X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515030615002

Well Details

Well ID: 0515030615002
Loading map...
Location: 00/15-06-051-03W5/2
Location Alias: 00/15-06-51-03 W5M
Location Alias 2: 00/15-06-051-03 W5/02
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 03
Section: 06
County/Municipality: Parkland County
Well Name: NEW STAR HIGHVALE 15-6-51-3
Operator Name: New Star Energy Ltd.
License Number: 0334676
License Date: 2005-07-15
License Status: Suspension
Spud Date: 2005-07-24
Final Drill Date: 2005-08-01
Well Total Depth: 1671.00 m
Surface Hole Latitude: 53.375367
Surface Hole Longitude: -114.434650

For data sources see[1][2]

Well History

Date Event
2005-07-15 Obtained License
2005-07-24 Surface Casing Operation Performed
2005-07-26 Direction Drilling Operation Performed - Deviate
2005-07-30 Drill Stem Test Performed
2005-07-30 Well Log Performed
2005-08-01 Finished Drilling
2005-08-01 Production Casing Operation Performed
2005-08-01 Rig Released
2005-08-01 Well Mode changed to Drilled and Cased
2005-08-15 Well Log Performed
2005-08-16 Perforation Treatment Performed - Jet Perforation
2005-08-16 Well Log Performed
2005-08-22 Perforation Treatment Performed - Jet Perforation
2005-08-26 Well Log Performed
2005-08-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-02-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-02-10 Perforation Treatment Performed - Jet Perforation
2006-02-10 Plug Back Performed
2006-02-10 Well Log Performed
2006-04-29 Perforation Treatment Performed - Jet Perforation
2006-04-29 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2006-04-29 Well Log Performed
2006-11-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-11-16 Perforation Treatment Performed - Jet Perforation
2006-11-16 Plug Back Performed
2006-11-16 Well Log Performed
2006-11-16 Well Mode changed to Abandoned Zone
2019-07-31 Well Log Performed
2019-08-21 Perforation Treatment Performed - Cement Plug
2019-08-21 Plug Back Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2005-07-26 312.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-08-16 Perforation 1644.00 1646.00 17
2006-11-16 Packing Device Capped w/Cement 1559.00 1567.60 0
2006-11-16 Perforation 1547.00 1549.00 17
2019-08-21 Cement Plug 1285.00 1535.00 0
2005-08-22 Perforation 1619.00 1627.00 17
2005-08-27 Acid Treatment 1619.00 1646.00 0
2005-09-01 Acid Treatment 1619.00 1627.00 0
2006-02-10 Packing Device Capped w/Cement 1609.30 1617.30 0
2006-02-10 Perforation 1602.00 1604.00 17
2006-02-10 Perforation 1605.00 1606.00 17
2006-04-29 Packing Dev Cpd w/Res-Gyp Cem 1596.00 1599.30 0
2006-04-29 Perforation 1569.50 1570.50 17

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-08-22 No Incident Encountered 0.00 0.00

For data sources see[6]

References