performed - Jet Perforation
1998-11-12 Perforation Treatment Performed - Remedial Casing
1998-11-12 Plug Back Performed
1998-11-12 Well Log Performed
1998-12-07 Well Abandoned
1998-12-07 Well Fluid changed to Gas
1998-12-07 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-03-10 Perforation 1414.00 1415.80 13
1954-10-22 Cement Squeeze 1407.60 1417.30 0
1954-10-26 Bullet Perforation 1392.90 1400.60 13
1954-10-26 Bullet Perforation 1372.50 1380.70 13
1954-10-26 Bullet Perforation 1364.00 1367.00 13
1954-10-26 Bullet Perforation 1353.90 1360.90 13
1954-11-05 Acid Treatment 1353.90 1386.80 0
1971-07-19 Acid Treatment 1414.00 1415.80 0
1979-11-05 Packing Device Capped w/Cement 1388.70 1389.90 0
1998-11-12 Packing Device Capped w/Cement 1335.00 1343.00 0
1998-11-12 Perforation 160.00 161.00 13
1954-03-10 Acid Treatment 1414.00 1415.80 0
1998-11-12 Remedial Casing Cementing 160.00 161.00 0
1998-11-12 Packing Device Capped w/Cement 110.00 175.00 0
1954-03-18 Perforation 1421.90 1423.70 13
1954-03-19 Acid Wash 1421.90 1423.70 0
1954-03-22 Cement Squeeze 1421.90 1423.70 0
1954-03-24 Perforation 1417.60 1419.50 13
1954-03-26 Cement Squeeze 1417.60 1419.50 0
1954-03-31 Perforation 1415.80 1417.30 13
1954-07-06 Perforation 1407.60 1411.20 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1440 0.0 0.0 0.0
1969 7634 0.0 0.0 0.0
1970 6487 0.0 0.0 0.0
1971 4464 0.0 0.0 0.0
1977 0 0.0 0.0 0.0

For data sources see[5]

References