X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514272604C00

Well Details

Well ID: 0514272604C00
Loading map...
Location: C0/04-26-051-27W4/0
Location Alias: C0/04-26-51-27 W4M
Location Alias 2: C0/04-26-051-27 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 27
Section: 26
County/Municipality: Parkland County
Well Name: ESSO GOLDEN SPIKE 4C-26-51-27
Operator Name: Imperial Oil Resources Limited
License Number: 0074006
License Date: 1979-01-18
License Status: Abandoned
Spud Date: 1979-08-17
Final Drill Date: 1979-09-05
Well Total Depth: 1819.00 m
Surface Hole Latitude: 53.427865
Surface Hole Longitude: -113.884004

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-01-18 Obtained License
1979-09-05 Finished Drilling
1979-09-05 Well Log Performed
1979-09-05 Well Mode changed to Drilled and Cased
1979-09-06 Liner Casing Operation Performed
1979-09-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-09-19 Perforation Treatment Performed - Jet Perforation
1979-09-27 Well Began Production
1979-09-27 Well Fluid changed to Crude Oil
1979-09-27 Well Mode changed to Gas Lift
1987-01-06 Perforation Treatment Performed - Jet Perforation
1987-01-06 Well Log Performed
1987-01-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-01-07 Perforation Treatment Performed - Chemical Squeeze
1995-03-28 Perforation Treatment Performed - Jet Perforation
1995-03-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-08-01 Well Fluid changed to Crude Oil
2003-08-01 Well Mode changed to Suspended
2009-09-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-09-21 Plug Back Performed
2009-09-21 Well Fluid changed to Crude Oil
2009-09-21 Well Log Performed
2009-09-21 Well Mode changed to Abandoned Zone
2009-09-22 Perforation Treatment Performed - Jet Perforation
2009-09-22 Perforation Treatment Performed - Remedial Casing
2009-09-22 Well Log Performed
2009-09-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-09-23 Perforation Treatment Performed - Jet Perforation
2009-09-23 Perforation Treatment Performed - Remedial Casing
2009-09-23 Well Log Performed
2009-09-24 Perforation Treatment Performed - Jet Perforation
2009-09-24 Well Log Performed
2009-10-01 Perforation Treatment Performed - Cement Plug
2009-10-01 Perforation Treatment Performed - Remedial Casing
2009-10-02 Perforation Treatment Performed - Jet Perforation
2009-10-02 Well Log Performed
2009-10-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-10-03 Perforation Treatment Performed - Remedial Casing
2009-10-25 Perforation Treatment Performed - Jet Perforation
2009-10-25 Well Log Performed
2009-10-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-10-26 Perforation Treatment Performed - Remedial Casing
2011-07-08 Well Abandoned
2011-07-08 Well Fluid changed to Crude Oil
2011-07-08 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-09-19 Perforation 1793.00 1799.00 6
2009-09-22 Remedial Casing Cementing 530.00 531.00 0
2009-09-23 Packing Device Capped w/Cement 480.00 525.00 0
2009-09-23 Perforation 479.00 480.00 17
2009-09-23 Remedial Casing Cementing 479.00 480.00 0
2009-09-23 Packing Device Capped w/Cement 460.00 475.00 0
2009-09-24 Perforation 352.00 353.00 17
2009-09-24 Perforation 249.00 250.00 17
2009-10-01 Remedial Casing Cementing 249.00 250.00 0
2009-10-01 Cement Plug 247.50 357.00 0
2009-10-02 Perforation 225.00 226.00 17
1979-09-19 Acid Treatment 1793.00 1799.00 0
2009-10-03 Remedial Casing Cementing 225.00 226.00 0
2009-10-03 Packing Device Capped w/Cement 225.00 247.00 0
2009-10-03 Packing Device Capped w/Cement 207.00 220.00 0
2009-10-25 Perforation 191.00 193.00 17
2009-10-26 Remedial Casing Cementing 191.00 193.00 0
2009-10-26 Packing Device Capped w/Cement 178.50 188.00 0
1987-01-06 Perforation 1801.00 1805.00 13
1987-01-07 Chemical Squeeze 1793.00 1799.00 0
1987-01-07 Acid Treatment 1801.00 1805.00 0
1995-03-28 Perforation 1720.00 1720.30 13
1995-03-30 Acid Treatment 1720.00 1720.30 0
2009-09-21 Packing Device Capped w/Cement 1222.00 1707.00 0
2009-09-22 Perforation 530.00 531.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 1193 0.0 0.0 0.0
1980 2051 0.0 0.0 0.0
1981 5479 0.0 0.0 0.0
1982 8198 0.0 0.0 0.0
1983 4721 0.0 0.0 0.0
1984 8131 0.0 0.0 0.0
1985 5871 0.0 0.0 0.0
1986 4307 0.0 0.0 0.0
1987 8123 0.0 0.0 0.0
1988 6032 0.0 0.0 0.0
1989 830 0.0 0.0 0.0
1990 6716 0.0 0.0 0.0
1991 5258 0.0 0.0 0.0
1992 348 0.0 0.0 0.0
1993 2243 0.0 0.0 0.0
1994 858 0.0 0.0 0.0
1995 597 0.0 0.0 0.0
1996 21 0.0 0.0 0.0
1997 1532 0.0 0.0 0.0
1998 214 0.0 0.0 0.0
1999 120 0.0 0.0 0.0
2000 1419 0.0 0.0 0.0
2002 4192 0.0 0.0 0.0

For data sources see[5]

References