If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0514272710000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.433804,"lon":-113.894612,"icon":""}]} |
Location: 00/10-27-051-27W4/0 | |
Location Alias: 00/10-27-51-27 W4M | |
Location Alias 2: 00/10-27-051-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 051 | |
Meridian: 4 | |
Range: 27 | |
Section: 27 | |
County/Municipality: Parkland County | |
Well Name: IMPERIAL GOLDEN SPIKE #23 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: 0006777 | |
License Date: 1953-07-20 | |
License Status: Abandoned | |
Spud Date: 1953-10-18 | |
Final Drill Date: 1953-12-08 | |
Well Total Depth: 1818.40 m | |
Surface Hole Latitude: 53.433804 | |
Surface Hole Longitude: -113.894612 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1953-07-20 | Obtained License |
1953-10-25 | Drill Stem Test Performed |
1953-10-26 | Drill Stem Test Performed |
1953-11-02 | Drill Stem Test Performed |
1953-11-03 | Drill Stem Test Performed |
1953-11-06 | Drill Stem Test Performed |
1953-11-08 | Drill Stem Test Performed |
1953-11-09 | Drill Stem Test Performed |
1953-11-12 | Drill Stem Test Performed |
1953-11-15 | Drill Stem Test Performed |
1953-11-16 | Drill Stem Test Performed |
1953-11-21 | Drill Stem Test Performed |
1953-11-23 | Drill Stem Test Performed |
1953-11-24 | Drill Stem Test Performed |
1953-11-25 | Drill Stem Test Performed |
1953-11-26 | Drill Stem Test Performed |
1953-11-28 | Drill Stem Test Performed |
1953-11-29 | Drill Stem Test Performed |
1953-12-08 | Finished Drilling |
1953-12-09 | Liner Casing Operation Performed |
1953-12-11 | Well Mode changed to Drilled and Cased |
1958-08-20 | Perforation Treatment Performed - Open-Hole Completion |
1958-09-16 | Well Began Production |
1958-09-16 | Well Fluid changed to Crude Oil |
1958-09-16 | Well Mode changed to Flowing |
1964-09-09 | Perforation Treatment Performed - Open-Hole Completion |
1964-09-23 | Perforation Treatment Performed - Open-Hole Completion |
1964-09-28 | Perforation Treatment Performed - Acid Wash - No Pressure |
1964-09-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1964-09-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1964-10-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1964-10-06 | Perforation Treatment Performed - Open-Hole Completion |
1965-11-30 | Perforation Treatment Performed - Acid Wash - No Pressure |
1965-12-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1967-09-26 | Well Log Performed |
1970-05-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1970-06-01 | Perforation Treatment Performed - Open-Hole Completion |
1970-10-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1974-03-11 | Perforation Treatment Performed - Cement Squeeze |
1974-03-26 | Perforation Treatment Performed - Jet Perforation |
1980-06-02 | Perforation Treatment Performed - Cement Squeeze |
1980-06-09 | Perforation Treatment Performed - Jet Perforation |
1980-06-12 | Perforation Treatment Performed - Fractured |
1984-06-30 | Well Fluid changed to Crude Oil |
1984-06-30 | Well Mode changed to Suspended |
1986-07-01 | Well Fluid changed to Crude Oil |
1986-07-01 | Well Mode changed to Pumping |
