X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515040108000

Well Details

Well ID: 0515040108000
Loading map...
Location: 00/08-01-051-04W5/0
Location Alias: 00/08-01-51-04 W5M
Location Alias 2: 00/08-01-051-04 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 04
Section: 01
County/Municipality: Parkland County
Well Name: ANDEX COLGAS HIGHVALE 8-1-51-4
Operator Name: New Star Energy Ltd.
License Number: 0097080
License Date: 1982-08-19
License Status: Abandoned
Spud Date: 1982-08-21
Final Drill Date: 1982-08-29
Well Total Depth: 1580.00 m
Surface Hole Latitude: 53.372788
Surface Hole Longitude: -114.444950

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-08-19 Obtained License
1982-08-27 Kick Occurred
1982-08-29 Finished Drilling
1982-08-29 Well Log Performed
1982-08-29 Well Mode changed to Drilled and Cased
1982-08-30 Drill Stem Test Performed
1982-08-31 Drill Stem Test Performed
1982-09-01 Production Casing Operation Performed
1982-09-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-09-11 Perforation Treatment Performed - Jet Perforation
1982-09-12 Well Began Production
1982-09-12 Well Fluid changed to Gas
1982-09-12 Well Mode changed to Flowing
1982-09-14 Well Fluid changed to Gas
1982-09-14 Well Mode changed to Suspended
1994-01-16 Perforation Treatment Performed - Cement Squeeze
1994-01-16 Plug Back Performed
1994-01-16 Well Fluid changed to Gas
1994-01-16 Well Mode changed to Abandoned Zone
1994-01-17 Perforation Treatment Performed - Jet Perforation
1994-01-18 Well Log Performed
1994-01-22 Perforation Treatment Performed - Fractured
1995-01-18 Well Log Performed
1996-01-12 Well Log Performed
2017-05-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-05-26 Plug Back Performed
2018-02-14 Well Log Performed
2018-02-20 Perforation Treatment Performed - Jet Perforation
2018-02-21 Perforation Treatment Performed - Cement Squeeze
2018-02-22 Perforation Treatment Performed - Jet Perforation
2018-02-23 Perforation Treatment Performed - Cement Squeeze
2018-02-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-02-24 Perforation Treatment Performed - Jet Perforation
2018-02-25 Perforation Treatment Performed - Jet Perforation
2018-02-25 Well Log Performed
2018-02-26 Perforation Treatment Performed - Cement Squeeze
2018-02-27 Well Log Performed
2018-02-28 Perforation Treatment Performed - Jet Perforation
2018-02-28 Well Log Performed
2018-03-01 Perforation Treatment Performed - Cement Squeeze
2018-03-02 Perforation Treatment Performed - Cement Squeeze
2018-03-02 Perforation Treatment Performed - Jet Perforation
2018-03-02 Well Log Performed
2018-03-03 Well Log Performed
2018-03-06 Perforation Treatment Performed - Jet Perforation
2018-03-06 Well Log Performed
2018-03-07 Perforation Treatment Performed - Cement Squeeze
2018-03-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-03-08 Well Log Performed
2018-03-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-03-09 Well Log Performed
2018-03-24 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-09-11 Perforation 1520.00 1525.00 13
2018-02-23 Cement Squeeze 595.00 596.00 0
2018-02-24 Perforation 506.00 507.00 17
2018-02-24 Packing Device Capped w/Cement 495.00 503.00 0
2018-02-24 Perforation 523.00 524.00 17
2018-02-24 Packing Device Capped w/Cement 513.00 521.00 0
2018-02-25 Perforation 465.00 466.00 17
2018-02-26 Cement Squeeze 465.00 466.00 0
2018-02-28 Perforation 425.00 426.00 17
2018-02-28 Perforation 386.00 387.00 17
2018-02-28 Perforation 445.00 446.00 17
1982-09-11 Acid Treatment 1520.00 1525.00 0
2018-03-01 Cement Squeeze 445.00 446.00 0
2018-03-01 Cement Squeeze 386.00 387.00 0
2018-03-01 Cement Squeeze 425.00 426.00 0
2018-03-02 Cement Squeeze 362.00 363.00 0
2018-03-02 Perforation 362.00 363.00 17
2018-03-06 Perforation 272.00 273.00 17
2018-03-07 Cement Squeeze 272.00 273.00 0
2018-03-08 Packing Device Capped w/Cement 94.00 103.00 0
2018-03-09 Packing Device Capped w/Cement 29.00 54.50 0
1994-01-16 Cement Squeeze 1520.00 1525.00 0
1994-01-17 Perforation 1508.00 1510.00 13
1994-01-22 Fracture 1508.00 1510.00 0
2017-05-26 Packing Device Capped w/Cement 1487.00 1495.00 0
2018-02-20 Perforation 1142.50 1143.50 17
2018-02-21 Cement Squeeze 1142.50 1143.50 0
2018-02-22 Perforation 595.00 596.00 17

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1982-08-27 Kick 1519.00 1519.00
2018-03-24 No Incident Encountered 0.00 0.00

For data sources see[5]

References