X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514272708020

Well Details

Well ID: 0514272708020
Loading map...
Location: 02/08-27-051-27W4/0
Location Alias: 02/08-27-51-27 W4M
Location Alias 2: 02/08-27-051-27 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 27
Section: 27
County/Municipality: Parkland County
Well Name: IMPERIAL GOLDEN SPIKE IN 8-27L-51-27
Operator Name: Imperial Oil Resources Limited
License Number: 0026908
License Date: 1964-10-01
License Status: Abandoned
Spud Date: 1964-10-14
Final Drill Date: 1964-10-30
Well Total Depth: 1828.80 m
Surface Hole Latitude: 53.431810
Surface Hole Longitude: -113.891351

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-10-01 Obtained License
1964-10-18 Drill Stem Test Performed
1964-10-20 Drill Stem Test Performed
1964-10-22 Drill Stem Test Performed
1964-10-23 Drill Stem Test Performed
1964-10-30 Finished Drilling
1964-10-31 Production Casing Operation Performed
1965-03-25 Well Mode changed to Drilled and Cased
1965-05-04 Perforation Treatment Performed - Jet Perforation
1965-05-05 Perforation Treatment Performed - Acid Wash - No Pressure
1965-06-14 Well Fluid changed to Liquid Petroleum Gas
1965-06-14 Well Type changed to Storage
1967-06-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-10-16 Perforation Treatment Performed - Jet Perforation
1968-10-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-09-22 Perforation Treatment Performed - Cement Squeeze
1971-09-24 Perforation Treatment Performed - Cement Squeeze
1971-09-29 Perforation Treatment Performed - Cement Squeeze
1971-10-02 Perforation Treatment Performed - Cement Squeeze
1971-10-08 Perforation Treatment Performed - Acid Wash - No Pressure
1971-10-08 Perforation Treatment Performed - Jet Perforation
1974-05-03 Perforation Treatment Performed - Cement Squeeze
1974-05-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-05-08 Perforation Treatment Performed - Jet Perforation
1982-04-01 Well Fluid changed to Liquid Petroleum Gas
1982-04-01 Well Mode changed to Suspended
1982-04-01 Well Type changed to Storage
1987-09-03 Perforation Treatment Performed - Jet Perforation
1987-09-03 Well Log Performed
1987-09-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-07-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-07-23 Plug Back Performed
2009-07-23 Well Fluid changed to Liquid Petroleum Gas
2009-07-23 Well Mode changed to Abandoned Zone
2009-07-23 Well Type changed to Storage
2009-07-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-07-26 Perforation Treatment Performed - Jet Perforation
2009-07-26 Well Log Performed
2009-07-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-07-27 Perforation Treatment Performed - Remedial Casing
2009-07-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-07-28 Perforation Treatment Performed - Jet Perforation
2009-07-28 Perforation Treatment Performed - Remedial Casing
2009-07-28 Well Log Performed
2009-07-29 Perforation Treatment Performed - Jet Perforation
2009-07-29 Perforation Treatment Performed - Remedial Casing
2009-07-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-07-31 Well Log Performed
2009-10-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-07-05 Well Abandoned
2011-07-05 Well Fluid changed to Liquid Petroleum Gas
2011-07-05 Well Mode changed to Abandoned
2011-07-05 Well Type changed to Storage

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-05-04 Perforation 1656.30 1658.10 3
1971-09-29 Cement Squeeze 1656.30 1677.90 0
1971-10-02 Cement Squeeze 1656.30 1737.40 0
1971-10-08 Perforation 1692.60 1695.60 3
1971-10-08 Perforation 1698.70 1701.40 3
1971-10-08 Acid Wash 1692.60 1701.40 0
1974-05-03 Cement Squeeze 1692.60 1701.40 0
1974-05-08 Perforation 1711.80 1719.10 3
1974-05-08 Acid Treatment 1711.80 1719.10 0
1987-09-03 Perforation 1541.70 1543.60 13
1987-09-03 Perforation 1543.60 1550.00 13
1965-05-04 Perforation 1659.30 1660.20 0
1987-09-08 Acid Treatment 1541.70 1550.00 0
2009-07-23 Packing Device Capped w/Cement 1583.00 1645.00 0
2009-07-25 Packing Device Capped w/Cement 1253.00 1530.00 0
2009-07-26 Perforation 686.00 687.00 17
2009-07-27 Remedial Casing Cementing 686.00 687.00 0
2009-07-27 Packing Device Capped w/Cement 666.00 676.00 0
2009-07-28 Perforation 584.00 585.00 17
2009-07-28 Remedial Casing Cementing 584.00 585.00 0
2009-07-28 Packing Device Capped w/Cement 560.00 570.00 0
2009-07-29 Perforation 399.00 400.00 17
1965-05-05 Acid Wash 1656.30 1660.20 0
2009-07-29 Perforation 350.00 351.00 17
2009-07-29 Perforation 320.00 321.00 17
2009-07-29 Remedial Casing Cementing 399.00 400.00 0
2009-07-29 Remedial Casing Cementing 350.00 351.00 0
2009-07-30 Packing Device Capped w/Cement 322.00 406.00 0
2009-10-14 Packing Device Capped w/Cement 310.00 318.00 0
1967-06-30 Acid Treatment 1656.30 1660.20 0
1968-10-16 Perforation 1668.80 1671.80 3
1968-10-16 Perforation 1674.90 1677.90 3
1968-10-21 Acid Treatment 1668.80 1677.90 0
1971-09-22 Cement Squeeze 1656.30 1677.90 0
1971-09-24 Cement Squeeze 1656.30 1677.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0

For data sources see[5]

References