1990-06-06 | Perforation Treatment Performed - Jet Perforation |
1990-06-06 | Well Log Performed |
1990-06-12 | Well Log Performed |
1990-06-14 | Perforation Treatment Performed - Acid Wash - No Pressure |
1996-02-01 | Well Fluid changed to Crude Oil |
1996-02-01 | Well Mode changed to Suspended |
1998-12-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-12-09 | Plug Back Performed |
1998-12-09 | Well Fluid changed to Crude Oil |
1998-12-09 | Well Log Performed |
1998-12-09 | Well Mode changed to Abandoned Zone |
2007-11-14 | Perforation Treatment Performed - Cement Plug |
2007-11-14 | Plug Back Performed |
2007-11-15 | Perforation Treatment Performed - Jet Perforation |
2007-11-15 | Well Log Performed |
2007-11-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-11-16 | Perforation Treatment Performed - Remedial Casing |
2008-04-05 | Well Abandoned |
2008-04-05 | Well Fluid changed to Crude Oil |
2008-04-05 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1958-08-20 | Open Hole/Barefoot Completion | 1789.20 | 1818.40 | 0 |
1965-12-01 | Acid Treatment | 1709.90 | 1818.40 | 0 |
1970-05-31 | Acid Treatment | 1767.80 | 1818.40 | 0 |
1970-06-01 | Open Hole/Barefoot Completion | 1763.90 | 1818.40 | 0 |
1970-10-09 | Packing Device Capped w/Cement | 1780.60 | 1784.30 | 0 |
1974-03-11 | Cement Squeeze | 1763.90 | 1818.40 | 0 |
1974-03-26 | Perforation | 1762.40 | 1768.40 | 3 |
1980-06-02 | Cement Squeeze | 1762.40 | 1768.40 | 0 |
1980-06-09 | Perforation | 1798.40 | 1802.40 | 9 |
1980-06-12 | Fracture | 1798.40 | 1802.40 | 0 |
1990-06-06 | Perforation | 1791.00 | 1794.00 | 13 |
1964-09-09 | Open Hole/Barefoot Completion | 1755.60 | 1818.40 | 0 |
1990-06-14 | Acid Wash | 1791.00 | 1794.00 | 0 |
1998-12-09 | Packing Device Capped w/Cement | 1742.00 | 1750.00 | 0 |
2007-11-14 | Cement Plug | 1225.00 | 1565.00 | 0 |
2007-11-15 | Perforation | 594.00 | 595.00 | 17 |
2007-11-16 | Remedial Casing Cementing | 594.00 | 595.00 | 0 |
2007-11-16 | Packing Device Capped w/Cement | 576.00 | 584.00 | 0 |
1964-09-23 | Open Hole/Barefoot Completion | 1626.70 | 1818.40 | 0 |
1964-09-28 | Acid Wash | 1789.20 | 1818.40 | 0 |
1964-09-29 | Acid Treatment | 1761.70 | 1773.90 | 0 |
1964-09-30 | Acid Treatment | 1734.30 | 1755.60 | 0 |
1964-10-01 | Acid Treatment | 1706.90 | 1728.20 | 0 |
1964-10-06 | Open Hole/Barefoot Completion | 1709.90 | 1818.40 | 0 |
1965-11-30 | Acid Wash | 1709.90 | 1818.40 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 0 | 0.0 | 0.0 | 0.0 |
1968 | 1128 | 0.0 | 0.0 | 0.0 |
1969 | 7161 | 0.0 | 0.0 | 0.0 |
1970 | 7595 | 0.0 | 0.0 | 0.0 |
1971 | 7459 | 0.0 | 0.0 | 0.0 |
1972 | 8122 | 0.0 | 0.0 | 0.0 |
1973 | 5154 | 0.0 | 0.0 | 0.0 |
1974 | 3850 | 0.0 | 0.0 | 0.0 |
1975 | 3910 | 0.0 | 0.0 | 0.0 |
1976 | 2263 | 0.0 | 0.0 | 0.0 |
1977 | 3037 | 0.0 | 0.0 | 0.0 |
1978 | 2752 | 0.0 | 0.0 | 0.0 |
1979 | 2603 | 0.0 | 0.0 | 0.0 |
1980 | 2939 | 0.0 | 0.0 | 0.0 |
1981 | 6686 | 0.0 | 0.0 | 0.0 |
1982 | 7498 | 0.0 | 0.0 | 0.0 |
1983 | 1818 | 0.0 | 0.0 | 0.0 |
1986 | 4316 | 0.0 | 0.0 | 0.0 |
1987 | 8147 | 0.0 | 0.0 | 0.0 |
1988 | 7411 | 0.0 | 0.0 | 0.0 |
1989 | 4446 | 0.0 | 0.0 | 0.0 |
1990 | 2274 | 0.0 | 0.0 | 0.0 |
1992 | 503 | 0.0 | 0.0 | 0.0 |
For data sources see[5]